Site Logo E-PROJECTTOPICS

DETERMINATION OF THE PROSPECT OF PARTNERING AS PROCUREMENT METHOD IN THE NIGERIAN CONSTRUCTION INDUSTRY


📝


Presented To


Environmental Design Department

📄 Pages: 83       🧠 Words: 9455       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 273      

⬇️ Download (Complete Report) Now!

ABSTRACT
Due to the complex nature and characteristics of the industry, adversarial attitudes are usually involved and therefore, new ways in carrying out management processes to attain an improved performance and a qualitative project delivery in the industry is necessary. Partnering is a set of strategic action that deliver marked improvements in construction performance and project success will be attained more readily than the other traditional management approaches. The determination of the Prospect of Partnering as a Procurement method in the Nigerian Construction Industry was achieved by investigating the awareness, applicability, benefits and challenges of partnering as a procurement method. Structured questionnaire was administered and analyzed by percentage using Statistical Product for Social Sciences (SPSS) and a Relative Importance Index (RII) was used for ranking. Tables and charts were subsequently used to express the results as descriptive presentations. Inferences were made from the analysis carried out and high percentage responses were indicated on the level of awareness of partnering in the industry with 90.0%, 91.7%, and 77.0% as indicated by the Clients, Contractors and Consultants respectively. On the level of applicability however, there was little indication of just 5.0% and 6.8% from the Contractors and Consultants respectively, but high percentage response was indicated for the Clients with a percentage response of 87.9%. On the most beneficial factor in implementing partnering in the Nigerian Construction Industry, „Achieving better buidability?, „reduction in the rate of litigation? and „better opportunity for innovation and value engineering? were identified with RII values of 0.96, 0.76 and 0.86 as seen by the clients, contractors and consultants respectively. On the challenges of implementing partnering, both the clients and contractors share the same view noting that „inadequate knowledge and skills of partnering processes viii pose the highest challenge with a very high RII value of 1.0. However, the consultants viewed „Corruption? also with a very high RII value of 0.99 as the most challenging factor this procurement method. It is recommended that both the consultants and the contractors should adopt partnering as a procurement method especially for large projects in order to gain the benefits of such procurement process.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 83       🧠 Words: 9455       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 273      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

AN APPRAISAL OF THE PERFORMANCE OF STAKEHOLDERS MANAGEMENT IN CONSTRUCTION PROJECTS EVALUATION OF PROJECT RISK AND THE DETERMINATION OF CONTINGENCY SUM FOR BUILDING DEVELOPMENTS IN NIGERIA THE EFFECTS OF THE EXPIRATION OF THE WORLD TRADE ORGANIZATION'S MULTIFIBRE AGREEMENT ON NIGERIA’S TEXTILE INDUSTRY EVALUATING MATERIAL APPLICATION WASTE ON BUILDING CONSTRUCTION SITES ASSESSMENT OF DETERMINANTS OF CONSTRUCTION TENDER SUM ASSESSMENT OF ORGANISATIONAL LEADERSHIP FOR KNOWLEDGE MANAGEMENT PRACTICE IN THE NIGERIAN CONSTRUCTION INDUSTRY AN ASSESSMENT OF THE NIGERIAN CONSTRUCTION INDUSTRY’S READINESS TO ADOPT VALUE MANAGEMENT PROCESS IN EFFECTIVE PROJECT DELIVERY MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA COST IMPLICATIONS OF VARIATIONS IN CONSTRUCTION PROJECTS IN NIGERIA AN APPRAISAL OF CONSTRUCTION PROJECT PLANNING IN NIGERIAN INDIGENOUS CONSTRUCTION COMPANIES ASSESSMENT OF PROFESSIONAL'S PERCEPTION OF KNOWLEDGE AND SKILLS REQUIREMENT OF CONTRACTORS FOR MASS HOUSING CONSTRUCTION ASSESSMENT OF MOTIVATION OF NON-CONSTRUCTION PROFESSIONALS IN CONSTRUCTION COMPANIES A SURVEY OF CONCRETE PRACTICE ON SELECTED CONSTRUCTION SITES IN NIGERIA MODIFICATION OF NIGERIAN TRADITIONAL MEN’S HORIZONTAL LOOM TO ENHANCE PRODUCTIVITY OF THE NARROW BAND FABRIC THE SUITABILITY OF HUSKSCRETE BLOCKS AS CONSTRUCTION UNITS A COMPARATIVE STUDY OF AHMADU BELLO UNIVERSITY TEXTILE DESIGN PROGRAMMES AND JOB EXPECTATIONS OF IT'S GRADUATES IN THE TEXTILE INDUSTRY AN APPRAISAL OF PERFORMANCE MEASUREMENT PRACTICE OF CONSTRUCTION FIRMS MODELLING THE INTER-RELATIONSHIPS AMONGST ELEMENTS OF SUSTAINABILITY STRATEGIES FOR SUSTAINABLE MANAGEMENT OF CONSTRUCTION PROJECTS COMPARATIVE STUDY OF PRINT BASED GRAPHIC DESIGN FACILITIES IN SELECTED UNIVERSITIES AND THE GRAPHIC DESIGN INDUSTRY TOTAL ELECTRON CONTENT ESTIMATION AND ANALYSIS OVER THE NIGERIAN GLOBAL NAVIGATION SATELLITE SYSTEM PERMANENT REFERENCE NETWORK

click on whatsapp