DESIGN AND IMPLEMENTATION OF PRODUCTION CONTROL SYSTEM

By

Author

Presented To

Department of Computer Science

ABSTRACT

This project will be centered on the production control system. This production control system being operated manually ad due to the numerous problem encountered and over payment. A design was taken to computerized in order to check this problem the problem were identified after series of interviews and examination of document after which analysis will be made and a computerized procedure recommended. This project will also suggest how to successfully implement the computerized procedure and to overcome the obstacle that would hinder the successful implementation of the system. The new system was developed using visual basic 6.0 and access database. This language was chosen because of its easy syntax and features for developing windows based applications.

CHAPTER ONE  1.0     INTRODUCTION

In his definition K.O. Hockyer, defined production in 1990 as an act of putting together human being, materials, plant and money in order to provide goods and services. The success of production comes about as a result of effective planning execution and control of activities within the frame work of the cooperate objective within the frame work of the cooperative objective.

[edsanimate_start entry_animation_type= "wobble" entry_delay= "0" entry_duration= "0.5" entry_timing= "linear" exit_animation_type= "" exit_delay= "" exit_duration= "" exit_timing= "" animation_repeat= "infinite" keep= "yes" animate_on= "load" scroll_offset= "" custom_css_class= ""]CHECK OUT MORE PROJECT TOPICS IN COMPUTER SCIENCE[edsanimate_end]

This a place where people are employed for the purpose of making, uttering, reparing and or lamenting, finishing clearing, washing, breaking and adopting for sale of any articles.

The factory is regarded as a continued self sufficient body and it depend upon integration only when other parts of the organization change. Although this view is fact changing, the dangers f these visions are great, for example government registration may face a marketing change which requires a design modification in turn, can alter processes in such a way that operations may be displayed with consequent redundancy and retaining problems.

This problem would have seen and their effect integrated to look, outside the four walls of their machine production unit. Similarly a board decision to change from a selling policy where orders are accepted to marketing policy. Where orders are sought will inevitably demand major changes. In the white system of factory management. Again, this can be foreseen it the factory managers look in wards and out wards.

Furthermore, the factory itself provide the environment for it own constituent department and again the interaction of parts within themselves and with host environment. The interdependency between the two products important consequences.

  1. Changes within the firm affect the environment to survive therefore, organizations must be prepared to respond to change and managers must not think as if any decision to affect a change is only internal
  2. Change in the environment, which imposes change in the organization.

Today one of the most potentially powerful change agents is the computer, which can permit the consideration problems that are more complex than any which can be death with. For decision of the managers to be right, the information normally must be timely accurate etc good information therefore help to reduce uncertainly. A system that generates good information normally is seen, addressed or sensed as a group of components that interact to achieve a purpose such as the production of goods.

[edsanimate_start entry_animation_type= "wobble" entry_delay= "0" entry_duration= "0.5" entry_timing= "linear" exit_animation_type= "" exit_delay= "" exit_duration= "" exit_timing= "" animation_repeat= "infinite" keep= "yes" animate_on= "load" scroll_offset= "" custom_css_class= ""]CHECK OUT MORE PROJECT TOPICS IN COMPUTER SCIENCE[edsanimate_end] 1.1 HISTORICAL BACKGROUND OF THE STUDY

Seven up bottle company development in Nigeria is one of the argest independent manufacturer and distribution of the well-known and widely consumed brands of soft drinks in Nigeria. Their brand are pepsi. 7 up Miranda teen and mountain dew, which we produce and market will dur present 9 manufacturing plants. The also market over 200 distribution centers that we also call depots spread over the nooks and crane of Nigeria. Our workforce is currently the in the neigbourhood of 35 employees. The cost associated with a unit of sale increased in Q2 2009 over the corresponding period in Q2 2008. This is reflected in the PB1 margain which decreased to 5. 62% in Q2 2009 6.44% as at Q2 2008, and down from 6.38% as at the end of the financial year in March, 2009. This shows that the company’s total cost as a percentage of to stands at 94.38% up marginally from 93.36% recorded in the corresponding period of 2003. PAT margin currently stands at 4 78%, down from 5.26% in the corresponding period of 2008, but from 4.78%, down 5.26% in the corresponding that the percentage of 90, PBT and PAT in the Q2 2009 result to the fully year audited TO, PBY and PAT for the period ended March to the 2009 show that it performs better both in log line and botton line in HYI. This can be attributed to the Christian and new year sales and other ceremonies usually associated with year end.

To provide a system that will reduce the over head in maintaining independent date fills with its associated redundancy and integrity problems.

1.3 SCOPE OF STUDY

The system is a tool for controlling production function that go on daily in the 7up Company. For this reason aspects of production control such as scheduling and manufacturing authorization is not covered, including some aspect of dispatch processes. This system handle the material (stock) control but does not go into the purchasing and costing. It provides the necessary report that help in determine when to make purchase it generate the bills of various models or vehicles produced in seven up.

It monitors and control the activity of various parties to provide timely information that bears on meeting schedule.

1.4     LIMITATION OF THE STUDY

It is tested and proved, fact that the road to success is smooth therefore the researcher encounter some hindrances.

SOME OF ITEM WITH ME

  1. Time constant
  2. Financial constant

1.5     SIGNIFICANCE OF THE STUDY

This research work will help to access and document report from various departments within the company, which will affect immediate decision-making. It will also solve the problem of misplacing important document and accurate recording the system will help to meet up with customer order and eliminate the problem of broken promises.

[edsanimate_start entry_animation_type= "wobble" entry_delay= "0" entry_duration= "0.5" entry_timing= "linear" exit_animation_type= "" exit_delay= "" exit_duration= "" exit_timing= "" animation_repeat= "infinite" keep= "yes" animate_on= "load" scroll_offset= "" custom_css_class= ""]CHECK OUT MORE PROJECT TOPICS IN COMPUTER SCIENCE[edsanimate_end] 1.6     DEFINITION OF PERIODS

For a clear understanding of the terminology and the following terms are hereby operationally defined.

COMPUTER

It can be defined as devices that accept data in one form (input and process to produce data in another form output as information.

PROGRAM

This is a set of instruction written in a language of computer. A program is used to make the computer perform a specific task calculating interest period to saving account holder.

SYSTEM

These are set of instructions that are to be carried out by computer in order to accomplish a given task.

HARDWARE

These are those parts of the computer that we touch and see (physical parts) e.g. keyboard, monitor, mouse etc.

SOFTWARE

These are sets of instructions that are to be carried out by computer in order to accomplish a given task

About E-Project Material Centre


E-Project Material Centre is a web service aimed at successfully assisting final year students with quality, well researched, reliable and ready made project work. Our materials are recent, complete (chapter 1 to Minimum of Chapter 5, with references) and well written.INSTANT ACCESS! INSTANT DOWNLOAD. Simply select your department, choose from our list of topics available and explore your data

Why Students Love to Use E-Project Material ?


Guaranteed Delivery Getting your project delivered on time is essential. You cannot afford to turn in your project past the deadline. That is why you must get your project online from a company that guarantees to meet your deadline. e-Project Topics Material Centre is happy to offer instant delivery of projects listed on our website. We can handle just about any deadline you send our way. Satisfaction Guaranteed We always do whatever is necessary to ensure every customer's satisfaction

Disclaimer


E-Project Topics Material Centre will only provide projects as a reference for your research. The projects ordered and produced should be used as a guide or framework for your own project. The contents of the projects should be able to help you in generating new ideas and thoughts for your own project. It is the aim of e-Project Topics Centre to only provide guidance by which the projects should be pursued. We are neither encouraging any form of plagiarism nor are we advocating the use of the projects produced herein for cheating.

Terms and Condition


Using our service is LEGAL and IS NOT prohibited by any university/college policies You are allowed to use the original model papers you will receive in the following ways:
  • As a source for additional understanding of the subject
  • As a source for ideas for you own research (if properly referenced)
  • For PROPER paraphrasing ( see your university definition of plagiarism and acceptable paraphrase) Direct citing ( if referenced properly)
Thank you so much for your respect to the authors copyright
X

Need Help Finding or Downloading Your Project Material?

If you don't see the topic you're looking for or You need urgent/express attention, click the WhatsApp Icon/link below to contact ADMIN and get the material you need instantly. We are always available online to attend to your needs. Thanks