Site Logo E-PROJECTTOPICS

ANALYSIS OF LAND USE MANAGEMENT ACTIVITIES

(A CASE STUDY OF GWAGWALADA)


📝


Presented To


Environmental Design Department

📄 Pages: 84       🧠 Words: 12242       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 101      

⬇️ Download (Complete Report) Now!

ABSTRACT
The previous studies on land use are concerned with features of development control, Land administration land and use planning each treated separately. That is by aspects of planning control, land allocation process and development control have not been covered together as components of land use management .Therefore, this study was set out to address the components of land use management together which are planning Control, Land administration and Development Control in Gwagwalada .In view of the above, The research was conducted through the information gathered from interviews of the respondents, field survey and the data was analyzed with the use of tables, figures, plates as well as descriptive analyses. The findings are poor land use management in Gwagwalada, that is, the allocation process lacks transparency, inadequate planning activities resulting into poor control development, inadequate staff, inefficient land administration resulting in land speculations and loss of revenue and also weak development controls leading to inappropriate development. The recommendations were made in three areas which are :The Gwagwadada master plan be review , revocation of all those areas allocated that are not in line with land use proposal with due consultations and relocate them to another place, The development control department should increase their awareness to enlightening the public, increase monitoring for development control activities and also increase the enforcement to avoid violation of land use. Finally the land use management use frame work be separated to allow checks and balances within the component of land use management.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 84       🧠 Words: 12242       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 101      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

ASSESSMENT OF THE ACTIVITIES OF ABUJA GEOGRAPHIC INFORMATION SYSTEM (AGIS) ANALYSIS OF DOMESTIC SOLID WASTE MANAGEMENT STRATEGIES AN ASSESSMENT OF THE PARTICIPATORY ATTRIBUTES OF CONSTRUCTION PROFESSIONALS FOR EFFECTIVE VALUE MANAGEMENT AN APPRAISAL OF THE PERFORMANCE OF STAKEHOLDERS MANAGEMENT IN CONSTRUCTION PROJECTS THEOLOGICAL SEMINARY ILORIN AN ANALYTICAL STUDY OF INTRODUCING MANAGEMENT EDUCATION INTO THEOLOGY KNOWLEDGE MANAGEMENT PRACTICE OF BUILDING CONSTRUCTION FIRMS AT PROJECT LEVEL AN EVALUATION OF DECORATED TRADITIONAL CLOTH USED IN TIV CULTURAL ACTIVITIES ANALYSIS OF WOMEN'S PARTICIPATION AND INCORPORATION IN WASTE PICKING AND SOLID WASTE MANAGEMENT IN SOKOTO METROPOLIS DESIGN AND PERFORMANCE ANALYSIS OF OUTER JACKET ALLIHN AND GRAHAM GLASS CONDENSERS (2018-10) JEKADA, JULIUS ZACHARIAH URBAN MANAGEMENT IMPLICATIONS OF PERI URBAN GROWTH ANALYSIS OF MAINTENANCE EXPENDITURE FOR FINANCIAL PLANNING MAPPING AND ANALYSIS OF SITES FOR GRAZING RESERVES IN SOME STATES OF NORTHERN NIGERIA MANAGING LAND USE PLANNING URBAN MANAGEMENT IMPLICATIONS OF ALMAJIRI SCHOOLS A CONTEXTUAL ANALYSIS OF MUYIDEEN ADIO JAJI'S STUNTED SCULPTURES MODELLING THE INTER-RELATIONSHIPS AMONGST ELEMENTS OF SUSTAINABILITY STRATEGIES FOR SUSTAINABLE MANAGEMENT OF CONSTRUCTION PROJECTS FINANCING URBAN INFRASTRUCTURE DEVELOPMENT PROJECTS : AN ANALYSIS OF THE STRATEGIES USED IN KADUNA DEVELOPMENT OF A PROTOTYPE ELECTRONIC DOCUMENT AND RECORD MANAGEMENT SYSTEM (EDRMS) FOR SMALL AND MEDIUM BUILDING FIRMS ASSESSMENT OF HOUSEHOLD SOLID WASTE MANAGEMENT ASSESSMENT OF MEDICAL WASTE MANAGEMENT PRACTICES

click on whatsapp