Site Logo E-PROJECTTOPICS

A SUBSIDENCE MONITORING PROGRAM FOR AHMADU BELLO UNIVERSITY DAM, ZARIA


📝


Presented To


Engineering Department

📄 Pages: 84       🧠 Words: 9969       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 80      

⬇️ Download (Complete Report) Now!

ABSTRACT
A research project dealing with the determination and monitoring of subsidence (vertical movements) of A.B.U. Dam as a result of increase in volume of water in the reservoir, causing sudden load (causative effects) on the dam is discribed. It is of great interest and importance to design a program to detect, direction of these movements so as to plan (an) appropriate measure(s) against the disastrous consequences of such movements. These require precise instruments of high measuring accuracy and reliability, refined survey methods incorporating quick and frequent check operations and analysis of results. The Dam is an earth dam. A review of current monitoring techniques was given. Repeated Precise levellings of elevation of monitoring stations were made before the start of rainfall (low water level) in April, and after maximum rainfall (highest water level) has been recorded, in August. An approach whereby upper and lower stadia staff readings were not recorded but using only the center hair reading of both left and right graduations on staff was adopted. The advantages of this method were stated. Rigorous least squares adjustment was carried out. Analysis of the data by Chi square test was done to determine the acceptability of the levelling. It is acceptable at the 95% confidence limit. The deformation analysis was done using the

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 84       🧠 Words: 9969       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 80      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

EVALUATION OF NOISE LEVELS FROM VARIOUS SOURCES WITHIN ZARIA METROPOLIS AN ASSESSMENT OF THE PERFORMANCE AND MAINTENANCE CULTURE OF THE AHMADU BELLO UNIVERSITY, SAMARU, ZARIA WATER TREATMENT PLANT Estimation and Characteristics of Fluvial Sediment Deposits into Kubanni Reservoir, Zaria ELIMINATING SPEED CONSTRAINTS ALONG KADUNA-ZARIA RAILWAY LINK PAVEMENT FAILURE INVESTIGATION ALONG ZARIA - FUNTUA ROAD A STOCHASTIC MODEL FOR THE PUBLIC TRANSPORT LINKAGE BETWEEN THE NEW AND OLD CAMPUSES OF BAYERO UNIVERSITY, KANO BIOCLIMATIC RESPONSE IN DESIGN OF FACULTY OF ENVIRONMENTAL SCIENCES IN THE HOT DRY CLIMATE OF YOBE STATE UNIVERSITY (YSU), DAMATURU STRUCTURAL SYNTHESIS USING STOCHASTIC PROGRAMMING MODELING OF WATER QUALITY OF BINDARE STREAM IN ZARIA-NIGERIA USING MATLAB DIURNAL AND SEASONAL VARIATIONS OF MEDIUM WAVE RADIO SIGNAL AT ZARIA RAINFALL DATA GENERATION FOR SAMARU, ZARIA USING STATISTICAL PARAMETERS SCALABILITY EVALUATION AND IMPROVEMENT IN IP-BASED CAMPUS NETWORKS: A CASE STUDY OF AHMADU BELLO UNIVERSITY ZARIA NETWORK CHROMIUM REMOVAL FROM CHELTECH (ZARIA) TANNERY EFFLUENT AS A FORM OF EFFLUENT TREATMENT PROGRAM FOR ONE-WAY REINFORCED CONCRETE SLABS TO BS8110 (1985) PERFORMANCE EVALUATION OF NEAZDP ANIMAL TRACTION PROGRAMME DEVELOPMENT OF ENHANCED DIFFERENTIATED SERVICES MODEL OF CAMPUS INTERNET NETWORK: A CASE STUDY OF AHMADU BELLO UNIVERSITY, ZARIA DEVELOPING STATISTICAL PROGRAMS ON A MICRO COMPUTER FOR SURVEYING DATA ANALYSIS A STOCHASTIC LINEAR PROGRAMMING APPROACH FOR THE PRODUCTION, DISTRIBUTION AND INVENTORY SYSTEMS OF THE NIGERIAN BOTTLING COMPANY (NBC) DEVELOPMENT OF AN IMPROVED FRAME LEVEL REDUNDANCY SCRUBBING ALGORITHM FOR STATIC RANDOM ACCESS MEMORY BASED FIELD PROGRAMMABLE GATE ARRAY STUDIES OF DISINFECTION BY-PRODUCTS AND HEAVY METALS IN AHMADU BELLO UNIVERSITY DRINKING WATER SUPPLIES AND OPERATIONS OF SOME TREATMENT PLANTS

click on whatsapp