Site Logo E-PROJECTTOPICS

REDEVELOPMENT OF SOKOTO AIRPORT TERMINAL BUILDING


πŸ“


Presented To


Environmental Design Department

πŸ“„ Pages: 83       🧠 Words: 10167       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 321      

⬇️ Download (Complete Report) Now!

ABSTRACT
The problem of very high wind velocity is not new to Sokoto and its environment. Windstorm had been a seasonal affair, and has become a very serious regional hazard . Despite the seriousness of this phenomenon, the authorities concerned have done nothing to see that this pehnomenon is thoroughly investigated, and appropriate solutions found to prevent future occurance. The Sokoto International Airport Terminal Building is one of the victims of this neglect. The otherwise beautiful terminal was reduced to debris after a devastating windstorm in May, 1984. A few months after it was commissioned. The roof, a steel space frame structure was uplifted from the windward side by the storm and thrown backwards breakung some columns on the lee-ward side as it went, causing some serious structural damage to the building itself. It is the intention of this thesis, therefore, to findout why the Sokoto Airport Terminal building have been an architectural failure due to lack of consideration for the wind effects in this region. It is hoped that by end of our investigations, greater insight into this inconspicuous and invisible, yet powerful phenomenon - the wind will be gained. And solution not only to the Terninal building, but other buildings in general will be provided. Bearing in mind our present economic predicaments, and need to maintain other existing infrastructure like the runway, parking area, access roads and the control tower. An attempt will be made to produce a new Terminal Building, that is functional, practical and financially feasible. And ofcourse extensive use of locally available materials.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

πŸ“„ Pages: 83       🧠 Words: 10167       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 321      

⬇️ Download (Complete Report) Now!

πŸ”— Related Topics

CONTROL OF LABOUR COSTS IN BUILDINGS EVALUATING MATERIAL APPLICATION WASTE ON BUILDING CONSTRUCTION SITES DEVELOPING A PROACTIVE COST MANAGEMENT MODEL FOR BUILDING PROJECTS IN NIGERIA INFLUENCE OF CLIENT ORGANISATION ON ACHIEVING VALUE IN BUILDING DESIGNS AN EVALUATION OF ENERGY CONSUMPTION AND CONSERVATION OPPORTUNITIES FOR BUILDINGS AT NATIONAL RESEARCH INSTITUTE FOR CHEMICAL TECHNOLOGY ZARIA A REDEVELOPMENT PROPOSAL FOR VOM GENERAL HOSPITAL EVALUATING PASSIVE COOLING STRATEGIES FOR ENERGY EFFICIENCY IN THE DESIGN OF SENATE BUILDING FOR FEDERAL UNIVERSITY KASHERE, GOMBE STATE MODELING DURATION OF BUILDING RENOVATION PROJECTS AN ANALYSIS OF THE PLANNING AND IMPLEMENTATION OF THE "WATERFRONT SETTLEMENTS REDEVELOPMENT SCHEME" IN PORT HARCOURT KNOWLEDGE MANAGEMENT PRACTICE OF BUILDING CONSTRUCTION FIRMS AT PROJECT LEVEL ARCHITECTURAL RESPONSE TO EFFECTS OF WIND ON HIGH RISE BUILDING FORMS IN THE DESIGN OF MIXED-USE AT EKO ATLANTIC CITY LAGOS EVALUATION OF PROJECT RISK AND THE DETERMINATION OF CONTINGENCY SUM FOR BUILDING DEVELOPMENTS IN NIGERIA AN EVALUATION OF DISASTER PREPAREDNESS IN INDUSTRIAL BUILDINGS REDEVELOPMENT OF LUGARD HALL, KADUNA: PRESERVING THE LEGACY OF COLONIAL ARCHITECTURE IN NORTHERN NIGERIA SITE COST CONTROL MODEL FOR MEDIUM SIZED BUILDING PROJECT MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA RIVER PORT TERMINAL FOR BARO (Integrating Forms and Spaces with the Immediate Port Environment) A REDEVELOPMENT PROPOSAL FOR THE ATTAH IGALA’S PALACE IDAH, KOGI STATE: AN ATTEMPT AT DOCUMENTING IGALA TRADITIONAL ARCHITECTURE AN APPRAISAL OF CONVERSION PROCESS OF BUILDINGSIN TERTIARY INSTITUTIONS ESTIMATES AS A TOOL FOR BUILDING PROJECT COST CONTROL

click on whatsapp