THE EFFECTS OFPRODUCTIVITYAND WORK FLOW VARIABILITY ON CONSTRUCTION JOBSITE LABOUR PERFORMANCE IN NIGERIA


πŸ“


Presented To


Environmental Design Department

πŸ“„ Pages: 91       🧠 Words: 10067       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 143      

⬇️ Download (Complete Report) Now!

ABSTRACT
The management of daily labour productivity variability on site is an important aspect of lean thinking. The lean construction technique suggests that reducing variability gives better labour performance. Therefore, this work examines the analysis of labour productivity data of four cement-based activities which are; block laying, concreting, wall plastering and tiling from two hundred and forty-four construction sites of single storey buildings in Abuja metropolis. The objective was to determine the relationship between labour productivity variability and crew jobsite performance andalso to identify the level of gap between the present performance of all the builders handling the sampled projects and expected benchmark performance. The daily method of productivity data collection was adopted in this research. The data used were subjected to test for normality and found to be slightly normal with skewness values of 0.425, -0.247, 0.645 and 0.336 forblock laying, concrete activity, wall plastering and tiling work respectively. It was observed that the skewness value for concrete work was found to benegative which means that the distribution was negatively skewed while other results were positively skewed.The research variable, performance index that is the Project Waste index (PWI) wascomputed usingconceptual (site-based) model of labour productivity measurement and the resultsrevealed that many of the projects studied had low performance rating while few performed well. The values for coefficient of variation of labour productivity were also computed. A simple regression and correlation analyses were used to determine relationships of the research variables. Correlation results showed that there are strong associations between dependent variableprojectwaste index (performance) andindependent variablewhich is the coefficient of variability for labour productivity. The analysis yielded R values as follows;blockwork = 0.630; concrete work = 0.601; plastering work = 0.764 and tiling work = 0.588 at 0.001 significant level. This showed that, the independent variables are thus found to be significant predictors of performance of site labour crew for all activities investigated. Also the results showed that the variability in daily labour productivity is more highly correlated to project performance than workflow output which means that reducing variability in labour productivity appears to have a significant effect on performance. The performance gap values for block laying, concrete activity, wall plastering and tiling work were found to be 0.374man hrs/m2, 3.62 man hrs/m3, 0.362man hrs/m2 and 0.324man hrs/m2 respectively. A conceptual model was developed for the study.It was recommended that the site managers should be determined to get more output with a reduction in input. Alsoit was proposed that site managers should close up performance gaps in single storeyproject execution by reducing the disparity in values between baseline productivity and the mean labour productivity for the project.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

πŸ“„ Pages: 91       🧠 Words: 10067       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 143      

⬇️ Download (Complete Report) Now!

πŸ”— Related Topics

DESIGN AND PERFORMANCE ANALYSIS OF OUTER JACKET ALLIHN AND GRAHAM GLASS CONDENSERS (2018-10) JEKADA, JULIUS ZACHARIAH PERCEPTION OF CONSTRUCTION PROFESSIONALS ON ATTRIBUTES OF PROJECT SPONSORS AND CONCESSIONAIRES OF PUBLIC PRIVATE PARTNERSHIP PROJECTS SYNTHESIS OF ARABIC CALLIGRAPHY AND MOSAIC EFFECTS IN PAINTING EXPRESSIONS COMPARATIVE ANALYSES OF WURNO, DANGE AND WEPPA GYPSUMS IN NIGERIA FOR PLASTER AND CERAMIC PRODUCTION ENVIRONMENTAL RESPONSIBILITY AND PERFORMANCE OF QUOTED OIL COMPANIES IN NIGERIA HOUSING PROVISION FOR WORKERS IN URBAN AREAS PLANNING PROPOSAL FOR EFFICIENT INTRA-CITY VEHICULAR FLOW IN JOS CONSTRUCTION PROFESSIONALS’ PERCEPTION OF ECONOMIC SUSTAINABILITY FOR HOUSING DELIVERY ADOPTABILITY OF INTEGRATED PROJECT DELIVERY (IPD) CONCEPTS IN THE NIGERIAN CONSTRUCTION INDUSTRY ASSESSING THE INFLUENCE OF KNOWLEDGE MANAGEMENT ENABLERS ON ORGANISATIONAL PERFORMANCE OF CONSTRUCTION CONSULTANCY FIRMS HARNESSING PASSIVE COOLING STRATEGIES TO ENHANCE THERMAL COMFORT IN THE DESIGN OF PROPOSED SCHOOL OF ENVIRONMENTAL STUDIES ABDUGUSAU POLYTECHNIC ZAMFARA STATE, NIGERIA DEVELOPING A FRAMEWORK FOR THE MARKETING OF QUANTITY SURVEYING SERVICES DETERMINATION OF THE PROSPECT OF PARTNERING AS PROCUREMENT METHOD IN THE NIGERIAN CONSTRUCTION INDUSTRY EFFECTS OF PERMEABILITY REDUCING ADMIXTURE ON THE PROPERTIES OF BINARY CEMENTITIOUS MATRIX CONCRETE EFFECTS OF CURING METHODS ON THE PROPERTIES OF HARDENED RICE HUSK ASH AND SUGARCANE BAGASSE ASH CONCRETE PROTOTYPE DESIGN AND COSTRCTION OF A TWO-CHAMBER INTERMITTENT TANK FURNACE FOR SIMULTANEOUS DUAL STUDIO GLASS MELTING IN NIGERIA AN APPRAISAL OF PERFORMANCE MEASUREMENT PRACTICE OF CONSTRUCTION FIRMS GEOSPATIAL ANALYSIS OF QUARRY ACTIVITIES IN MPAPE DISTRICT, ABUJA NIGERIA ASSESSMENT OF HUMAN RESOURCE MANAGEMENT PRACTICES OF BUILDING CONSTRUCTION FIRMS AN EVALUATION OF THE QUALITATIVE CHARACTERISTICS OF PATTERN DYED FABRICS OF SMALL SCALE DYEING INDUSTRIES IN SOME PARTS OF NIGERIA

click on whatsapp