Site Logo E-PROJECTTOPICS

DESIGN OF SANITARY AND MECHANICAL SERVICES SYSTEMS IN A DAIRY PLANT


📝


Presented To


Environmental Design Department

📄 Pages: 88       🧠 Words: 6381       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 463      

⬇️ Download (Complete Report) Now!

ABSTRACT
This thesis is on the design of the building services requirement of a dairy plant. Investigation of the engineering services problems of four existing medium scale dairy plants at Kaduna, Funtua, Jos and Minna showed that the greatest problem of the dairy industry is sanitation, and the building services requirement being: Water (cold and hot) services, sewage disposal, Refrigeration and Airconditioning. The work therefore tried to optimize the design of these services based on production capacity of 18,000 litres of milk products per shift of 8 hours. Factors considered in the design included the number of people that work in the plant, the processes that the milk products undergo in the industry which determine temperatures of the various rooms, the hot and cold water demand the nature of wastes and waste treatment, and the refrigeration capacity. The work investigated pipeline and insulation problems and specified materials and sizes. The production capacity and processes determined the machine and equipment specifications. This in turn determined the plant layout and manpower requirement as shown in the organisation chart. The building services were then designed to suite the plant layout. Detailed designs of the plant layout and these building services are shown in Drawings 1 to 6 vi (folded and attached at the back cover). The various component designs are illustrated in figures 1 - 43 The design of the storm drainage system is based on the severest rainfall intensity in Kaduna as shown in tables 4-13 extracted from the Agro-Meteorological Bulletin of Nigeria (1980-1983).

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 88       🧠 Words: 6381       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 463      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

USE OF DAYLIGHTING STRATEGIES FOR LIGHTING ENERGY COST REDUCTION IN A METROPOLITAN LIBRARY DESIGN APPLICATION OF BIO-CLIMATIC ARCHITECTURE IN THE DESIGN OF ENGINEERING COMPLEX ADAPTING INTERNATIONAL SYSTEM OF TYPOGRAPHIC AND PICTURE EDUCATION (ISOTYPE) WAY-FINDING DESIGN IN THE JOS METROPOLIS ADAPTATION OF TRADITIONAL DESIGN CONCEPTS FOR KANO STATE HISTORY AND CULTURE BUREAU COMPLEX APPLICATION OF PASSIVE COOLING TECHNIQUES IN THE DESIGN OF PROPOSED UNIVERSITY SENATE BUILDING EXPLORING THE PRINCIPLES OF BIOMORPHIC ARCHITECTURE IN THE DESIGN OF CIVIC CENTER KADUNA ARCHITECTURAL RESPONSE TO EFFECTS OF WIND ON HIGH RISE BUILDING FORMS IN THE DESIGN OF MIXED-USE AT EKO ATLANTIC CITY LAGOS APPRAISAL OF SANITARY FACILITIES IN PUBLIC AREAS OF GARKI DISTRICT PERFORMANCE EVALUATION OF THE IMPLEMENTATION OF THE FEDERAL GOVERNMENT SITES AND SERVICES PROGRAMME IN NIGERIA INFLUENCE OF CLIENT ORGANISATION ON ACHIEVING VALUE IN BUILDING DESIGNS CRITICAL ASSESSMENT AND REDESIGN OF THE BRITISH AMERICAN TOBACCO POSTER DESIGNS IN NIGERIA AN EVALUATION OF SUSTAINABLE DESIGN STRATEGIES TO ENHANCE ENERGY EFFICIENCY IN CONFERENCE CENTRES AN EXPLORATION OF ECLECTICISM FOR THE DESIGN OF FILM ACADEMY IN KANO AN ASSESSMENT OF THE IMPLEMENTATION OF UNIVERSAL DESIGN PRINCIPLES IN THE PROVISION OF BUILDING SERVICES IN MULTI-STOREY BUILDINGS AN APPRAISAL OF PUBLIC WATER SUPPLY SYSTEMS FOR PARTNERSHIP ARRANGEMENT IMPROVING WAYFINDING IN HOSPITALS FOR THE DESIGN OF TRAUMA SPECIALIST HOSPITAL AVAILABILITY OF BOREHOLE SYSTEMS FOR POTABLE WATER SUPPLY EVALUATING USER NEEDS IN THE DESIGN OF PUBLIC LIBRARY, KADUNA: INTEGRATING CYBER COMMUNITY A NEW APPROACH TO PRISON DESIGN PROTOTYPE DESIGN AND COSTRCTION OF A TWO-CHAMBER INTERMITTENT TANK FURNACE FOR SIMULTANEOUS DUAL STUDIO GLASS MELTING IN NIGERIA

click on whatsapp