EMPIRICAL DETERMINATION OF LABOUR OUTPUTS FOR BLOCK LAYING IN F.C.T

(A CASE STUDY OF ABUJA AND NASARAWA STATE)


📝


Presented To


Environmental Design Department

📄 Pages: 89       🧠 Words: 8298       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 103      

⬇️ Download (Complete Report) Now!

ABSTRACT
The source and nature of output constants used for preparation of construction estimates should be accurate and reliable for the client to have confidence on the prepared estimates. This research is focused on using time study approach to empirically determine the outputs of block laying work items inconstruction industry. The study reviewed BESMM3 and surveyed possible block work items in construction sites. Ten work items were selected from the identified block work items in BESMM3 and construction sites for Physical observations and output measurement. A total of 105 sites were observed in F.C.T., Abuja and Nasarawa state. Data collected were subjected to statistical analysis using both the descriptive and inferential data analysis techniques. The inferential tools adopted were T-test and ANOVA statistics to assess and examine the influence of some selected labour productivity factors on the outputs of the workers observed. The inferential test revealed the following; period of observation, shape of the building and mode of employment significantly affected outputs on the ten work items. The results of the analysis carried out established mean output values per day for: 150mm thick block in foundation (12.85m2); 150mm thick block in superstructure (13.22 m2); 150mm thick block in superstructure overhand (12.47m2); 225mm thick block in foundation (8.90m2); 225mm thick block in superstructure (11.17m2); 225mm thick block in superstructure overhand (9.16m2); 225mm thick block isolated piers in superstructure (5.00m2); 225mm thick block piers in superstructure overhand (4.57m2); 225mm thick block in pit bottom plan > 4 m2 (7.85m2); 225mm thick block in bottom plan < 4 m2 (7.13m2). The study also identified forty-four (44) block work items not captured in BESMM3 and suggested that these work items be incorporated into BESMM3 for productive and cost implication. The research recommended that in compliance to BESMM3, the NIQS in collaboration with NJIC to sponsor a research on determination of labour outputs in all trades as a way to ensure uniformity in output constants. The study therefore finally concludes that SMM takes cognizance of productivity impact associated with labour and it is imperative for reliability and accuracy in block work estimate to empirically determine labour outputs on the basis of work items as stated in BESMM3.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 89       🧠 Words: 8298       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 103      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

INVESTIGATION INTO THE POSSIBLE USE OF POWDERED BURNT BRICK (PBB) AND ORDINARY PORTLAND CEMENT (OPC) ADMIXTURE FOR SANDCRETE BLOCKS PRODUCTION AN EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR PAINTING IN THE NIGERIAN CONSTRUCTION INDUSTRY EVALUATION OF PROJECT RISK AND THE DETERMINATION OF CONTINGENCY SUM FOR BUILDING DEVELOPMENTS IN NIGERIA DETERMINATION OF THE SUITABILITY OF GROUNDNUT HUSK ASH AS A SOURCE OF FLUXING AGENT FOR GLASS MAKING CONTROL OF LABOUR COSTS IN BUILDINGS THE SUITABILITY OF HUSKSCRETE BLOCKS AS CONSTRUCTION UNITS EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR FLOOR SCREED AND TILE FINISHES FOR CONSTRUCTION WORK IN ABUJA COMPARISON OF PERFORMANCE OF TRADITIONAL AND DIRECT LABOUR PROCUREMENT METHODS ADOPTED BY THE NIGERIAN ARMY THE EFFECTS OFPRODUCTIVITYAND WORK FLOW VARIABILITY ON CONSTRUCTION JOBSITE LABOUR PERFORMANCE IN NIGERIA DETERMINATION OF THE PROSPECT OF PARTNERING AS PROCUREMENT METHOD IN THE NIGERIAN CONSTRUCTION INDUSTRY AN EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR WALL TILES ASSESSMENT OF THE COMPRESSIVE STRENGTH OF SOIL CEMENT BLOCK EXPOSED TO NPK FERTILIZER

click on whatsapp