Site Logo E-PROJECTTOPICS

RELIABILITY OF THE ENGINEERS ESTIMATE IN SELECTIVE TENDERING FOR BUILDING WORKS


πŸ“


Presented To


Environmental Design Department

πŸ“„ Pages: 81       🧠 Words: 9274       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 75      

⬇️ Download (Complete Report) Now!

ABSTRACT
This research work deals with the investigation of the reliability or otherwise of the engineer's estimate in selective tendering for building works. The term 'engineer's estimate' as used in this work means the estimated cost of a building normally prepared for the client by his construction cost consultants just before or during tender period,based on the same tender documents given to selected tenderers. In this work, the bills of quantities forms part of the tender documentation. This estimate is also referred to as comparative or pre-tender or QS estimate. The investigation is limited to pre-contract stages of the building process. As a result of this, the investigation dealt mainly with the question of how reliable the engineers estimate is to the client, in terms of getting responsible tenders and awarding the contract within not more than +10 percent difference from the engineers estimated cost. It has been discovered during the investigation that clients rely heavily on the engineers estimate to the extent that for a contractor to win a contract for building works, his tender should not differ by more than +10 percent of the engineers or QS estimate. In addition to this, it has also been discovered that strict reliance on the engineers estimate, especially in cases where the trend of tenders reveal otherwise, might result in unpleasant post contract problems such as escalation of costs and possible delay or abandonment of the project. This is because the engineers estimate is not 100 percent reliable. As such, in cases where majority of tenders received differ very significantly from the engineers estimate, then the accuracy or otherwise of the engineers estimate should be looked into. Recommendations on how to improve the reliability of the engineers estimate are proposed in the conclusions. In general, this work has helped to bring out some problems in tendering as well as preparation of tender documents and pricing. It is hoped that the result of this research will be of immense benefit to the Government, various members of the Construction Industry and the general public.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

πŸ“„ Pages: 81       🧠 Words: 9274       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 75      

⬇️ Download (Complete Report) Now!

πŸ”— Related Topics

AN ASSESSMENT OF LIFT SYSTEM PERFORMANCE IN SELECTED HIGH RISE BUILDINGS IN ABUJA CITY A CONTEXTUAL ANALYSIS OF SELECTED ART WORKS ON PEACE AND CONFLICT RESOLUTION A STUDY OF TEACHERS' ASSESSMENT OF CHILDREN'S CREATIVE ART WORKS IN SOME PRIMARY SCHOOLS AN APPRAISAL OF THE READINESS OF NIGERIAN BUILDING CONSULTING FIRMS TO ADOPT LEAN CONSTRUCTION PRINCIPLES ASSESSMENT OF HUMAN RESOURCE MANAGEMENT PRACTICES OF BUILDING CONSTRUCTION FIRMS AN ASSESSMENT OF CONTRACTOR’S RISKS EXPOSURE WITHIN SOME STANDARD FORMS OF BUILDING CONTRACT IN NIGERIA MODELING DURATION OF BUILDING RENOVATION PROJECTS REDEVELOPMENT OF SOKOTO AIRPORT TERMINAL BUILDING INFLUENCE OF CLIENT ORGANISATION ON ACHIEVING VALUE IN BUILDING DESIGNS CENTRE FOR PROFESSIONAL EXCELLENCE FOR THE NIGERIAN BUILDING INDUSTRY: DESIGN CONSIDERATIONS FOR PROFESSIONAL HARMONY AN EVALUATION OF THE ENVIRONMENTAL FACTORS THAT LEAD TO ABANDONMENT OF PUBLIC BUILDING PROJECTS EXPLORING BUILDING ENVELOPE DESIGN FOR WARM HUMID ZONES TO OPTIMIZE INDOOR THERMAL COMFORT IN THE DESIGN OF A PROPOSED LEKKI FREE TRADE ZONE RESORT, LAGOS UNRRODUCTIVE COSTS IN BUILDING PROJECTS USER REQUIREMENTS IN THE DESIGN OF MULTI-STOREY RESIDENTIAL BUILDINGS USE OF BUILDING FORMS AS ACOUSTICAL TREATMENT IN THE DESIGN OF AN IDOMA CULTURAL CENTRE Assessment of the Impact of Contraventions of Building Regulations on the Architecture of Mixed Landuse Areas of Kano Metropolis COMMUNITY BUILDINGS COMPLEX ENHANCING PASSIVE COOLING IN HEALTHCARE BUILDINGS USING COURTYARD FORMS IN THE DESIGN OF WOMEN AND CHILDREN HOSPITAL IN KADUNA STATE, NIGERIA EVALUATION OF PROJECT RISK AND THE DETERMINATION OF CONTINGENCY SUM FOR BUILDING DEVELOPMENTS IN NIGERIA AN EVALUATION OF CONTRIBUTION OF COST CONTINGENCY TOWARDS SUCCESSFUL EXECUTION OF BUILDING PROJECTS IN NIGERIA

click on whatsapp