Site Logo E-PROJECTTOPICS

AN ASSESSMENT OF CONTRACTOR’S RISKS EXPOSURE WITHIN SOME STANDARD FORMS OF BUILDING CONTRACT IN NIGERIA


📝


Presented To


Environmental Design Department

📄 Pages: 99       🧠 Words: 10992       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 118      

⬇️ Download (Complete Report) Now!

ABSTRACT
Construction projects are subjected to several risks due to different activities involved. The activities are performed by several parties under different circumstances. Among the various stakeholders the Contractor has been identified to be the party that carries the highest number of risks. They are mostly exposed to contractual risks which occur as a function of contract provisions and clauses. This research work identified and assessed the risks which Contractors are exposed to within some Standard Forms of Contract in Nigeria. It further determined the likelihood of occurrence of the identified risks, impact on the risks on Contractors and the level of risks. Data were collected through questionnaires distributed to some Contractors around Abuja and analysed using qualitative risk analysis technique. The research identified 35 potential risk factors with 54% of the risks emanating from the Clients, 31% from the Architect, 6% from the Quantity Surveyor, 6% from the Project Managers and 3% from the government agents. It also found out that failures to write instructions regarding variations and documents which are not issued on time are the major potential risk factors with high likelihood of occurrence while the other risk factors have moderate likelihood of occurrence. Thirteen (13) potential risk factors were found to have high impact on Contractors and fifteen (15) are high degree of risk. It concluded that Contractors must understand the nature of risks, their source and the extent of exposure so as to pay attention to dealing with such risks in present and future projects. The study therefore recommended that Contractor should pay attention to risks with high likelihood of occurrence so as to reduce their impact, should protect themselves against risks by contingency, warn parties of potential delays and its implications, negotiate construction schedule with client and allow for buffer time, the contractor should ensure working with carefully prepared and coordinated drawings, establish clear line of communications for receiving and responding to instructions and collaborative effort from all the participants of the project.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 99       🧠 Words: 10992       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 118      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

A STUDY OF SELECTED ARTISTS FROM FINE ARTS DEPARTMENT AHMADU BELLO UNIVERSITY ZARIA AND THEIR CONTRIBUTIONS TO THE DEVELOPMENT OF CONTEMPORARY ART IN NIGERIA (1981-2002) DEVELOPMENT OF A PROTOTYPE ELECTRONIC DOCUMENT AND RECORD MANAGEMENT SYSTEM (EDRMS) FOR SMALL AND MEDIUM BUILDING FIRMS ASSESSMENT OF MOTIVATION OF NON-CONSTRUCTION PROFESSIONALS IN CONSTRUCTION COMPANIES EFFECTS OF SUGAR AS RETARDER ON THE PROPERTIES OF CONCRETES MADE WITH SELECTED BRANDS OF PORTLAND CEMENT IN NIGERIA SITE COST CONTROL MODEL FOR MEDIUM SIZED BUILDING PROJECT AN ASSESSMENT OF THE INFLUENCE OF COMBUSTION GENERATED POLLUTANTS ON THE INDOOR AIR QUALITY OF SELECTED LABORATORIES AN APPRAISAL OF THE IMPLEMENTATION OF THE KANO COMPREHENSIVE TOURISM MASTERPLAN, NIGERIA. MAPPING AND ANALYSIS OF SITES FOR GRAZING RESERVES IN SOME STATES OF NORTHERN NIGERIA AN ANALYSIS OF GRAPHIC DESIGN PROBLEMS FOUND IN SOME BILLBOARD ADVERTISEMENT IN NIGERIA AN EVALUATION OF SOME SUSTAINABLE RURAL DEVELOPMENT COMPONENTS IN THE DESIGN OF THE HADEJA-NGURU WETLANDS CONSERVATION PROGRAMME AN ASSESSMENT OF SHARED LEADERSHIP AND TEAM PERFORMANCE IN CONSTRUCTION PROJECTS GEOSPATIAL ANALYSIS OF QUARRY ACTIVITIES IN MPAPE DISTRICT, ABUJA NIGERIA TOTAL ELECTRON CONTENT ESTIMATION AND ANALYSIS OVER THE NIGERIAN GLOBAL NAVIGATION SATELLITE SYSTEM PERMANENT REFERENCE NETWORK AN ASSESSMENT OF THE SUITABILITY OF IBETO CLAY IN NIGER STATE FOR THE PRODUCTION OF TABLEWARE METAPHORICAL RENDITION OF CASSIA TORA ROOT FORMS IN PAINTING Assessment of the Impact of Contraventions of Building Regulations on the Architecture of Mixed Landuse Areas of Kano Metropolis ASSESSMENT OF THE IMPLEMENTATION OF ABUJA TOURISM DEVELOPMENT MASTER PLAN (2000 – 2010) ASSESSING THE CAPABILITIES OF CONTRACTORS IN MONITORING AND CONTROLLING CONSTRUCTION CASH FLOW IN NIGERIA COST IMPLICATIONS OF VARIATIONS IN CONSTRUCTION PROJECTS IN NIGERIA COMPARATIVE ANALYSES OF WURNO, DANGE AND WEPPA GYPSUMS IN NIGERIA FOR PLASTER AND CERAMIC PRODUCTION

click on whatsapp