Site Logo E-PROJECTTOPICS

COMPARISON OF PERFORMANCE OF TRADITIONAL AND DIRECT LABOUR PROCUREMENT METHODS ADOPTED BY THE NIGERIAN ARMY


πŸ“


Presented To


Environmental Design Department

πŸ“„ Pages: 80       🧠 Words: 6163       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 291      

⬇️ Download (Complete Report) Now!

ABSTRACT
The study examined the performance of traditional system and direct labour procurement methods often employed by the Nigerian Army. Traditional system involves the use of professionals from outside the Army to realize a project while direct labour involves the use of professionals within the NA to execute a project. The aim was to find out if one has any advantage over the other. Project success determinants like cost, time and quality formed the basis for evaluation and comparison of the performance of the two methods. Comparison was done based on similarity of projects specifically, the magnitude of work, the type and specifications of work. Fifteen projects made up of ten renovation works and five new projects were considered for analysis for each of the two procurement methods compared. Results indicate that there is no significant difference in the quality of projects procured using either traditional system or the direct labour procurement methods. Further results also indicate that in terms of cost overrun, there is significant difference between the two methods. It was however discovered those overall costs of project were higher for those procured using the traditional system having similar floor area. It was also discovered that significant difference exist between times overrun in the two methods. Projects procured using the direct labour method took more time. The study concludes that there is the need for continuous training and exposure of the in- house professionals to improve their proficiency and efficiency to further enhance the quality of their products.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

πŸ“„ Pages: 80       🧠 Words: 6163       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 291      

⬇️ Download (Complete Report) Now!

πŸ”— Related Topics

THE HIGH COMMISSION OF BANGLADESH, ABUJA Symbolic Expression of Bangladeshi Traditional Architecture AN ASSESSMENT OF LIFT SYSTEM PERFORMANCE IN SELECTED HIGH RISE BUILDINGS IN ABUJA CITY ASSESSMENT OF BARRIERS TO COMMUNICATION IN THE NIGERIAN CONSTRUCTION INDUSTRY ASSESSING THE USAGE OF SPACES IN ACADEMIC LIBRARIES IN-TRANSITION FROM TRADITIONAL TO DIGITAL LIBRARIES: PROPOSED ABU PHASE TWO LIBRARY REDEVELOPMENT PROPOSAL FOR THE NATIONAL MUSEUM KADUNA THE APPLICATION OF INDIGENOUS NIGERIAN ARCHITECTURAL ELEMENTS IN CONTEMPORARY MUSEUM ARCHITECTURE DAYLIGHT PERFORMANCE AND OPTIMIZATION WITH LIGHT PIPE IN THE DESIGN OF MODERN ART MUSEUM ABUJA AN EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR PAINTING IN THE NIGERIAN CONSTRUCTION INDUSTRY TRANSFORMATION IN HAUSA TRADITIONAL RESIDENTIAL ARCHITECTURE ANALYSIS OF THE RELATIONSHIP BETWEEN ORGANISATIONAL CULTURE AND INNOVATION IN NIGERIAN QUANTITY SURVEYING FIRMS AN ASSESSMENT OF THE NIGERIAN CONSTRUCTION INDUSTRY’S READINESS TO ADOPT VALUE MANAGEMENT PROCESS IN EFFECTIVE PROJECT DELIVERY DEVELOPMENT OF PUBLIC PROCUREMENT STRATEGY FOR THE PROVISION OF POTABLE WATER INFRASTRUCTURE TO LOW INCOME URBAN AREAS (LIUAs) EFFECTS OF CURING METHODS ON THE PROPERTIES OF HARDENED RICE HUSK ASH AND SUGARCANE BAGASSE ASH CONCRETE AN INVESTIGATION INTO BUILD OPERATE AND TRANSFER IN THE PROVISION OF HOSTELS IN NIGERIAN FEDERAL UNIVERSITIES PERFORMANCE EVALUATION OF THE IMPLEMENTATION OF THE FEDERAL GOVERNMENT SITES AND SERVICES PROGRAMME IN NIGERIA NIGERIAN INSTITUTE OF INTERNATIONAL AFFAIRS COMPLEX ABUJA AN ATTEMPT TOWARDS EXPRESSING REGIONAL ARCHITECTURE AN APPRAISAL OF COST-BASED INFORMATION MANAGEMENT METHODS AT THE DESIGN STAGE OF BUILDING PROJECTS IN NIGERIA AN ASSESSMENT OF SHARED LEADERSHIP AND TEAM PERFORMANCE IN CONSTRUCTION PROJECTS ASSESSING THE EFFECTIVENESS OF PUBLIC PRIVATE PARTNERSHIP (PPP) PROCUREMENT MODEL FOR INFRASTRUCTURE DEVELOPMENT IN NIGERIA AN ASSESSMENT OF THE CONSTRAINTS TO UNIVERSITY - INDUSTRY COLLABORATION (UIC) INNIGERIAN CONSTRUCTION SECTOR MODIFICATION OF NIGERIAN TRADITIONAL MEN’S HORIZONTAL LOOM TO ENHANCE PRODUCTIVITY OF THE NARROW BAND FABRIC

click on whatsapp