Site Logo E-PROJECTTOPICS

AN ASSESSMENT OF SAFETY RISK FACTORS DURING INSTALLATION AND DISMANTLING OF TOWER CRANES ON CONSTRUCTION SITES


πŸ“


Presented To


Environmental Design Department

πŸ“„ Pages: 94       🧠 Words: 10375       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 170      

⬇️ Download (Complete Report) Now!

ABSTRACT
The process of erection, dismantling and alteration of heights in tower cranes are major safety determinants on construction sites and can result to fatal accidents if the risks involved are not properly managed. Risk factors associated with this process have been identified by some researchers but, no effort was made to scientifically analyse these factors. Hence, the research aimed at assessing safety risk factors during installation and dismantling of tower cranes with a view to establishing the most significant risk factors. A well-structured questionnaire was used to collect data from safety managers, equipment managers and team leaders of installation and dismantling operation with respect to probability/likelihood of occurrence and degree of impact for safety risk factors. Data obtained were analysed using descriptive statistics (mean and percentages). From the results, relative significance index score (RSIS) was obtained and evaluated on a 5x5 matrix risk rating scale to determine the criticality of safety risk factors. Results showed that ?abrasion?had the highest probability of occurrence with a mean value of 3.63 and as such, the most probable factor that occur on site. The study also found that ?fracture of a wire rope during dismantling? had the highest degree of impact with a mean value of 4.63 and can result to fatality on site. The latter also had the highest RSIS of 15.6 indicating a high risk factor. This research concludes that fracture of a wire rope during dismantling is a high risk factor and could result from poor maintenance culture that is generally lacking on construction sites

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

πŸ“„ Pages: 94       🧠 Words: 10375       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 170      

⬇️ Download (Complete Report) Now!

πŸ”— Related Topics

ASSESSMENT OF PROFESSIONAL'S PERCEPTION ON MATERIALS MANAGEMENT PRACTICES ON CONSTRUCTION SITES IN SELECTED STATES IN NIGERIA AN APPRAISAL OF FACTORS MILITATING AGAINST THE EFFECTIVE IMPLEMENTATION OF FORMAL RISK MANAGEMENT TECHNIQUES IN PROJECT DELIVERY ASSESSMENT OF MEDICAL WASTE MANAGEMENT PRACTICES ASSESSMENT OF THE IMPLEMENTATION OF BWARI MASTER THE SUITABILITY OF HUSKSCRETE BLOCKS AS CONSTRUCTION UNITS PLANNING AND CONTROL MODEL FOR THE CONSTRUCTION OF A LARGE IRRIGATION PROJECT AN ASSESSMENT OF THE PROVISION OF INFRASTRUCTURE UNDER THE PUBLIC PRIVATE PARTNERSHIP HOUSING SCHEME IN ABUJA ASSESSMENT OF THE IMPLEMENTATION OF THE NEW MILLENIUM CITY MASTER PLAN, KADUNA A STUDY OF TEACHERS' ASSESSMENT OF CHILDREN'S CREATIVE ART WORKS IN SOME PRIMARY SCHOOLS AN ASSESSMENT OF THE PARTICIPATORY ATTRIBUTES OF CONSTRUCTION PROFESSIONALS FOR EFFECTIVE VALUE MANAGEMENT AN APPRAISAL OF THE CAREER EXPERIENCES OF PROFESSIONAL WOMEN IN THE NIGERIAN CONSTRUCTION INDUSTRY AN EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR PAINTING IN THE NIGERIAN CONSTRUCTION INDUSTRY PRODUCT LIFE CYCLE AND ENVIRONMENTAL IMPACT ASSESSMENT OF 7UP BOTTLE ASSESSMENT OF PROFESSIONAL'S PERCEPTION OF KNOWLEDGE AND SKILLS REQUIREMENT OF CONTRACTORS FOR MASS HOUSING CONSTRUCTION AN ASSESSMENT OF ACCESS TO FINANCE FOR HOUSING DEVELOPMENT THE USE OF RICE HUSK POWDER IN COMPOSITES CEMENT SYSTEM ASSESSMENT OF URBAN BUS SERVICES IN MINNA NIGER STATE AN EVALUATION OF THE ENVIRONMENTAL FACTORS THAT LEAD TO ABANDONMENT OF PUBLIC BUILDING PROJECTS AN ASSESSMENT OF CONTRACTOR’S RISKS EXPOSURE WITHIN SOME STANDARD FORMS OF BUILDING CONTRACT IN NIGERIA AN APPRAISAL OF AYO AINA'S INSTALLATION ART

click on whatsapp