Site Logo E-PROJECTTOPICS

ASSESSMENT OF BARRIERS TO COMMUNICATION IN THE NIGERIAN CONSTRUCTION INDUSTRY


📝


Presented To


Environmental Design Department

📄 Pages: 89       🧠 Words: 12826       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 77      

⬇️ Download (Complete Report) Now!

ABSTRACT
All the various stages of construction rely on professionals transferring appropriate and relevant information to develop a buildable design that meets the client's requirements. As the project unfolds and the design is realized, information in the form of drawings, specifications and construction methods must be communicated from one expert to another. This study's aim to find out the factor that causes communication barriers in the construction industry. A cross sectional descriptive study design was used and 100 professionals from the construction industry were selected using a non-probability convenience sampling technique. Statistical package for social sciences (SPSS Version 20) was used for the analysis. Data was summarized using frequency tables and graphic presentation. Chi-square test was used to test the association between the predictor variable and the outcome variable. P-value was set at P < 0.05. The research sampled 82 professionals working with consultant, project clients and contractors. The research established that within the Nigerian construction industry there have been many barriers to communication on construction project in Nigeria and the inherent factors that influences the occurrence of this barriers was also determine which includes: Badly expressed message, Adopting to the behaviour of a group, Limited vocabulary, Environment, Job dissatisfaction, Pronunciation, Disturbing moment, Religious beliefs, Time schedule pressure, Ethics, Social differences, Body language, Gestures, Ascent, Grammar, and Unconscious incompetence. The relationship between communication barriers and the factors that influences its occurrence was established. Finally the research established that poor communication as a result of barriers to communication had resulted in project delayed, project cost overrun, poor project quality and affects workers safety on site

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 89       🧠 Words: 12826       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 77      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

COMPARISON OF PERFORMANCE OF TRADITIONAL AND DIRECT LABOUR PROCUREMENT METHODS ADOPTED BY THE NIGERIAN ARMY AN ASSESSMENT OF THE ENTREPRENEURIAL SKILLS OF QUANTITY SURVEYING CONSULTANTS AN ASSESSMENT OF SHARED LEADERSHIP AND TEAM PERFORMANCE IN CONSTRUCTION PROJECTS FRAMEWORK FOR DETERMINING PERFORMANCE OF CONSTRUCTION PROJECTS ASSESSMENT OF THE IMPLEMENTATION OF ABUJA TOURISM DEVELOPMENT MASTER PLAN (2000 – 2010) ASSESSMENT OF THE COMPRESSIVE STRENGTH OF SOIL CEMENT BLOCK EXPOSED TO NPK FERTILIZER DETERMINATION OF THE PROSPECT OF PARTNERING AS PROCUREMENT METHOD IN THE NIGERIAN CONSTRUCTION INDUSTRY ADOPTABILITY OF INTEGRATED PROJECT DELIVERY (IPD) CONCEPTS IN THE NIGERIAN CONSTRUCTION INDUSTRY ASSESSMENT OF MANAGEMENT FRAMEWORK FOR URBAN SECURITY ASSESSMENT OF NIGERIAN NATIONAL CARNIVAL COSTUME AND ITS REBRANDING FOR GREATER APPRECIATION CONSTRUCTION PROFESSIONALS’ PERCEPTION OF ECONOMIC SUSTAINABILITY FOR HOUSING DELIVERY ASSESSING THE CAPABILITIES OF CONTRACTORS IN MONITORING AND CONTROLLING CONSTRUCTION CASH FLOW IN NIGERIA BUILD-OPERATE TRANSFER (BOT) FACTORING METHOD:A FINANCING SCHEME FOR CONSTRUCTION PROJECT AN ASSESSMENT OF THE INFLUENCE OF COMBUSTION GENERATED POLLUTANTS ON THE INDOOR AIR QUALITY OF SELECTED LABORATORIES ASSOCIATION OF NIGERIAN AUTHORS' VILLAGE, KURRA FALLS. "ARCHITECTURE AS AN INSPIRATION FOR CREATIVE WRITING THE SIGNIFICANCE, MEANINGS AND AESTHETIC VALUES OF SOME NIGERIAN ARMY BADGES AN INVESTIGATION INTO THE DEVELOPMENT OF LOCAL RAW MATERIALS FOR THE CERAMICS INDUSTRY AN IMPROVEMENT OF TRADITIONAL DYEING AS A POTENTIAL SMALL SCALE TEXTILE INDUSTRY AN ASSESSMENT OF CONTRACTOR’S RISKS EXPOSURE WITHIN SOME STANDARD FORMS OF BUILDING CONTRACT IN NIGERIA FUNCTIONAL MONUMENTALITY: AN ARCHITECTURAL STUDY "COMMUNICATIONS, COMPUTER AND DATA TECHNOLOGIES

click on whatsapp