MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA


📝


Presented To


Environmental Design Department

📄 Pages: 84       🧠 Words: 12412       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 296      

⬇️ Download (Complete Report) Now!

ABSTRACT
Following widespread acceptance by researchers that the effects of qualitative/managerial construction time-influencing factors need to be considered in project scope-based construction time predicting models, several multivariate models combining project scope and qualitative/managerial factors have been developed. However, it has been shown in literature that the applicability of these models is clearly limited to the regions/countries where they were developed. This study was therefore aimed at developing a multivariate construction time predicting model that will be applicable to the Nigeria construction industry. A self-administered questionnaire survey was used to source information on the quantitative (project scope) factors considered in the study as well as to assess the extent of influence of the qualitative factors on construction time. Principal component regression was used for the data analysis and model development, using SPSS 16.0 for windows. Following a non-normal distribution of errors and a low R2 value obtained when multiple linear regression analysis was first conducted, the study's data set was double log transformed and then partitioned/reclassified to account for public and private sector projects. Three models were developed following the multiple linear regression analysis repeated after transforming and partitioning/reclassifying the study's data set. Two of these models (the public sector model and the private sector model) had high R2 values and were found after testing and validation, to be suitable for predicting construction time, while one of the models (the all projects model) had a low R2 value and was consequently found to be unsuitable for predicting construction time. The models with high R2 values serve as a useful tool to project managers and contractors for predicting construction time, thereby facilitating effective planning.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 84       🧠 Words: 12412       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 296      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

FRAMEWORK FOR SUSTAINABLE DESIGN OF PHOTOVOLTAIC HOME SYSTEMS IN NORTH-WESTERN NIGERIA ANALYSIS OF THE RELATIONSHIP BETWEEN ORGANISATIONAL CULTURE AND INNOVATION IN NIGERIAN QUANTITY SURVEYING FIRMS AN APPRAISAL OF THE IMPLEMENTATION OF THE KANO COMPREHENSIVE TOURISM MASTERPLAN, NIGERIA. AN APPRAISAL OF PERFORMANCE MEASUREMENT PRACTICE OF CONSTRUCTION FIRMS AN APPRAISAL OF THE PERFORMANCE OF STAKEHOLDERS MANAGEMENT IN CONSTRUCTION PROJECTS AN ASSESSMENT OF THE IMPLEMENTATION OF UNIVERSAL DESIGN PRINCIPLES IN THE PROVISION OF BUILDING SERVICES IN MULTI-STOREY BUILDINGS ASSOCIATION OF NIGERIAN AUTHORS' VILLAGE, KURRA FALLS. "ARCHITECTURE AS AN INSPIRATION FOR CREATIVE WRITING AN EVALUATION OF CONTRIBUTION OF COST CONTINGENCY TOWARDS SUCCESSFUL EXECUTION OF BUILDING PROJECTS IN NIGERIA AN APPRAISAL OF THE READINESS OF NIGERIAN BUILDING CONSULTING FIRMS TO ADOPT LEAN CONSTRUCTION PRINCIPLES CENTRE FOR PROFESSIONAL EXCELLENCE FOR THE NIGERIAN BUILDING INDUSTRY: DESIGN CONSIDERATIONS FOR PROFESSIONAL HARMONY AN APPRAISAL OF CONVERSION PROCESS OF BUILDINGSIN TERTIARY INSTITUTIONS 3-D READJUSTMENT OF PARTS OF THE NIGERIAN PRIMARY TRIANGULATION NETWORK WITH GNSS DATA CONTROL OF LABOUR COSTS IN BUILDINGS EVALUATING LESSONS LEARNED PRACTICES (LLPs) IN PUBLIC PRIVATE PARTNERSHIP (PPP) PROJECTS IN NIGERIA BUILD-OPERATE TRANSFER (BOT) FACTORING METHOD:A FINANCING SCHEME FOR CONSTRUCTION PROJECT AN ASSESSMENT OF THE NIGERIAN CONSTRUCTION INDUSTRY’S READINESS TO ADOPT VALUE MANAGEMENT PROCESS IN EFFECTIVE PROJECT DELIVERY KNOWLEDGE MANAGEMENT PRACTICE OF BUILDING CONSTRUCTION FIRMS AT PROJECT LEVEL AN EVALUATION OF THE ENVIRONMENTAL FACTORS THAT LEAD TO ABANDONMENT OF PUBLIC BUILDING PROJECTS ENHANCING PASSIVE COOLING IN HEALTHCARE BUILDINGS USING COURTYARD FORMS IN THE DESIGN OF WOMEN AND CHILDREN HOSPITAL IN KADUNA STATE, NIGERIA BUILDING FAILURES

click on whatsapp