Site Logo E-PROJECTTOPICS

ECONOMIC VIABILITY OF A SMALL HYDROPOWER PLANT AT ONUAKU RIVER, ABIA STATE NIGERIA


📝


Presented To


Engineering Department

📄 Pages: 93       🧠 Words: 11850       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 443      

⬇️ Download (Complete Report) Now!

ABSTRACT
In this study the financial and economic feasibility of OnuakuRiver in Aku community of Abia state was evaluated using indicators like the Net Present value (NPV), Payback Period, Benefit cost ratio (BCR) and Internal Rate of Return (IRR) to ascertain the feasibility and viability of the project. Here the breakeven point of the project, profit, cash flow, present and future value of project as well as the expected yearly revenue of the project is shown in advance within the economic life or span of the project. Furthermore a sensitivity analysis to show the responds of the project to both variation in investment cost and the price of electricity, was also carried out using a Microsoft excel based platform to carry out the computations.With an investment cost of less than N12million, a net present value of three million six hundred and thirty thousand, fifty seven naira fifty eight kobo,(N3,630,057.58) was gotten at the 30 years life span of the project with an internal rate of return of 14.25%. Also from the analysis a project payback period of ten years which is timely enough for the client or investor to recover the investment made on a project that can span up to thirty years (minimum) - fifty years (maximum). The benefit cost ratio of the project from analysis is 1.23 which is above unity. Furthermore, sensitivity of the project to variations in investment cost showed that the project is sensitive to variation in the investment cost, as a 30% increase in investment cost throws the project into a negative NPV, and an IRR less than the hurdle rate of 12%. The sensitivity to the variation in the price of electricity shows how the project responds to reduction in electricity price, as a reduction by 20% in electricity price, throws the project into a negative net present value making the project not viable at 20% reduction in electricity price. Hence the results from the analysis above have provided additional information for the decision makers, client and the design engineer to see reasons why this project should be embarked on.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 93       🧠 Words: 11850       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 443      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

QUALITY OF SANDCRETE HOLLOW BLOCKS PRODUCED IN BENUE STATE COST EVALUATION OF ROAD TRAFFIC ACCIDENT IN NIGERIA USING HUMAN CAPITAL APPROACH STATE-SPACE DESIGN AND CONSTRUCTION OF A MAGNETIC SUSPENSION SYSTEM POLLUTION AND SELF PURIFICATION STUDIES OF RIVER ROMI, CHIKUN LOCAL GOVERNMENT AREA KADUNA STATE DEVELOPMENT OF A SENSITIVITY INDEX BASED TECHNIQUE FOR UNIFIED POWER FLOW CONTROLLER PLACEMENT WITH CONTINGENCY ANALYSIS ON NIGERIA 330kV TRANSMISSION NETWORK DEVELOPMENT AND PERFORMANCE EVALUATION OF A FOUR ROW ANIMAL DRAWN MAIZE SEED PRECISION PLANTER SOCIO-ECONOMIC BENEFITS OF IRRIGATION USING BORROW PIT WATER DEVELOPMENT OF A STATE ESTIMATION BASED IMPROVED DETECTION AND LOCALIZATION OF NON-TECHNICAL LOSSES USING SMART METER MEASUREMENTS DEVELOPMENT OF AN IMPROVED ERGODIC CAPACITY OF UNDERLAY COGNITIVE RADIO WITH IMPERFECT CHANNEL STATE INFORMATION SELECTED PHYSICAL AND MECHANICAL PROPERTIES OF COWPEA AS RELATED TO MECHANICAL THRESHING OF THE ENTIRE PLANT SHOOT IRRIGATION WATER FROM SMALL SCALE EXCAVATIONS IN A DRY RIVER BED CHARACTERISATION OF SOME NIGERIAN COALS FOR POWER GENERATION EVALUATION OF THE FACTORS AFFECTING THE SELF-PURIFICATION CAPACITY OF RIVER KADUNA, NIGERIA FAILURE EVALUATION OF ENGINEERING PROJECTS IN NIGERIA EVALUATION OF LEVELISED COST OF ELECTRICITY GENERATED FROM HOT SPRING GEOTHERMAL RESOURCES IN NIGERIA DEVELOPMENT OF A SELF-PROPELLED BOOM SPRAYER FOR SMALL AND MEDIUM SCALE HERBICIDE APPLICATION Development of EN 338(2003) Strength Classes of Doka (Isoberlinia doka), Madaci (Khaya senegalensis) Gawo (Acacia albida) and Rimi (Ceiba pentandra) Timber Species of Nigerian Origin UPGRADING OF WASAGU (KEBBI STATE) MANGANESE ORE TO METALLURGICAL GRADE CONCENTRATE SOME HEAVY METALS IN PLANTS IRRIGATED WITH SEWAGE EFFLUENTS MULTIVARIATE STATISTICAL ANALYSIS OF POLLUTION CHARACTERISTICS IN RIVERS OF THE MIDDLE GALMA BASIN, NIGERIA

click on whatsapp