AN ASSESSMENT OF THE VARIABILITY OF COST AND TIME RELATED ITEMS OF PRELIMINARIES IN BUILDING CONTRACTS IN NIGERIA


πŸ“


Presented To


Environmental Design Department

πŸ“„ Pages: 83       🧠 Words: 10413       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 319      

⬇️ Download (Complete Report) Now!

ABSTRACT
Preliminaries in building construction contracts are allowed for the support services provided on to the main work. Some studies show that they account for as much as ten percent (10%) of the total cost of the contract. There has not been any precise approach to the determination of the total cost of what should consist of preliminaries. This study seeks to establish the variability in the total cost of preliminaries in building projects and that of the various items. The main objective was to establish the cost significant items of preliminaries and to provide guide to assist practitioners in the pricing and management of preliminaries in building contract. The method adopted involved the collection of primary data on completed projects and the administration of questionnaires. Sixty (60) completed projects were studied and sixty (60) questionnaires sent out. Forty five (45) of the questionnaires were completed and returned by respondents. The data collected were analysed using some statistical tools such as the measure of central tendency, test of significance and regression analysis. The results revealed that provision of preliminaries is very important in the execution of building contract and that the most appropriate method of pricing and valuing them is to consider the individual items. The study showed that there exists very high variability in the provision of preliminaries among various projects as well as among the various items of preliminaries. Strong positive relationship (r = 0.974 - 0.999) exist between the initial and final sums of the various preliminaries item. The study concluded that preliminaries are an indispensable part of construction contract execution for efficient delivery. The pricing of the various items that constitute the preliminaries can ensure adequate provision for this important element of a building contract. Therefore, it is recommended that consultants give detail information on the items so that they can be priced to reduce variability.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

πŸ“„ Pages: 83       🧠 Words: 10413       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 319      

⬇️ Download (Complete Report) Now!

πŸ”— Related Topics

AN ASSESSMENT OF TOURISM POTENTIALS EVALUATION OF PROJECT RISK AND THE DETERMINATION OF CONTINGENCY SUM FOR BUILDING DEVELOPMENTS IN NIGERIA AN ASSESSMENT OF LIFT SYSTEM PERFORMANCE IN SELECTED HIGH RISE BUILDINGS IN ABUJA CITY AN ASSESSMENT OF THE INFLUENCE OF COMBUSTION GENERATED POLLUTANTS ON THE INDOOR AIR QUALITY OF SELECTED LABORATORIES A CONCEPTUAL EXPLORATION OF NIGERIA'S HISTORICAL EXPERIENCES IN CLAY FORM AN ASSESSMENT OF PARTICIPATION IN OUTDOOR RECREATION ACTIVITIES IN YENAGOA TOWN COMMUNITY BUILDINGS COMPLEX AN APPRAISAL OF THE IMPLEMENTATION OF THE KANO COMPREHENSIVE TOURISM MASTERPLAN, NIGERIA. ASSESSMENT OF TOURISTS PERCEPTION OF THE YANKARI GAME RESERVE AS A TOURIST DESTINATION LOCAL GOVERNMENT SECRETARIAT, SAMINAKA (EXPRESSION OF CULTURE ON THE ARCHITECTURE OF PUBLIC BUILDINGS IN KADUNA STATE) AN ASSESSMENT OF CONTRACTOR’S RISKS EXPOSURE WITHIN SOME STANDARD FORMS OF BUILDING CONTRACT IN NIGERIA EXPLORATION OF CLAY FROM ANKPA NIGERIA, FOR THE PRODUCTION OF EARTHENWARE AND STONEWARE CERAMICS KNOWLEDGE MANAGEMENT PRACTICE OF BUILDING CONSTRUCTION FIRMS AT PROJECT LEVEL Assessment of the Impact of Contraventions of Building Regulations on the Architecture of Mixed Landuse Areas of Kano Metropolis AN ASSESSMENT OF JOS PLATEAU VOLCANIC DEPOSITS AS POZZOLANS AND ITS EFFECT ON BLENDED ORDINARY PORTLAND CEMENT CONCRETE UNRRODUCTIVE COSTS IN BUILDING PROJECTS A STUDY OF CONTEMPORARY PUBLIC OUTDOOR SCULPTURES IN FOUR SELECTED STATES IN WESTERN NIGERIA IMPLEMENTATION OF URBAN PHYSICAL PLANNING SCHEMES IN NIGERIA ENVIRONMENTAL RESPONSIBILITY AND PERFORMANCE OF QUOTED OIL COMPANIES IN NIGERIA ANALYTICAL AND APPROXIMATE VARIANCE OF PUBLIC BUILDING TOTAL PROJECT COST, ESTIMATION BY MEAN COMPONENT COSTS METHOD

click on whatsapp