Site Logo E-PROJECTTOPICS

EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR FLOOR SCREED AND TILE FINISHES FOR CONSTRUCTION WORK IN ABUJA


📝


Presented To


Environmental Design Department

📄 Pages: 89       🧠 Words: 9257       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 273      

⬇️ Download (Complete Report) Now!

ABSTRACT
There is dearth of information on output level of building operatives in Nigeria, consequently, the output constants currently used for preparation of construction estimates are remnants of British colonial heritage or derived from untested experiences. Therefore this study aims at empirically determining output constants for floor finishes (screeds and tiles) for building project in Abuja. The objectives are to identify the productivity factors related to Building Engineering Standard Method of Measurement 3 (BESMM3) and evaluation of their impact on the outputs of five work items of floor finishes. The procedure adopted field survey involving work measurement to observe and measure operatives output. Data was collected from 80 on-going construction sites with an average of 50 gangs of workers for each work item to establish the following average outputs per day; 25mm thick cement and sand screed (23.70), 44mm thick cement and sand screed (19.31), 400 X 400mm ceramic floor tile (27.38), 300 X 600mm ceramic floor tile (30.18) and 300 X 300mm ceramic floor tile (23.61). The study also revealed a significant difference on mode of employment and period of observation on the outputs of the workers. The results suggest that experience and negotiation as mode of employment affect output of workers to varying degrees based on the thickness of floor screed and unit area of floor tile. The study has recommended that the established output should serve as an effective baseline for efficient estimating process and be in compliance with the BESMM requirements.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 89       🧠 Words: 9257       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 273      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

ADAPTING SOME SELECTED MOTIFS OF ZARIA WALL DECORATIONS FOR CERAMIC TILE DESIGNS AND PRODUCTION DEVELOPING A FRAMEWORK FOR THE MARKETING OF QUANTITY SURVEYING SERVICES AN APPRAISAL OF THE CAREER EXPERIENCES OF PROFESSIONAL WOMEN IN THE NIGERIAN CONSTRUCTION INDUSTRY MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA RECREATION AND SHOPPING COMPLEX, ABUJA ARCHITECTURAL RESPONSE TO URBAN RECREATIONAL NEEDS RELIABILITY OF THE ENGINEERS ESTIMATE IN SELECTIVE TENDERING FOR BUILDING WORKS TOTAL ELECTRON CONTENT ESTIMATION AND ANALYSIS OVER THE NIGERIAN GLOBAL NAVIGATION SATELLITE SYSTEM PERMANENT REFERENCE NETWORK APPRAISAL OF THE IMPLEMENTATION OF MASS HOUSING PROGRAMME IN THE FCT, ABUJA AL-MUNTADA AL-ISLAMI NATIONAL HEADQUARTERS ABUJA - NIGERIA: THE EVOLUTION OF ISLAMIC ARCHITECTURE IN NIGERIA STUDENTS' UNION COMPLEX UNIVERSITY OF ABUJA (SPACE ORGANISATION AS A STIMULUS FOR INTERACTION) NATIONAL PARKS HEADQUARTERS, ABUJA: MINIMIZING THE PROBLEMS OF CIRCULATION IN AN OFFICE SPACE A SURVEY OF CONCRETE PRACTICE ON SELECTED CONSTRUCTION SITES IN NIGERIA A COMPARATIVE STUDY OF AHMADU BELLO UNIVERSITY TEXTILE DESIGN PROGRAMMES AND JOB EXPECTATIONS OF IT'S GRADUATES IN THE TEXTILE INDUSTRY ASSESSMENT OF ORGANISATIONAL LEADERSHIP FOR KNOWLEDGE MANAGEMENT PRACTICE IN THE NIGERIAN CONSTRUCTION INDUSTRY EVALUATION OF PROJECT RISK AND THE DETERMINATION OF CONTINGENCY SUM FOR BUILDING DEVELOPMENTS IN NIGERIA RECONSTRUCTION OF CENTRAL MARKET, JOS; Exploring Architectural Determinants to Urban Renewal ASSESSMENT OF PARKING IN COMMERCIAL ZONES OF WUSE II DISTRICT, FEDERAL CAPITAL CITY (FCC), ABUJA FRAMEWORK FOR DETERMINING PERFORMANCE OF CONSTRUCTION PROJECTS DEVELOPING FACTOR-BASED MODELS FOR MEASURING AND PREDICTING HAZARD RECOGNITION CAPABILITY OF CONSTRUCTIONWORKERS A CONTEXTUAL ANALYSIS OF SELECTED ART WORKS ON PEACE AND CONFLICT RESOLUTION

click on whatsapp