Site Logo E-PROJECTTOPICS

AN ASSESSMENT OF THE PERFORMANCE AND MAINTENANCE CULTURE OF THE AHMADU BELLO UNIVERSITY, SAMARU, ZARIA WATER TREATMENT PLANT


📝


Presented To


Engineering Department

📄 Pages: 94       🧠 Words: 11364       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 332      

⬇️ Download (Complete Report) Now!

ABSTRACT
The project An Assessment of the Performance and Maintenance Culture of Ahmadu Bello University, Samaru, Zaria, Water Treatment Plant aimed at assessing the performance and the maintenance culture of the Ahmadu Bello University Water Treatment Plant (ABU WTP).The technique of survey method, monitoring of treatment process and questionnaires were used to obtain and process the required data. Therefore, each treatment unit was visited and critically examined, treatment processes monitored, leakages along the distribution network monitored for five weeks; and base on this approach, some performance indicators (PIs) were selected and their values were computed and compared with known standards. It was observed that the pump efficiency was 76% which is acceptable. About 1150.2 liters (303.9 gallons) that is 0.024% of water loss as a result of leakage along the pipeline within five weeks. The workability of the plant units was 85%, the availability of power at the plant was 95.83% and the average daily time of power supply is found to be 22 hours. The plant uses chlorine as disinfectant and this is acceptable by World Health Organization (WHO).The materials used for the Tanks and Reservoir is of International Standard (Concrete and Block). The maintenance culture predominant in the plant is preventive maintenance. The automatic dosing machine at the plant was unserviceable, hence dosing is done manually, this is not acceptable by international standard. The overall performance of the treatment plant was found to be 50%; this performance is very low comparing to the assessment criteria.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 94       🧠 Words: 11364       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 332      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

IMPROVED DESIGN AND PERFORMANCE ANALYSIS OF SIMILAR POLE RATIO DUAL STATOR WINDINGS FOR SIX PHASE INDUCTION MACHINES EVALUATION OF PITCHER IRRIGATION TECHNOLOGY FOR THE PRODUCTION OF LETTUCE (Lactuca sativa) CROP IN SAMARU, NIGERIA PERFORMANCE CHARACTERISTICS OF THE CRITICAL-DEPTH, LONG-THROATED FLUME UTILIZATION OF AQUEOUS TWO PHASE SYSTEM FOR THE REMOVAL OF COLOUR FROM TEXTILE WASTEWATER PERFORMANCE EVALUATION OF WUPA SEWAGE TREATMENT PLANT A COMBINED BIOGAS PLANT AND INCINERATOR SYSTEM FOR MUNICIPAL SOLID WASTE MANAGEMENT DESIGN, CONSTRUCTION AND TESTING OF A ZEOLITE-WATER SOLAR ADSORPTION REFRIGERATOR EFFECT OF MIX RATIO AND CURING WATER ON THE COMPRESSIVE STRENGTH OF OIL PALM SHELL (OPS) AGGREGATE CONCRETE RELIABILITY ASSESSMENT OF GSM POWER SYSTEM NETWORK PERFORMANCE EVALUATION OF MINI SPRINKLER IRRIGATION SYSTEM: COMPARISON OF THE PLASTIC AND IRON MADE SPRINKLER SYSTEM EVALUATION OF THESTRUCTURAL PERFORMANCE OF ASPHALTIC CONCRETE HIGHWAY PAVEMENT PREPARATION AND APPLICATION OF ?-FeOOH AND ?-FeOOH-SiO2-Al2O3 CATALYSTS FOR TANNERY EFFLUENT TREATMENT USING FENTON OXIDATION PROCESS DESIGN, CONSTRUCTION AND PERFORMANCE EVALUATION OF AN AXIAL-FLOW MILLET THRESHER MODELLING OF WATER QUALITY DETERIORATION IN THE DISTRIBUTION NETWORK OF KADUNA METROPOLIS USING MATLAB APPLICATION OF ZEOLITE 4A – METAKAOLIN MATRIX FOR THE REMOVAL OF SOME HEAVY METALS FROM CRUDE OIL TANK FARM WASTEWATER DETERMINATION OF THE AMOUNT OF DYE EXTRACTED FROM PLANTS AND EXAMINATION OF THEIR FASTNESS PROPERTIES TO COTTON FABRICS ASSESSMENT OF WATER AVAILABILITY UNDER THE INFLUENCE OF CLIMATE VARIABILITY PERFORMANCE EVALUATION OF DIFFERENT MATERIALS AS CHILLS IN SAND CASTING OF ALUMINIUM ALLOY DEVELOPMENT AND PERFORMANCE EVALUATION OF A FOUR ROW ANIMAL DRAWN MAIZE SEED PRECISION PLANTER ECONOMIC VIABILITY OF A SMALL HYDROPOWER PLANT AT ONUAKU RIVER, ABIA STATE NIGERIA

click on whatsapp