Site Logo E-PROJECTTOPICS

PARTNERSHIP FRAME-WORK FOR THE PROVISION AND MANAGEMENT OF URBAN INFRASTRUCTURE IN ABUJA CITY


πŸ“


Presented To


Environmental Design Department

πŸ“„ Pages: 94       🧠 Words: 12836       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 235      

⬇️ Download (Complete Report) Now!

ABSTRACT
This research work is on the widely accepted strategy, that is, the participatory framework to planning and development. The approach is not new in the world. However, community participation has only been either at the concept level or on a micro-scale and formalised. But the new approach is on macro level and has been made formal and involves local participants ,national and international involvement that are involved in a structured manner in relation to their resources and based on their priorities as stake holders. The approach has proved effective and yielded positive results in terms of maximization of resources, coordination of activities, spread of equal responsibilities and opportunities and seeing the value of their creativeness. It is due to this reasons that motivated us to adopt the strategy to be able to hasten the physical development of Abuja and provide infrastructure in a sustainable manner In the study, it has been seen and analysed that FCDA or Government carries all the financial burden in terms of provision of all the components of physical infrastructure in Abuja. Also the elements and shortcomings of the various public sector providers of infrastructure have been identified. Similarly, stake holders within Abuja that are responsible for infrastructure provision have been identified, and their financial base analysed. Finally, policy recommendations have been made within the participatory framework for sustainable provision and management of infrastructure in Abuja city.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

πŸ“„ Pages: 94       🧠 Words: 12836       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 235      

⬇️ Download (Complete Report) Now!

πŸ”— Related Topics

PUBLIC PARTICIPATION IN URBAN PHYSICAL DEVELOPMENT PROCESS EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR FLOOR SCREED AND TILE FINISHES FOR CONSTRUCTION WORK IN ABUJA PASSIVE SOLUTIONS TO INCREASE ENERGY EFFICIENCY In the Design of a Shopping Mall Abuja, Federal Capital Territory AN APPRAISAL OF COST-BASED INFORMATION MANAGEMENT METHODS AT THE DESIGN STAGE OF BUILDING PROJECTS IN NIGERIA RECONSTRUCTION OF CENTRAL MARKET, JOS; Exploring Architectural Determinants to Urban Renewal GLASS RECYCLING IN WASTE MANAGEMENT AN APPRAISAL OF SOFT SKILLS REQUIRED FOR SUCCESSFUL PROJECT MANAGEMENT OF CONSTRUCTION PROJECTS RECREATION AND SHOPPING COMPLEX, ABUJA ARCHITECTURAL RESPONSE TO URBAN RECREATIONAL NEEDS APPRAISAL OF STAKEHOLDER MANAGEMENT PRACTICE IN TERTIARY EDUCATION TRUST FUND (TETFUND) CONSTRUCTION PROJECTS ANALYSIS OF THE DETERMINANTS OF PARTICIPATION OF STAKEHOLDERS IN SOLID WASTE MANAGEMENT IMPLEMENTING THE 1992 URBAN AND REGIONAL PLANNING LAW PLANNING FOR SHOPPING ACTIVITIES IN URBAN RESIDENTIAL AREAS BIOPHILIC DESIGN PATTERNS AS TOOLS FOR ENHANCING PATIENTS’ HEALING AND PSYCHOLOGICAL RECOVERY IN THE DESIGN OF NATIONAL CANCER HOSPITAL, ABUJA DEVELOPMENT OF A PROTOTYPE ELECTRONIC DOCUMENT AND RECORD MANAGEMENT SYSTEM (EDRMS) FOR SMALL AND MEDIUM BUILDING FIRMS MODELLING THE INTER-RELATIONSHIPS AMONGST ELEMENTS OF SUSTAINABILITY STRATEGIES FOR SUSTAINABLE MANAGEMENT OF CONSTRUCTION PROJECTS ARCHITECTURAL RESPONSE TO EMERGENCY CARE IN THE DESIGN OF ABUJA GENERAL HOSPITAL PLANNING FOR THE PROVISION OF PARKING FACILITIES IN THE CENTRAL BUSINESS DISTRICT OF KANO SUSTAINABLE WASTE MANAGEMENT SYSTEM IN ABATTOIR DESIGN AN ASSESSMENT OF THE PARTICIPATORY ATTRIBUTES OF CONSTRUCTION PROFESSIONALS FOR EFFECTIVE VALUE MANAGEMENT MUNICIPAL SOLID WASTE MANAGEMENT TECHNIQUES

click on whatsapp