Site Logo E-PROJECTTOPICS

ASSESSMENT OF QUALITY OF CONSTRUCTION WORK IN MASS HOUSING PROJECT WITH MULTIPLE CONTRACTORS

(A CASE STUDY OF KANO, NIGERIA)


📝


Presented To


Environmental Design Department

📄 Pages: 100       🧠 Words: 8878       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 547      

⬇️ Download (Complete Report) Now!

ABSTRACT
Housing across societies is one of the indices for measuring people's standard of living. Poor quality in construction projects is a common phenomenon, and could be seen as lack of conformity or incompliance with contract agreement. This study assessed the influence of multiple contractors on the quality of construction work in Kwankwasiyya city Housing project Kano. In order to achieve this, the study focuses on the assessment of quality workmanship using multiple contractors, and determines the uniformity or otherwise of work executed by multiple contractors. The quantitative research approach was adopted, using field survey; the population size used was 16 number contractors, and Purposive sampling was used in selecting the contractors. Checklist was the instrument used for the data collection. Analysis was done using both descriptive and inferential statistics using computer software. Finding shows that, the quality rating for workmanship of Kwankwasiyya project for Floor, wall and Ceiling is 55%, 86% and 58% respectively and are rated moderate quality. However, quality rated of workmanship for doors and windows for all the contractors was found to be of high quality for up to 64%. Therefore, Kruskal-Wallis test was used for inferential analysis discovered that, there is no uniformity in the quality of workmanship of the Kwankwasiyya contractor's projects. The study established quality rating of workmanship to be generally below the selection requirement of competent contractors and monitoring of the projects. Recommended that, there is need for artisan skill improvement, most especially in floor tiling and floor finishing. There should be proper check of quality construction material, to ensure usage of correct material during construction work.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 100       🧠 Words: 8878       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 547      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

AN ASSESSMENT OF THE IMPACTS OF PLANNING CONTROLS ON RESIDENTIAL DEVELOPMENTS IN KADUNA METROPOLIS AN APPRAISAL OF THE CAREER EXPERIENCES OF PROFESSIONAL WOMEN IN THE NIGERIAN CONSTRUCTION INDUSTRY ASSESSMENT OF BARRIERS TO COMMUNICATION IN THE NIGERIAN CONSTRUCTION INDUSTRY HOUSING PROVISION FOR WORKERS IN URBAN AREAS AN ASSESSMENT OF LIFT SYSTEM PERFORMANCE IN SELECTED HIGH RISE BUILDINGS IN ABUJA CITY AN EVALUATION OF HOUSING AFFORDABILITY FOR NIGER STATE CIVIL SERVANTS UNDER PUBLIC-PRIVATE PARTNERSHIP (PPP) HOUSING DEVELOPMENT KNOWLEDGE MANAGEMENT PRACTICE OF BUILDING CONSTRUCTION FIRMS AT PROJECT LEVEL ASSESSMENT OF SOME INDICES OF PROFESSIONALISM IN THE NIGERIAN CONSTRUCTION INDUSTRY BUILD-OPERATE TRANSFER (BOT) FACTORING METHOD:A FINANCING SCHEME FOR CONSTRUCTION PROJECT AN APPRAISAL OF FACTORS MILITATING AGAINST THE EFFECTIVE IMPLEMENTATION OF FORMAL RISK MANAGEMENT TECHNIQUES IN PROJECT DELIVERY MODELING DURATION OF BUILDING RENOVATION PROJECTS ASSESSMENT OF NIGERIAN NATIONAL CARNIVAL COSTUME AND ITS REBRANDING FOR GREATER APPRECIATION APPRAISAL OF THE IMPLEMENTATION OF MASS HOUSING PROGRAMME IN THE FCT, ABUJA AN ASSESSMENT OF THE NIGERIAN CONSTRUCTION INDUSTRY’S READINESS TO ADOPT VALUE MANAGEMENT PROCESS IN EFFECTIVE PROJECT DELIVERY CONSTRUCTION PROFESSIONALS’ PERCEPTION OF ECONOMIC SUSTAINABILITY FOR HOUSING DELIVERY ASSESSMENT OF MEDICAL WASTE MANAGEMENT PRACTICES ISLAMIC THEOLOGICAL CENTRE, KANO AN EXAMINATION OF ISLAMIC ARCHITECTURE WITH RESPECT TO CULTURAL AND ENVIRONMENTAL FACTORS ASSESSMENT OF THE IMPLEMENTATION OF THE NEW MILLENIUM CITY MASTER PLAN, KADUNA EVALUATION OF PROJECT RISK AND THE DETERMINATION OF CONTINGENCY SUM FOR BUILDING DEVELOPMENTS IN NIGERIA CHARACTERISTICS OF REACTIVE POWDER CONCRETE PRODUCED WITH LOCALLY SOURCED UNREFINED METAKAOLIN AND GEAR INNER WIRE

click on whatsapp