Site Logo E-PROJECTTOPICS

ASSESSMENT OF MEDICAL WASTE MANAGEMENT PRACTICES

(A CASE STUDY OF AHMADU BELLO UNIVERSITY TEACHING HOSPITAL AND AHMADU BELLO UNIVERSITY HEALTH SERVICES, ZARIA, NIGERIA)


πŸ“


Presented To


Environmental Design Department

πŸ“„ Pages: 100       🧠 Words: 6904       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 104      

⬇️ Download (Complete Report) Now!

ABSTRACT
Healthcare services are aimed at improving wellbeing and preventing potential human health risks and environmental hazards. In the process, however, wastes that are potentially harmful are generated. Poor management of these healthcare wastes (HCW) exposes the health workers, patients, waste handlers and the general public to health risks. Thus, this study focussed on the assessment of HCW management practices at Ahmadu Bello University Teaching Hospital (ABUTH) Zaria and Ahmadu Bello University Health Service (ABUHS) A.B.U. Zaria. The study utilised two sets of questionnaire to capture HCW management practices including collection, segregation, storage, disposal and treatment. One of the set of questionnaire was administered to all the waste handlers while the second set of questionnaire was administered to all the heads of waste management units in each of the hospitals. While the former was used for identifying the HCW management practices in the two hospitals, the latter was used for assessing the effectiveness of HCW management practices in the hospitals in accordance with Townend and Cheeseman (2005) guidelines. The study established the total quantities of HCW generated at ABUTH and ABUHS as 845kg and 77kg per day respectively; which translates to 1.18kg and 1.54kg per day per bed at ABUTH and ABUHS respectively. The study revealed availability of operational staff specifically responsible for medical waste management and personal protective equipment for use by medical waste handlers in both ABUTH and ABUHS. The study further revealed availability of receptacles, storage containers, dumpsites and separation of collection of sharps or infectious materials at both ABUTH and ABUHS. The study, however, also established absence of colour coding, central purpose-built storage facility, recycling on healthcare waste management in both ABUTH and ABUHS. It was concluded that both the ABUTH and ABUHS are classified as Level 2 hospitals based on their operational performance in accordance with the Townend and Cheeseman (2005) guidelines, which implies that some aspects are considered sustainable while some other aspects considered unsustainable. The study recommended more sustainable practices in the management of HCW. Given the importance of effective healthcare waste management practices and the current unsustainable level of performance, the study recommended further study on the effects of the healthcare wastes from the two hospitals on the environment (soil, water and air). Williams.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

πŸ“„ Pages: 100       🧠 Words: 6904       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 104      

⬇️ Download (Complete Report) Now!

πŸ”— Related Topics

ASSESSMENT OF BARRIERS TO COMMUNICATION IN THE NIGERIAN CONSTRUCTION INDUSTRY DEVELOPING A PROACTIVE COST MANAGEMENT MODEL FOR BUILDING PROJECTS IN NIGERIA ASSESSMENT OF COMMUNITY PARTICIPATION IN THE KARU URBAN UPGRADING PROJECT ANALYSIS OF THE PATTERN AND URBAN MANAGEMENT IMPLICATIONS OF SPRAWL ASSESSMENT OF SUITABILITY OF QUANTITY SURVEYORS IN THE PROVISION OF CONTRACT AUDITING SERVICES IN NORTH-WEST GEO-POLITICAL ZONE OF NIGERIA AN APPRAISAL OF THE DEVELOPMENT AND MANAGEMENT OF ORGANISED OPEN SPACES IN KADUNA METROPOLIS AN ASSESSMENT OF THE NIGERIAN CONSTRUCTION INDUSTRY’S READINESS TO ADOPT VALUE MANAGEMENT PROCESS IN EFFECTIVE PROJECT DELIVERY A STUDY OF TEACHERS' ASSESSMENT OF CHILDREN'S CREATIVE ART WORKS IN SOME PRIMARY SCHOOLS URBAN MANAGEMENT IMPLICATIONS OF ALMAJIRI SCHOOLS ENERGY MANAGEMENT SCHEME FOR A UNIVERSITY CAMPUS AN ASSESSMENT OF THE PARTICIPATORY ATTRIBUTES OF CONSTRUCTION PROFESSIONALS FOR EFFECTIVE VALUE MANAGEMENT AN ASSESSMENT OF JOS PLATEAU VOLCANIC DEPOSITS AS POZZOLANS AND ITS EFFECT ON BLENDED ORDINARY PORTLAND CEMENT CONCRETE APPRAISAL OF ABUJA METROPOLITANT MANAGEMENT COUNCIL (AMMC) STRUCTURE AND PROCESS AN ASSESSMENT OF JOS PLATEAU VOLCANIC DEPOSITS AS POZZOLANS AND ITS EFFECT ON BLENDED ORDINARY PORTLAND CEMENT CONCRETE ANALYSIS OF POVERTY IN ZARIA URBAN AREA AND THE URBAN MANAGEMENT IMPLICATIONS ANALYSIS OF DOMESTIC SOLID WASTE MANAGEMENT STRATEGIES ASSESSING THE INFLUENCE OF KNOWLEDGE MANAGEMENT ENABLERS ON ORGANISATIONAL PERFORMANCE OF CONSTRUCTION CONSULTANCY FIRMS URBAN MANAGEMENT CHALLENGES FOR WATER SUPPLY IN PERIPHERAL SETTLEMENTS ASSESSMENT OF GRAPHIC DESIGN CURRICULAR OF NIGERIAN UNIVERSITIES IN RELATION TO DIGITAL CHALLENGES FACED BY FRESH GRADUATES IN THE PRINTING INDUSTRY EVALUATING MATERIAL APPLICATION WASTE ON BUILDING CONSTRUCTION SITES

click on whatsapp