Site Logo E-PROJECTTOPICS

STUDIES OF INDUSTRIAL WASTEWATER EFFLUENT TREATMENT IN WASTE STABILIZATION POND


📝


Presented To


Engineering Department

📄 Pages: 92       🧠 Words: 10806       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 442      

⬇️ Download (Complete Report) Now!

ABSTRACT
Large volumes of wastewater are generated in Nigeria from industrial activities which often cause water pollution when they are not properly treated before being discharged into receiving water bodies. The conventional wastewater treatment plants are expensive and associated with high running and maintenance cost. These plants are also associated with generation of large volumes of chemical sludge. In view of the global economic recession cheaper options are being considered for treatment of industrial waste water such as brewery wastewater effluents. In this work the suitability of waste stabilization pond (WSP)as a cheaper alternative in the treatment of industrial wastewater was investigated so as to obtain design data, empirical and kinetic parameters for the wastewater treatment in WSP.A pilot WSP was designed and constructed for the treatment of raw brewery wastewater effluent. The Brewery wastewater effluents were collected from Nigerian Breweries PLC, Kudendan light industrial layout, Kaduna.The parameters considered for the design include: temperature, influent flow rate, influent BOD, Net Evaporation which are 28 oC, 0.2 m2/day, 1135.5 mg/L and 0.612 m3, respectively. The pond capacity is 4.7m3 (4700 L) and it was designed to reduce the BOD loading by 90% for a retention period of 21 days at an influent flow rate of 0.2m3/day.The pilot WSP was operated on a continuous steady state flow at an average ambient temperature of 29 OC over the retention period.The parameters that were analyzed on the raw and treated wastewater include: pH, Temperature, Total suspended solids (TSS), Turbidity, Chlorides, Biological Oxygen Demand (BOD5), Chemical Oxygen Demand (COD), Electrical conductivity (EC), Total dissolved solids (TDS) and Total Coliform. The mean values of these physicochemical parameters for the raw brewery wastewater for a period of 27 days were 3.76, 29.7 oC, 1048.9 mg/L, 6.09 NTU, 573.5 mg/L, 1128.8 mg/L, 2122.1 mg/L, 1011.8 μS/cm, 826.9 mg/L and 1 E-coli/100 mL respectively. At the retention period of 25 days, the values are 6.7, 27 OC, 199 mg/L, 2.0 NTU, 268 mg/L, 350 mg/L, 660 mg/L,287 μS/cm, 296 mg/L and 9 E-coli/100 ml respectively, after which negligible changes were recorded for the listed parameters at higher detention time. The BOD removal rate constant was 0.088 per day and the BOD-COD correlation was BOD = 0.531COD - 1.960.The BOD removal regression model was BOD = 0.0001t5- 0.0034t4- 0.1419t3+ 6.6096t2-102.09t 1114.5 and the pond performance efficiencies for the reduction/removal of TSS, Turbidity, Chlorides, BOD, COD, Conductivity and TDS are 81%, 67.2%, 53.2%, 69%, 68.9%, 71.6% and 64.2% respectively. The retention time was found to be 25 days as against 21 days calculated and this could be attributed to weather variation which influences the factors that enhance wastewater stabilization such as wind, temperature, and sunlight. The WSP was also found to be cost effective because of its low energy requirement for its operation and low maintenance. The pond performance was also found to be satisfactory and the kinetic parameter obtained can be utilized in the scale up design for industrial scale WSP.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 92       🧠 Words: 10806       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 442      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

ASSESSMENT OF SAWDUST ACTIVATED CARBON (SAC) IN THE TREATMENT OF AQUACULTURE EFFLUENT STUDIES OF UPSTREAM BLANKETS FOR CONTROL OF UNDERSEEPAGE IN EARTH DAMS AN ASSESSMENT OF THE PERFORMANCE AND MAINTENANCE CULTURE OF THE AHMADU BELLO UNIVERSITY, SAMARU, ZARIA WATER TREATMENT PLANT MODIFIED KAOLINITE CLAY AS CATALYST FOR BIODIESEL PRODUCTION FROM WASTE COOKING OIL STUDIES OF DISINFECTION BY-PRODUCTS AND HEAVY METALS IN AHMADU BELLO UNIVERSITY DRINKING WATER SUPPLIES AND OPERATIONS OF SOME TREATMENT PLANTS EFFECT OF LOCUST BEAN WASTE ASH ON CEMENTMODIFIED BLACK COTTON SOIL STABILIZATION OF BLACK COTTON SOIL WITH LIME- IRON ORE TAILING BLEND UTILIZATION OF AQUEOUS TWO PHASE SYSTEM FOR THE REMOVAL OF COLOUR FROM TEXTILE WASTEWATER EFFECT OF THERMAL PRE-TREATMENT ON THE BENEFICIATION OF NDIT ILMENITE RESOURCE BITUMEN STABILIZATION OF LATERITE PRETREATED WITH HEAT AS A FLEXIBLE PAVEMENT MATERIAL DEVELOPMENT OF EUCALPYTUS TERETICORNIS COMPOSITE (BARKS AND LEAVES) ADSORBENT FOR ADSORPTION OF CHROMIUM (VI) AND LEAD (II) IONS FROM SIMULATED WASTEWATER DEVELOPMENT OF A DYNAMIC OUTPUT-FEEDBACK REGULATOR FOR STABILIZATION AND TRACKING OF NON-SQUARE MULTI-INPUT MULTI-OUTPUT SYSTEMS THE STABILIZATION POTENTIALS OF PULVERIZED COAL BOTTOM ASH (PCBA) AND SUPERPHOSPHATE FERTILIZER RESIDUE (SFPR) STABILIZATION OF BLACK COTTON SOIL WITH IRON ORE TAILING EFFECTS OF MIXING ON THE PRODUCT DISTRIBUTION OF PYROLYSED PLASTIC WASTES THE USE OF MANGO (MANGIFERA INDICA) SEEDS AND DATES (PHOENIX DACTYLIFERA) SEEDS AS COAGULANTS IN WASTEWATER TREATMENT THE USE AND PERFORMANCE OF FISH FOR POLISHING EFFLUENT FROM WASTE STABILIZATION POND SYSTEM MODELING, SIMULATION AND STABILIZATION OF A DOUBLE QUAD INVERTED PENDULUM SYSTEM (DQIP) USING A LINEAR QUADRATIC REGULATOR (LQR) CONTROLLER MIXING CHARACTERISTICS AND PERFORMANCE OF STABILIZATION PONDS THE USE OF SELECTED PLANT EXTRACTS IN GREY- WATER TREATMENT

click on whatsapp