Site Logo E-PROJECTTOPICS

ASSESSMENT OF THE HYDROPOWER POTENTIAL OF GORONYO DAM IN SOKOTO STATE, NIGERIA


📝


Presented To


Engineering Department

📄 Pages: 96       🧠 Words: 6710       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 225      

⬇️ Download (Complete Report) Now!

ABSTRACT
Energy is one commodity on which provision of goods and services depend. Its availability and consumption rate is an economic index to measure the development of any community. Nigeria has limitation to power supply from the National grid which has adverse effect on the populace?s economic and social development. This necessitates the need for other sources of viable alternative to which hydropower schemes is the best and sustainable. Goronyo Dam was built across River Rima in 1984 and was commissioned in 1992 in Sokoto State of Nigeria. It has a storage capacity 942,000000 m3and a catchment of 21,445 km2. The aim of this research to investigate and assess the hydropower potential of Goronyo Dam using Rainfall Data from 1986 - 2015.The research was carried out using HEC - HMS (Hydrological Engineering Centre - Hydrologic Modeling System) Software designed U.S Army Corps of Engineers, Sequent - Method or Analytical Method. The HEC-HMS was used for analyzing rainfall Data. The parameters (evaporation, direct rainfall, inflow etc.) needed for computing the required storage capacity were calculated separately using appropriate equations. The sediment volume of the Reservoir was also determined. This study revealed that the volume of sediments in the Reservoir was 26,179,302m3and has lost storage capacity at about its dead storage (21,500,000m3) with an excess of 4,679,302m3.The discharge required for estimating hydropower potential of Goronyo Reservoir was computed as 268m3/s.The head of the Reservoir was 9.5 m.It was also found that the Reservoir isexperiencing seepage mostly during periods of high flow at some areas with annual discharge of146, 684.81L/yr. The water collected from the relief wells was clean indicating the absence of piping through the dam embankment. The peak discharge (18624m3/s) of the dam was used for calculating the peak power as 1735.667 MW for hydro power and 1388.531MW for hydroelectric power while the discharge (268m3/s) gotten from water balance analysis was used for calculating the theoretical power and actual power of the Dam. The theoretical power of the dam was calculated as 25MW while the actual power was calculated as 20MW. With generation capacity of 20 MW, reveals that Goronyo Reservoir has the hydropower potential for hydroelectric power generation and by classification of hydropower Goronyo dam belong to the medium hydropower scheme. In order to maintain the design live span of the Dam, there is need for rehabilitation and dredging

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 96       🧠 Words: 6710       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 225      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

ASSESSMENT OF MUNICIPAL SOLID WASTE IMPACT ON GROUNDWATER QUALITY OF SOME SELECTED AREAS EVALUATION OF THREE NIGERIAN FIBRE SOURCES FOR PULP AND PAPER PRODUCTION ASSESSMENT OF THE IMPACT IMPACT OF CLIMATE CHANGE ON WATER RESOURCES AVAILABILITY IN THE SOKOTO-RIMA RIVER BASIN DESIGN,CONSTRUCTION AND EXPERIMENTAL EVALUATION OFTHEPRODUCTSOF A LOW COST BRIQUETTE MACHINE FOR RURAL COMMUNITIES IN NIGERIA FAILURE EVALUATION OF ENGINEERING PROJECTS IN NIGERIA LIGHTLY LOADED FOUNDATION FAILURES AT SOKOTO - INVESTIGATIONS AND SOLUTIONS THE STRUCTURE, PETROLOGY AND GEOCHEMISTRY OF THE TIBCHI YOUNGER GRANITE RING-COMPLEX, NIGERIA DEVELOPMENT OF AN IMPROVED SHORT-TERM PEAK LOAD FORECASTING MODEL BASED ON SEASONAL AUTOREGRESSIVE INTEGRATED MOVING AVERAGE AND NONLINEAR AUTOREGRESSIVE NEURAL NETWORK FOR NIGERIA POWER SYSTEM GRID POTENTIALS OF USING SOME VEGETABLE OILS AS QUENCHANTS FOR AUSTEMPERING OF STEELS AND CAST IRONS Computer Simulation of the Telephone System in the Northern States of Nigeria A STOCHASTIC LINEAR PROGRAMMING APPROACH FOR THE PRODUCTION, DISTRIBUTION AND INVENTORY SYSTEMS OF THE NIGERIAN BOTTLING COMPANY (NBC) EVALUATION OF PITCHER IRRIGATION TECHNOLOGY FOR THE PRODUCTION OF LETTUCE (Lactuca sativa) CROP IN SAMARU, NIGERIA ECONOMIC ANALYSIS OF ARTISANAL FISH MARKETING IN KEBBI STATE OF NIGERIA ANALYSIS AND QUANTIFICATION OF DROUGHT USING METEOROLOGICAL INDICES IN THE SUDANO-SAHEL REGION OF NIGERIA DESIGN AND FABRICATION OF AIR SAMPLER IN AIR QUALITY ASSESSMENT FOR SELECTED HEAVY METALS EFFECT OF CALCINATION TEMPERATURE ON THE COMPOSITION AND PHOTOCATALYTIC ACTIVITY OF NIGERIAN NATURAL ILMENITE, SPHALERITE AND WOLFRAMITE OPTIMUM IRRIGATION SCHEDULES FOR TOMATO PRODUCTION UNDER FADAMA CONDITIONS IN THE GUINEA SAVANNAH REGION OF NIGERIA STOCHASTIC ASSESSMENT OF NIGERIAN TIMBERS FOR BRIDGE DECKS IN ACCORDANCE TO AASHTO LFRD ASSESSMENT OF THE PERFORMANCE OF WATER SUPPLY SERVICE IN KADUNA NORTH WATER WORKS ESTIMATION OF WATER EROSION OF A NIGERIAN GUINEA SAVANNA SOIL

click on whatsapp