Site Logo E-PROJECTTOPICS

TENDER MANAGEMENT AND BID EVALUATION FOR OPTIMUM RESULTS


📝


Presented To


Environmental Design Department

📄 Pages: 99       🧠 Words: 11245       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 350      

⬇️ Download (Complete Report) Now!

ABSTRACT
This thesis takes premise that tender management and bid evaluation are solid foundations to proper project execution. The study therefore sets to look into how tender management and bid evaluation process will assist in successful project execution. In order to achieve this aim the present systems of tender management and bid evaluation were investigated. Two organisations were investigated with a view to finding out how tenders are managed and bids evaluated. Questionnaires were distributed to contractors registered with Niger State and Ahmadu Bello University, Zaria. This study has revealed that Tenders Boards where only a few professionals are represented run the risk of over relying on the technical opinion of the consultants. Furthermore, much of the tasks of the board are delegated to ill-equiped personnel who do not appreciate the implications of their decisions with respect to construction matters. The degree of information flow at tender stages was also found to be inadequate. Therefore, to improve the efficiency of tender management and bid evaluation it has been suggested that the composition of Tenders Boards be made up of a good number of professionals in the building industry. Also a new method of bid evaluation employing the use of contractors average, which hopefully will overcome some of the shortcomings of the present system, has been proposed.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 99       🧠 Words: 11245       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 350      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

APPRAISAL OF ABUJA METROPOLITANT MANAGEMENT COUNCIL (AMMC) STRUCTURE AND PROCESS AN ASSESSMENT OF EXPATRIATE CONTRACTORS’ SITE MANAGEMENT PRACTICES IN THE NIGERIAN CONSTRUCTION INDUSTRY GLASS RECYCLING IN WASTE MANAGEMENT ASSESSMENT OF MEDICAL WASTE MANAGEMENT PRACTICES PARTNERSHIP FRAME-WORK FOR THE PROVISION AND MANAGEMENT OF URBAN INFRASTRUCTURE IN ABUJA CITY URBAN MANAGEMENT IMPLICATIONS OF ALMAJIRI SCHOOLS AN APPRAISAL OF FACTORS MILITATING AGAINST THE EFFECTIVE IMPLEMENTATION OF FORMAL RISK MANAGEMENT TECHNIQUES IN PROJECT DELIVERY AN EVALUATION OF THE SUITABILITY OF CERAMIC RAW MATERIALS IN KEBBI STATE FOR THE PRODUCTION OF TABLEWARE FOR SMALL SCALE INDUSTRY AN EVALUATION OF ART EDUCATION PROGRAMMES IN SOME SELECTED POST-PRIMARY SCHOOLS AN APPRAISAL OF SOFT SKILLS REQUIRED FOR SUCCESSFUL PROJECT MANAGEMENT OF CONSTRUCTION PROJECTS AN EVALUATION OF ARCHITECTURAL FORMS FOR IMPROVING ENERGY EFFICIENCY IN SHOPPING MALL DESIGN ASSESSMENT OF ORGANISATIONAL LEADERSHIP FOR KNOWLEDGE MANAGEMENT PRACTICE IN THE NIGERIAN CONSTRUCTION INDUSTRY AN EVALUATION OF COMMUTERS’ PERCEPTION OF GRAPHIC DESIGN FACTORS IN LIGHT-EMITTING DIODE ADVERTISEMENT URBAN MANAGEMENT IMPLICATIONS OF PERI URBAN GROWTH AN APPRAISAL OF THE PERFORMANCE OF STAKEHOLDERS MANAGEMENT IN CONSTRUCTION PROJECTS EVALUATION OF UNDERGRADUATE SCULPTURE CURRICULUM IN SELECTED NIGERIAN UNIVERSITIES RELIABILITY OF THE ENGINEERS ESTIMATE IN SELECTIVE TENDERING FOR BUILDING WORKS A SYSTEM APPROACH TO EFFECTIVE PROJECT MANAGEMENT CONTROL EVALUATION OF PROJECT RISK AND THE DETERMINATION OF CONTINGENCY SUM FOR BUILDING DEVELOPMENTS IN NIGERIA ENERGY MANAGEMENT SCHEME FOR A UNIVERSITY CAMPUS

click on whatsapp