Site Logo E-PROJECTTOPICS

ASSESSING THE EFFECTIVENESS OF PUBLIC PRIVATE PARTNERSHIP (PPP) PROCUREMENT MODEL FOR INFRASTRUCTURE DEVELOPMENT IN NIGERIA


📝


Presented To


Environmental Design Department

📄 Pages: 95       🧠 Words: 12321       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 70      

⬇️ Download (Complete Report) Now!

ABSTRACT
The study examined effectiveness of Public Private Partnership (PPP) procurement model in Nigeria, following the identification of the factors that measure the effectiveness of PPP procurement model in other countries from literature. A questionnaire survey approach was used to investigate the perception of Nigerian Construction Professionals (having some PPP experience) on their relative effectiveness. Means score values from the 114 survey respondents were used to rank the relative effectiveness and also determine the direction of movement on the PPP equilibrium framework. The independent T-test and Analysis of Variance (ANOVA) were used to test the differences in the Public Private respondent's perceptions as well as the various interest groups perceptions regarding the effectiveness of PPP procurement model in Nigeria. The results showed that the three most effective factors with regard to PPP procurement model were "established demand", "risk apportionment to proper party", and "user fees long-term management". While the least effective factors revealed by the study were "transparent and objective selection criteria", third party consultant involvement", acquisition and procurement addressed by legislation", Clear and objective conditions for renegotiation and positive environmental performance impact. These factors weakened the effectiveness of the PPP procurement model and cemented the location of the model on the equilibrium framework in the industry's interest quadrant. While the independent T-test and ANOVA test indicated significant difference in the perception of Public and Private Sector respondents as well as the various groups' perception response. Based on the findings from the study, it is recommended that stakeholders need to sensitize the populace on the relevance of venturing into PPP arrangement in infrastructure development especially at this time when government is financially handicapped as a result of competing demand coupled by scarce resources.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 95       🧠 Words: 12321       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 70      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

AN APPRAISAL OF THE CRITICAL SUCCESS FACTORS OF PROJECT PARTNERING TOWARDS ITS ADOPTION IN THE NIGERIAN CONSTRUCTION INDUSTRY HARNESSING PASSIVE COOLING STRATEGIES TO ENHANCE THERMAL COMFORT IN THE DESIGN OF PROPOSED SCHOOL OF ENVIRONMENTAL STUDIES ABDUGUSAU POLYTECHNIC ZAMFARA STATE, NIGERIA CRITICAL ASSESSMENT AND REDESIGN OF THE BRITISH AMERICAN TOBACCO POSTER DESIGNS IN NIGERIA AN EVALUATION OF THE ENVIRONMENTAL FACTORS THAT LEAD TO ABANDONMENT OF PUBLIC BUILDING PROJECTS 3-D READJUSTMENT OF PARTS OF THE NIGERIAN PRIMARY TRIANGULATION NETWORK WITH GNSS DATA THE SIGNIFICANCE, MEANINGS AND AESTHETIC VALUES OF SOME NIGERIAN ARMY BADGES ANALYSIS OF THE ENVIRONMENTAL SUSTAINABILITY OF TOURISM INFRASTRUCTURE DEVELOPMENT AT YANKARI GAME RESERVE ASSESSING THE FIRE SAFETY MEASURES IN THE DESIGN OF SHOPPING MALLS PATTERN AND URBAN MANAGEMENT CHALLENGES OF DEVELOPMENT CONTROL VIOLATIONS ASSESSMENT OF THE TRAINING NEEDS OF CRAFT SKILL WORKERS IN NORTH-WESTERN NIGERIA DEVELOPMENT OF WOOD FIRING KILN IN TERTIARY INSTITUTIONS IN NIGERIA PROTOTYPE DESIGN AND COSTRCTION OF A TWO-CHAMBER INTERMITTENT TANK FURNACE FOR SIMULTANEOUS DUAL STUDIO GLASS MELTING IN NIGERIA AN ASSESSMENT OF EXPATRIATE CONTRACTORS’ SITE MANAGEMENT PRACTICES IN THE NIGERIAN CONSTRUCTION INDUSTRY EVALUATING ENERGY EFFICIENCY IN THE DESIGN OF LARGE SCALE OFFICE BUILDING IN HOT-DRY CLIMATE OF NIGERIA AN ASSESSMENT OF ACCESS TO FINANCE FOR HOUSING DEVELOPMENT PUBLIC PARTICIPATION IN URBAN PHYSICAL DEVELOPMENT PROCESS LOCAL GOVERNMENT SECRETARIAT, SAMINAKA (EXPRESSION OF CULTURE ON THE ARCHITECTURE OF PUBLIC BUILDINGS IN KADUNA STATE) ANALYSIS OF THE RELATIONSHIP BETWEEN ORGANISATIONAL CULTURE AND INNOVATION IN NIGERIAN QUANTITY SURVEYING FIRMS RISK IDENTIFICATION AND ASSESSMENT IN HOUSING DEVELOPMENT PROJECTS USING ANALYTICAL HIERARCHICAL PROCESS PLAY SCULPTURE: FORM DEVELOPMENT DERIVED FROM AFRICAN FOLKLORE

click on whatsapp