ABSTRACT
This thesis evaluates the construction of small earth dams using the labour-based/light equipment supported technique. Actual cases of dam construction at three different locations in Nigeria have been used as case studies. Data from these projects were used to simulate likely construction costs using the labourbased technique and the traditional equipment-based technique. The results were used to compare the two techniques. Construction costs, duration of construction and employment generation were used as major indices for comparison. Two innovavite approaches of method statement and the time and location chart were used to determine inputs needed under each construction technique. The methods were found to be appropriate in ensuring consistency work planning, a quality that hitherto had been the main drawback of the labour-based technique. Under the labour-based technique, construction costs for the projects were N279.279.00, N4,670,573.00 and M6,198,125.00 while construction duration were 25 weeks, 30 weeks and 40 weeks respectively. The corresponding cost figures for the equipment-based technique were N585,152.00, H7,570,737.00 and N10,711,285.00 while construction duration were 7 weeks, 29 weeks and 39 weeks respectively. The simulated figures were found to be within 12% of actual construction costs. The labour-based technique was found to have about 40% reduction in the total construction cost and potentials for generating 10 times more employment than the equipment-based technique. Over 80% of such employment would acrue to unskilled workers who could come from the locality of construction site.The results of this study have therefore shown that labourbased technique in comparison with equipment-based methods are cheaper, execution time compatible, quality of work comparable, it utilises local resources more extensively and boost the local economy through employment generation.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 99       🧠 Words: 6891       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 289      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

EVALUATION OF HOT- GAS AND HEATED TOOL WELDMENTS OF POLYPROPYLENE/BONE PARTICULATE COMPOSITES EFFECT OF FAULTY DESIGN AND CONSTRUCTION ON BUILDING MAINTENANCE DESIGN, CONSTRUCTION AND TESTING OF A FLUIDISED BED COMBUSTION BOILER FOR ENERGY PRODUCTION DEVELOPMENT AND PERFORMANCE EVALUATION OF AN AGITATED QUENCHING TANK/BATH A COMPARATIVE EVALUATION OF THE FIXED ROUTE AND ROUTEDEVIATION STRATEGIES OF OPERATING INTRA-URBAU TRANSIT DESIGN, CONSTRUCTION AND PERFORMANCE EVALUATION OF AN AXIAL-FLOW MILLET THRESHER FAILURE COST ANALYSIS OF HUMAN ERRORS IN REINFORCED CONCRETE BEAM CONSTRUCTION DESIGN, CONSTRUCTION AND TESTING OF A CHARCOAL FIRED CRUCIBLE FURNACE FOR MELTING OF 10KG OF ALUMINIUM DESIGN AND CONSTRUCTION OF A LIGHT ACTIVATED REMOTE CONTROLLED FAN REGULATOR SCALABILITY EVALUATION AND IMPROVEMENT IN IP-BASED CAMPUS NETWORKS: A CASE STUDY OF AHMADU BELLO UNIVERSITY ZARIA NETWORK DEVELOPMENT AND PERFORMANCE EVALUATION OF GOVERNOR CONTROL APPARATUS EVALUATION OF SOME PLANT EXTRACTS AS CORROSION IN HIBITORS FOR Al – 7.0 % Si – 0.35 % Mg ALLOY IN 3.5 % NaCl AQUEOUS SOLUTION TECHNO-ECONOMIC EVALUATION OF SELEXOL-BASED CO2 CAPTURE PROCESS FOR ASHAKA CEMENT PLANT EVALUATION OF WATER ADVANCE MODELS FOR FURROW IRRIGATION SYSTEM ECONOMIC EVALUATION OF PAVEMENT OVERLAY DESIGN STRATEGIES DESIGN, SIMULATION ,CONSTRUCTION AND TESTING OF A THERMOSYPHON SOLAR WATER HEATER FOR A BLOCK IN POSTGRADUATE HOSTEL APPLICATION OF FIBRE REINFORCED CONCRETE IN THE DESIGN AND CONSTRUCTION OF TENSION CONTROLLED STRUCTURES PROBABILISTIC EVALUATION OF HORIZONTALLY CURVED ALUMINIUM ALLOY BRIDGE DECKS ON STEEL GIRDERS EVALUATION OF THESTRUCTURAL PERFORMANCE OF ASPHALTIC CONCRETE HIGHWAY PAVEMENT UP-GRADING OF AGBADO-OKUDU IRON ORE USING MAGNETIC SEPARATION AND SHAKING TABLE TECHNIQUES

click on whatsapp