Site Logo E-PROJECTTOPICS

MODELLING OF COST OVERRUNS IN BUILDING PROJECTS IN ABUJA


📝


Presented To


Environmental Design Department

📄 Pages: 86       🧠 Words: 11537       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 238      

⬇️ Download (Complete Report) Now!

ABSTRACT
Construction of building projects is an endeavour that involves capital expenditure, which is either borrowed or self-financed by clients. The expected outcome of such expenditure is value for money, which is usually dictated by project objectives of cost, time and quality. Project cost, as a project objective, is a crucial determinant of project success in the prevailing economic challenges being experienced globally. Construction cost overrun has become a reoccurring phenomenon in the delivery of building projects. The major thrust of this study was to identify, analyse and model the factors that contribute to building construction cost overruns in Abuja. The study adopted a Monte-Carlo technique in simulating cost overrun using DiscoverSim version 1.1 (SigmaXL, 2013) simulation and RiskAmp Microsoft Excel add-in software to analyse data obtained from literature review, review of project documents with contract sum of over Five Million Naira executed within Abuja city in addition to interview sessions with construction professionals. The study revealed that significant cost overruns are mainly due to re-measurement and variation. The simulation result elucidated that less than 10% of building projects are completed below the initial contract sum in Abuja which could be due to the fact that projects tend to be initiated and executed without adequate project information such as client brief, design details and specifications. The study recommends the need for minimizing occurrence of re-measurement in building projects through provision of full design information prior to contract award, development of simulation model for specific project categories and establishment of a project cost overrun band that will enable a scientific measurement of project's value for money benchmarked against initial cost estimate.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 86       🧠 Words: 11537       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 238      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

USER SATISFACTION STUDY OF SELECTED PUBLIC–PRIVATE PARTNERSHIP PROJECTS AN ASSESSMENT OF LIFT SYSTEM PERFORMANCE IN SELECTED HIGH RISE BUILDINGS IN ABUJA CITY TOWARDS EVOLVING SUITABLE MODULAR SIZES FOR EFFECTIVE FLEXIBILITY IN ACADEMIC LIBRARY BUILDINGS: A PROPOSAL FOR FEDERAL UNIVERSITY OF TECHNOLOGY MINNA, LIBRARY COMPLEX EVALUATION OF COST RECOVERY FOR WATER SUPPLY IN MAKURDI EVALUATING ENERGY EFFICIENCY IN THE DESIGN OF LARGE SCALE OFFICE BUILDING IN HOT-DRY CLIMATE OF NIGERIA FINANCING URBAN INFRASTRUCTURE DEVELOPMENT PROJECTS : AN ANALYSIS OF THE STRATEGIES USED IN KADUNA AN APPRAISAL OF THE READINESS OF NIGERIAN BUILDING CONSULTING FIRMS TO ADOPT LEAN CONSTRUCTION PRINCIPLES An Investigation into the conditions of contract with regards to claims in some selected building projects REDEVELOPMENT OF SOKOTO AIRPORT TERMINAL BUILDING BUILDING MAINTENANCE POLICY FORMULATION: A Market Oriented Approach AN EXPLORATION OF VWANA COSTUMES FOR SCULPTURAL DECORATIVE COLUMNS ELECTRICAL ENERGY EFFICIENCY IMPROVEMENT IN COMMERCIAL BUILDINGS MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA PROPOSAL FOR PRIVATE AIRLINES TERMINAL BUILDING MURTALA MOHAMMED AIRPORT LAGOS ASSESSMENT OF THE IMPLEMENTATION OF ABUJA TOURISM DEVELOPMENT MASTER PLAN (2000 – 2010) A STUDY OF MWAGHAVUL FESTIVAL COSTUMES IN PLATEAU STATE ASSESSMENT OF NIGERIAN NATIONAL CARNIVAL COSTUME AND ITS REBRANDING FOR GREATER APPRECIATION AN EVALUATION OF ENERGY CONSUMPTION AND CONSERVATION OPPORTUNITIES FOR BUILDINGS AT NATIONAL RESEARCH INSTITUTE FOR CHEMICAL TECHNOLOGY ZARIA MODELING DURATION OF BUILDING RENOVATION PROJECTS AN ASSESSMENT OF THE VARIABILITY OF COST AND TIME RELATED ITEMS OF PRELIMINARIES IN BUILDING CONTRACTS IN NIGERIA

click on whatsapp