Site Logo E-PROJECTTOPICS

ASSESSMENT OF THE INTEGRATION SCHEME IN ABUJA

(A CASE STUDY OF GARKI)


πŸ“


Presented To


Environmental Design Department

πŸ“„ Pages: 100       🧠 Words: 12404       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 408      

⬇️ Download (Complete Report) Now!

ABSTRACT
The thesis presents a review and assessment of integration - one the policies adopted for the resettlement of the populations affected by the new Federal Capital development project in Abuja, Nigeria. The other policies, tried before the introduction of integration are complete and partial resettlement with varying degrees of measures to evacuate the affected settlements to other locations within the Federal Capital Territory or outside. The policy of integrating some of the indigenous settlements into the fabric of new developments was conceived as an aftermath of the failure of the other policies especially due to high costs of compensation. More than ten years since its adoption in a pioneer scheme at Garki, the study has revealed that although the implementation of integration has avoided some of the problems of other policies, it has created others with equally serious consequences both on the people and the development of the new city. The policy, aimed at containing the original settlements rather than expelling them, has brought the indigenous populations face to face with new developments that have threatened their traditional ways of life and means of sustenance. Some of the consequences of integration as represented by the Garki project include the influx of migrants who through monetary enticements have dispossessed the people of land for housing. There is also shortage of land for farming. There are also effects on the way of life of the population itself - changes in employment and income, longer travel distances to farms, changes in the structure and form of the settlement etc. In addition, integration has not been implemented as initially conceived. Thus infrastructure and social facilities are not adequate, alternative spaces for housing are not appropriate and compensation, where applicable, too small. The study made recommendations on measures necessary to maintain and improve the use of the integration policy in Garki and other parts of Abuja.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

πŸ“„ Pages: 100       🧠 Words: 12404       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 408      

⬇️ Download (Complete Report) Now!

πŸ”— Related Topics

ASSESSMENT OF GRAPHIC DESIGN CURRICULAR OF NIGERIAN UNIVERSITIES IN RELATION TO DIGITAL CHALLENGES FACED BY FRESH GRADUATES IN THE PRINTING INDUSTRY AN ANALYSIS OF THE PLANNING AND IMPLEMENTATION OF THE "WATERFRONT SETTLEMENTS REDEVELOPMENT SCHEME" IN PORT HARCOURT MODELLING OF COST OVERRUNS IN BUILDING PROJECTS IN ABUJA AN ASSESSMENT OF TOURISM POTENTIALS ASSESSMENT OF THE COMPRESSIVE STRENGTH OF SOIL CEMENT BLOCK EXPOSED TO NPK FERTILIZER AN ASSESSMENT OF BIOCLIMATIC DESIGN PRINCIPLES IN OPTIMISING ENERGY EFFICIENCY IN DESIGN OF STATE CONVENTION CENTER TOWARDS ENHANCEMENT OF STUDENT’S INTERACTION THROUGH INTEGRATION OF FACILITIES BIOPHILIC DESIGN PATTERNS AS TOOLS FOR ENHANCING PATIENTS’ HEALING AND PSYCHOLOGICAL RECOVERY IN THE DESIGN OF NATIONAL CANCER HOSPITAL, ABUJA EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR FLOOR SCREED AND TILE FINISHES FOR CONSTRUCTION WORK IN ABUJA ORTHOPAEDIC SPECIALIST HOSPITAL, ABUJA (Internal Flexibility and External Extendability) AN ASSESSMENT OF PARTICIPATION IN OUTDOOR RECREATION ACTIVITIES IN YENAGOA TOWN ASSESSMENT OF THE IMPLEMENTATION OF THE CENTRAL AREA DEVELOPMENT PLAN OF THE FEDERAL CAPITAL CITY, ABUJA ASSESSMENT OF NIGERIAN NATIONAL CARNIVAL COSTUME AND ITS REBRANDING FOR GREATER APPRECIATION AN ASSESSMENT OF SAFETY RISK FACTORS DURING INSTALLATION AND DISMANTLING OF TOWER CRANES ON CONSTRUCTION SITES ASSESSMENT OF DETERMINANTS OF CONSTRUCTION TENDER SUM AN ASSESSMENT OF THE VISUAL COMMUNICATIONS APPROACH OF THE PUBLICATION UNIT OF AHMADU BELLO UNIVERSITY, ZARIA-NIGERIA PRODUCT LIFE CYCLE AND ENVIRONMENTAL IMPACT ASSESSMENT OF 7UP BOTTLE AN ASSESSMENT OF THE PROVISION OF INFRASTRUCTURE UNDER THE PUBLIC PRIVATE PARTNERSHIP HOUSING SCHEME IN ABUJA ASSESSMENT OF THE TRAINING NEEDS OF CRAFT SKILL WORKERS IN NORTH-WESTERN NIGERIA ASSESSMENT OF THE IMPLEMENTATION OF THE NEW MILLENIUM CITY MASTER PLAN, KADUNA

click on whatsapp