DESIGN AND IMPLEMENTATION OF A COMPUTER BASED QUALITY ASSURANCE MONITORING SYSTEM, case study of etisalat

By

Author

Presented To

Department of Computer Science

ABSTRACT

This project is about the design and implementation of a computer based quality assurance monitoring system. A quality assurance monitoring is very necessary as it will contribute to the corporate performance of an organization. The method used in implementing the design was based on top-down approach.  This is done by starting with the general concept of what is required by the existing system that it is lacking and breaking them into component parts which are then simplified with the introduction of the new system.  More features can still be added to the system to make it more reliable for efficient results. . The new system was designed using Microsoft visual basic 6.0 programming language. This language was chosen because of its easy syntax and features for developing windows based applications.

TABLE OF CONTENT

Title page

Certification

Dedication

Acknowledgement

Absract

CHAPTER ONE

11      Introduction

12      Statement of the problem

13      Objective of the study

14      Significance of the study

15      Scope of the study

16      Limitation of the study

17      Definition of terms

CHAPTER TWO

20      LITERATURE REVIEW

CHAPTER THREE

30      System analysis and design

31      Introduction

32      Brief history/description of the case study

33      Organizational chart

34      Analysis of the system

35      Data collection

36      Data analysis technique

37      Problem definition

38      System design

39      System specification

310  System structure

CHAPTER FOUR

40          System implementation and    

41    documentation

42    coding

43  test running

44  installation procedure and documentation

45  change over method

46  trainning of operator/staff

47  system maintenance

CHAPTER FIVE

50      Summary, recommendation and conclusion

51      Summary

52      Recommendation

53      Conclusion

       Bibliography

       Appendices

CHAPTER ONE

11  INTRODUCTION

       An organisation will benefit from establishing an effective quality assurance monitoring system The cornerstone of a quality organisation is the concept of the customer and supplier working together for their mutual benefit For this to become effective, the customer-supplier interfaces must extend into, and outside of, the organisation, beyond the immediate customers and suppliers

Quality assurance is the process of verifying or determining whether products or services meet or exceed customer expectations Quality assurance is a process-driven approach with specific steps to help define and attain goals This process considers design, development, production, and service

The most popular tool used to determine quality assurance is the Shewhart Cycle, developed by Dr W Edwards Deming This cycle for quality assurance consists of four steps: PlanDoCheck, and Act These steps are commonly abbreviated as PDCA

The four quality assurance steps within the PDCA model stand for:

  • Plan: Establish objectives and processes required to deliver the desired results
  • Do: Implement the process developed
  • Check: Monitor and evaluate the implemented process by testing the results against the predetermined objectives
  • Act: Apply actions necessary for improvement if the results require changes

PDCA is an effective method for monitoring quality assurance because it analyzes existing conditions and methods used to provide the product or service customers The goal is to ensure that excellence is inherent in every component of the process Quality assurance also helps determine whether the steps used to provide the product or service is appropriate for the time and conditions In addition, if the PDCA cycle is repeated throughout the lifetime of the product or service, it helps improve internal company efficiency

12  STATEMENT OF THE PROBLEM

There has been a constant quest by man since creation to improve on the quality of his life and existence, this ever increasing quest has been necessitated and propelled by the simple need for man to address the challenges posed by his environment  Some of the challenges associated with Phone Calls include

1  Poor Quality: The sound quality is not clear and sharp There are noise and distortions when calls are being made

2 Security: Sometimes the issue of security of identity might not be guaranteed

3 Capacity: The digital network service cannot allow more calls to be handled at a time

4  Tariff: Depending on the distance within the country the service rate differs

13  OBJECTIVE OF THE STUDY

The primary objective of this study is to design and implement a computer based quality assurance monitoring system  This will ensure that two important requirements are met:

1  The customers’ requirements " confidence in the ability of the organisation to deliver the desired product and service consistently meeting their needs and expectations

2  The organisation’s requirements " both internally and externally, and at an optimum cost with efficient use of the available resources " materials, human, technology and information

14  SIGNIFICANCE OF THE STUDY

The importance of this research work is based o the following:

1          It will help to solve the problem faced by administrative and marketing  department

2          It enables an organisation to achieve the goals and objectives set out in its policy and strategy

3          This research work will equally be valuable for students who may carryout similar research in related field for reference purposes

This will also assist other organization and system designers to completely design a computer based quality assurance monitoring system which will in turn make for efficiency, smooth and better performance of administrative activities

15  SCOPE OF THE STUDY

The main objective of this study is to identify a better way of designing and implementing a computer based quality assurance monitoring system that will totally reduce the problems faced by the existing system  The study is narrowed down to Etisalat Nigeria for the computation of Subscribers’ call and quality of service rendered It was the range of perception or understanding which gave rise to the action taken in implementing the desired program, designed to handle pools of complaints, criticism and suggestions by subscribers  This will help in the effective and efficient tracking of information on subscriber’s activity as well as monitoring the administrative and marketing activities

16  LIMITATIONS OF THE STUDY

A number of factors militated against this project which poses some difficulties, they are as follows;

1    Unwillingness of the respondent to release basic and necessary facts

2    Cost of sourcing of information from relevant journals, materials, Internet and respondents at the administrative area is exorbitant

3    Insufficient material at the school library has also militated on the progress of this research as most of the books in the library are irrelevant to this study

4    The stress of combining lectures and research work has not being easy on my own part

17  DEFINITION OF TERMS

For a clear understanding of the terminology and the following terms are hereby operationally defined

CHANNELS: These are voice channels that each call uses to connect on the network

COMPUTER:  This is a device that works under the control of stored programs, automatically accepting, storing and processing of data to produce information which is the result of that processing

CONGESTION: Congestion is the unavailability of network to the subscriber at the time of making a call  

CREDENTIAL:  This is an electronic representation of your identity; it links an individual to a technology such as personal identification numbers, usernames and passwords

DATA SERVICE: The data service like SMS fax, offered by GSM makes things easier for people

DATABASE:  This is a single organized collection of structured data stored with a minimum of duplication of data items so as to provide a consistent and control of pool of data

ENTITY:  This is anything about which data can be stored

GSM: Global system for mobile communications

INFORMATION:  this is a fact about something and it also a data that has been converted into a more useful or intelligent form for decision making

OPERATOR: These are the network service providers

PROGRAM:  This is a set of instructions that is written in the language of the computer

SUBSCRIBER: These are individuals that are subscribed to the network and can only use the network services if they have the sim card

SYSTEM:  here, it means a computer system that is aimed or designed to provide efficient means of information storage and retrieval of data files

RECORD:  This is a written account of something that is kept so that it can be looked at and used in the future

About E-Project Material Centre


E-Project Material Centre is a web service aimed at successfully assisting final year students with quality, well researched, reliable and ready made project work. Our materials are recent, complete (chapter 1 to Minimum of Chapter 5, with references) and well written.INSTANT ACCESS! INSTANT DOWNLOAD. Simply select your department, choose from our list of topics available and explore your data

Why Students Love to Use E-Project Material ?


Guaranteed Delivery Getting your project delivered on time is essential. You cannot afford to turn in your project past the deadline. That is why you must get your project online from a company that guarantees to meet your deadline. e-Project Topics Material Centre is happy to offer instant delivery of projects listed on our website. We can handle just about any deadline you send our way. Satisfaction Guaranteed We always do whatever is necessary to ensure every customer's satisfaction

Disclaimer


E-Project Topics Material Centre will only provide projects as a reference for your research. The projects ordered and produced should be used as a guide or framework for your own project. The contents of the projects should be able to help you in generating new ideas and thoughts for your own project. It is the aim of e-Project Topics Centre to only provide guidance by which the projects should be pursued. We are neither encouraging any form of plagiarism nor are we advocating the use of the projects produced herein for cheating.

Terms and Condition


Using our service is LEGAL and IS NOT prohibited by any university/college policies You are allowed to use the original model papers you will receive in the following ways:
  • As a source for additional understanding of the subject
  • As a source for ideas for you own research (if properly referenced)
  • For PROPER paraphrasing ( see your university definition of plagiarism and acceptable paraphrase) Direct citing ( if referenced properly)
Thank you so much for your respect to the authors copyright
X

Need Help Finding or Downloading Your Project Material?

If you don't see the topic you're looking for or You need urgent/express attention, click the WhatsApp Icon/link below to contact ADMIN and get the material you need instantly. We are always available online to attend to your needs. Thanks