Site Logo E-PROJECTTOPICS

COST EVALUATION OF ROAD TRAFFIC ACCIDENT IN NIGERIA USING HUMAN CAPITAL APPROACH

(A CASE STUDY OF ABUJA-LOKOJA ROAD)


πŸ“


Presented To


Engineering Department

πŸ“„ Pages: 93       🧠 Words: 11989       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 311      

⬇️ Download (Complete Report) Now!

ABSTRACT
Nigeria experiences the highest rate of road traffic accidents resulting in fatalities and various levels of injuries. On Abuja-Lokoja road, traffic accident takes the lion's share of the risk having highest number of vehicular accidents withcorresponding fatalities and injurieswhich has a great impact on cost and the socio-economic development of the society. It is therefore necessary to gauge the monetary value of these losses in order to highlight the extent of damage incurred to society as a whole. This research is focused on using Gross-Output Model or Human Capital Approach to compute the cost of traffic accident on Abuja-Lokoja road. The aim of this research is to formulate a model that can be used for estimating the total cost of road accidents at all levels of severity. The extent of injury levels, property damaged and general cost resultingfrom an accident using secondary data were obtained from thePolices, Research and Statistics department of the Federal Road Safety Corps (FRSC) for a period of eleven years (2000-2010).The research was carried out with the aid of questionnaires and interview. The data collected were analyzed using the percentage frequency distribution table and the result was used to cost the property damage cost and the medical cost. The accident cost was decomposed and quantified based on the accident severity levels.The cost per fatal accident isN 24, 853, 524, the cost per of serious injuries accident isN633.520, and the cost of per minor accident isN 10, 575. 36, the total human cost isN 55, 714, 330,477, the total properties cost isN 890, 067, 000, the police administrative cost isN 65, 446, 757. 76 and the total accident cost isN 56,669,844,234.Therefore the cost per vehicle per kilometer is N 60,804.03Km-1, the cost per kilometer is N318,369,911 Km-1for Abuja-Lokojaroad. This result is in agreement with other researches carried out using gross output method.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

πŸ“„ Pages: 93       🧠 Words: 11989       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 311      

⬇️ Download (Complete Report) Now!

πŸ”— Related Topics

EFFECT OF CALCINATION TEMPERATURE ON THE COMPOSITION AND PHOTOCATALYTIC ACTIVITY OF NIGERIAN NATURAL ILMENITE, SPHALERITE AND WOLFRAMITE EVALUATION OF PALM KERNEL SHELL ASH AS AN ADDITIVE FOR THE STABILIZATION OF BLACK COTTON SOIL SUITABILITY OF SOME COMMON NIGERIAN TIMBER SPECIES FOR USE AS SIMPLY SUPPORTED BRIDGE BEAMS USING EUROCODESSUITABILITY OF SOME COMMON NIGERIAN TIMBER SPECIES FOR USE AS SIMPLY SUPPORTED BRIDGE BEAMS USING EUROCODES MODELING OF WATER QUALITY OF BINDARE STREAM IN ZARIA-NIGERIA USING MATLAB FAILURE COST ANALYSIS OF HUMAN ERRORS IN REINFORCED CONCRETE BEAM CONSTRUCTION DESIGN,CONSTRUCTION AND EXPERIMENTAL EVALUATION OFTHEPRODUCTSOF A LOW COST BRIQUETTE MACHINE FOR RURAL COMMUNITIES IN NIGERIA MATHEMATICAL MODELLING OF DRAUGHT CHARACTERISTICS OF SELECTED ANIMAL-DRAWN IMPLEMENTS ON THE UPLAND SOILS OF SAMARU, NIGERIA RAINFALL DATA GENERATION FOR SAMARU, ZARIA USING STATISTICAL PARAMETERS DEVELOPMENT OF ADSORBENTS AND PHOTOCATALYSTS USING NIGERIAN PINDIGA BENTONITIC CLAY DEVELOPMENT OF A SENSITIVITY INDEX BASED TECHNIQUE FOR UNIFIED POWER FLOW CONTROLLER PLACEMENT WITH CONTINGENCY ANALYSIS ON NIGERIA 330kV TRANSMISSION NETWORK THE USE OF RICE HUSK ASH AS A STABILIZING AGENT FOR LATERITIC SOILS IN THE MANUFACTURE OF BLOCKS FOR LOW COST HOUSING DEVELOPMENT AND PERFORMANCE EVALUATION OF A FOUR ROW ANIMAL DRAWN MAIZE SEED PRECISION PLANTER ESTIMATION OF DETECTION THRESHOLD FOR SPECTRUM SENSING IN COGNITIVE RADIO USING ADAPTIVE NEUROFUZZY INFERENCE SYSTEM AND MONTE CARLO TECHNIQUES FLOOD RISK ASSESSMENT OF OFU RIVER CATCHMENT IN NIGERIA PERFORMANCE EVALUATION OF MINI SPRINKLER IRRIGATION SYSTEM: COMPARISON OF THE PLASTIC AND IRON MADE SPRINKLER SYSTEM MODELLING AND OPTIMIZATION OF PID CONTROLLER’s PARAMETERS FOR DEEP SPACE ANTENNA POSITIONING SYSTEM USING GENETIC ALGORITHM PRODUCTION AND PERFORMANCE EVALUATION OF BIODIESEL FROM HIBISCUS SABDARIFFA AND HIBISCUS SURATTENSIS COMPARATIVE STUDIES OF THE PERFORMANCE OF FILTER MEDIA MADE USING BIOCHAR AND ACTIVATED CARBON IN GREYWATER REMEDIATION DEVELOPMENT OF MULTICAST ALGORITHM FOR THE DETERMINATION OF MINIMUM COST OF BANDWIDTH OVER CODED PACKET WIRELESS NETWORK MODIFICATION AND PERFORMANCE EVALUATION OF IAR GROUNDNUT SHELLER FOR SOME SELECTED VARIETIES OF PULSES

click on whatsapp