Site Logo E-PROJECTTOPICS

MODELLING AND CONTROL OF MULTI PROCESS SYSTEM USING BOND GRAPH AND DECENTRALIZED MODEL PREDICTIVE CONTROLTECHNIQUE


📝


Presented To


Engineering Department

📄 Pages: 81       🧠 Words: 8351       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 349      

⬇️ Download (Complete Report) Now!

ABSTRACT
This research proposes a simplified approach to the modelling of quadruple tank system via the use of bond graph technique. The novelty of this approach is that quadruple tank system equations are easier to obtain. In addition, the process of obtaining the system equations is less prone to error because of the use of the pictorial advantage of bond graph. This is an advantage for complex systems such as Multi Input Multi Output (MIMO) systems. The 20-SIM software (bond graph technique software) was used in this work. In order to address the inherent multivariable constraint issues of the quadruple tank system such as looping and coupling effects, while minimizing the cost of control, the quadruple tank system was partitioned into Single Input Single Output (SISO) systems. This established the basis for the implementation of the Decentralized Model Predictive Control (DMPC) for the quadruple tank system. Due to the numerical ill-conditioning of the system state equations, a Quadratic Programming (QP) based scheme with inequality constraints was adopted. This was implemented in the Control toolbox of MATLAB. The classical predictive control scheme, achieved control horizon of a numerical value of one, and prediction horizon has values between 1 and fifty with an average settling time of 0.8439 seconds. However, the QPDMPC schemes' control horizon (M 10) and prediction horizon (M ) accommodating increasing values (infinite horizon) with time while the settling time of 0.04 seconds was attained. Validation of the controllers was carried out relative to classical PID controller.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 81       🧠 Words: 8351       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 349      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

ASSESSMENT OF GROUNDWATER POTENTIAL ZONES IN OKEERO LGA OF KWARA STATE NIGERIA USING GIS-BASED INTEGRATED APPROACH MODELING OF WATER QUALITY OF BINDARE STREAM IN ZARIA-NIGERIA USING MATLAB Bandwidth Management Using IP Traffic Analysis DEVELOPMENT OF A PILOT ALLOCATION PROTOCOL TO MITIGATE THE EFFECT OF PILOT CONTAMINATION IN MASSIVE MULTIPLE INPUT MULTIPLE OUTPUT SYSTEM PERFORMANCE EVALUATION OF MINI SPRINKLER IRRIGATION SYSTEM: COMPARISON OF THE PLASTIC AND IRON MADE SPRINKLER SYSTEM ASSESSMENT OF GROUNDWATER POTENTIAL FOR RURAL WATER SUPPLY SCHEME USING GEOGRAPHIC INFORMATION SYSTEM (GIS) IN EDE NORTH LGA OF OSUN STATE NIGERIA INCORPORATION OF RELIABILITY INTO NIGERIAN EMPIRICAL MECHANISTIC PAVEMENT ANALYSIS AND DESIGN SYSTEM (NEMPADS) CHARACTERIZATION OF SOKOTO PHOSPHATE ROCK AND DESIGN OF PROCESS FLOWSHEET FOR ITS BENEFICIATION COMPILATION OF CADASTRAL CONTROLS OF KATSINA TOWNSHIP PREDICTION OF LINK RELIABILITY IN A WIRELESS MOBILE AD HOC NETWORK (MANET) DUE TO PATH LOSS EFFECTS USING WEIBULL DISTRIBUTION THE USE AND PERFORMANCE OF FISH FOR POLISHING EFFLUENT FROM WASTE STABILIZATION POND SYSTEM DESIGN AND USE OF A MODEL CONSTRUCTED HORIZONTAL SUBSURFACE FLOW WETLAND FOR TREATING TANNERY WASTEWATER BY MEANS OF AQUATIC PLANTS MANUFACTURING SYSTEM OPTIMIZATION: A STUDY OF UNITY AND EFFICIENCY IN PRODUCTION (UEP) IN PEUGEOT AUTOMOBILE NIGERIA (PAN) TIME AND COST PERFORMANCE LIABILITY ALLOCATION IN THE BUILDING PROCESS COST MODELLING FOR ROAD ACCIDENTS IN NIGERIA MODELLING ANNUAL MAXIMUM FLOOD OF RIVER KADUNA SEPARATION OF TANTALUM AND NIOBIUM FROM NIGERIAN TANTALITE USING AQUEOUS BIPHASE SYSTEM PERSPECTIVES ON MACROCELL PROPAGATION MODELS AND ANALYSIS DEVELOPMENT OF CONCEPTUAL MODELS FOR PLANTS AND EQUIPMENT PROCUREMENT IN TERTIARY INSTITUTIONS IN KADUNA STATE DESIGN, DEVELOPMENT AND PERFORMANCE EVALUATION OF A MULTIPLE SANDCRETE BLOCKS MOULDING MACHINE

click on whatsapp