Site Logo E-PROJECTTOPICS

TENDER MANAGEMENT AND BID EVALUATION FOR OPTIMUM RESULTS


πŸ“


Presented To


Environmental Design Department

πŸ“„ Pages: 99       🧠 Words: 11245       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 147      

⬇️ Download (Complete Report) Now!

ABSTRACT
This thesis takes premise that tender management and bid evaluation are solid foundations to proper project execution. The study therefore sets to look into how tender management and bid evaluation process will assist in successful project execution. In order to achieve this aim the present systems of tender management and bid evaluation were investigated. Two organisations were investigated with a view to finding out how tenders are managed and bids evaluated. Questionnaires were distributed to contractors registered with Niger State and Ahmadu Bello University, Zaria. This study has revealed that Tenders Boards where only a few professionals are represented run the risk of over relying on the technical opinion of the consultants. Furthermore, much of the tasks of the board are delegated to ill-equiped personnel who do not appreciate the implications of their decisions with respect to construction matters. The degree of information flow at tender stages was also found to be inadequate. Therefore, to improve the efficiency of tender management and bid evaluation it has been suggested that the composition of Tenders Boards be made up of a good number of professionals in the building industry. Also a new method of bid evaluation employing the use of contractors average, which hopefully will overcome some of the shortcomings of the present system, has been proposed.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

πŸ“„ Pages: 99       🧠 Words: 11245       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 147      

⬇️ Download (Complete Report) Now!

πŸ”— Related Topics

EVALUATION OF THE RELATIONSHIP BETWEEN DELAYED PAYMENTS AND COST AND TIME OVERRUNS ASSESSMENT OF HOUSEHOLD SOLID WASTE MANAGEMENT ANALYSIS OF THE PATTERN AND URBAN MANAGEMENT IMPLICATIONS OF SPRAWL ASSESSMENT OF THE COMMERCIALIZATION PROGRAMME OF SOLID WASTE MANAGEMENT EVALUATION OF COST RECOVERY FOR WATER SUPPLY IN MAKURDI EVALUATION OF THE EXISTING MINNA MASTER PLAN TO DETERMINE ITS ADEQUACY WITH REGARD TO OFFICE AND RESIDENTIAL LAND ALLOCATION PERFORMANCE EVALUATION OF THE IMPLEMENTATION OF THE FEDERAL GOVERNMENT SITES AND SERVICES PROGRAMME IN NIGERIA AN EVALUATION OF HOUSING AFFORDABILITY FOR NIGER STATE CIVIL SERVANTS UNDER PUBLIC-PRIVATE PARTNERSHIP (PPP) HOUSING DEVELOPMENT APPRAISAL OF STAKEHOLDER MANAGEMENT PRACTICE IN TERTIARY EDUCATION TRUST FUND (TETFUND) CONSTRUCTION PROJECTS AN EVALUATION OF THE SPATIAL PLANNING INPUT IN THE NINGI DEVELOPMENT AREA OF THE BAUCHI STATE INTEGRATED RURAL DEVELOPMENT PROGRAMME (BASIRDP) AN APPRAISAL OF FACTORS MILITATING AGAINST THE EFFECTIVE IMPLEMENTATION OF FORMAL RISK MANAGEMENT TECHNIQUES IN PROJECT DELIVERY ENERGY MANAGEMENT SCHEME FOR A UNIVERSITY CAMPUS A POST OCCUPANCY EVALUATION OFPATIENTS' SATISFACTION WITH NIGER STATE GOVERNMENT HOSPITAL BUILDINGS RELIABILITY OF THE ENGINEERS ESTIMATE IN SELECTIVE TENDERING FOR BUILDING WORKS AN ASSESSMENT OF EXPATRIATE CONTRACTORS’ SITE MANAGEMENT PRACTICES IN THE NIGERIAN CONSTRUCTION INDUSTRY ASSESSMENT OF DETERMINANTS OF CONSTRUCTION TENDER SUM KNOWLEDGE MANAGEMENT PRACTICE OF BUILDING CONSTRUCTION FIRMS AT PROJECT LEVEL SUSTAINABLE WASTE MANAGEMENT SYSTEM IN ABATTOIR DESIGN AN EVALUATION OF SUSTAINABLE DESIGN STRATEGIES TO IMPROVE ENERGY EFFICIENCY OF SHOPPING MALLS EVALUATION OF ARCHITECTURE AS A TOOL TO ENHANCE CREATIVITY IN THE DESIGN OF A CENTRE FOR ARTS AND CREATIVITY

click on whatsapp