DESIGN, CONSTRUCTION AND TESTING OF AN OUTWARD RADIAL-FLOW REACTION WATER TURBINE


📝


Presented To


Engineering Department

📄 Pages: 83       🧠 Words: 7877       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 480      

⬇️ Download (Complete Report) Now!

ABSTRACT
An outward radial flow reaction water turbine was designed based on Euler one-dimensional theory, constructed and tested to drive a 6W bicycle electric dynamo using water from supply mains. The turbine watered and lit the place it was tested eliminating the use of energy from other costlier sources which are not as environmental friendly. Available literature showed that water and steam had been used in providing the needed pressure for turbines based on the one-dimensional theory with successes recorded in the past. Dedicated efforts were made in Europe and America at improving different designs until Pelton impulse turbine, the Francis turbine and the Kaplan turbine now universally accepted were satisfactorily designed. In the production of this turbine (water sprinkler), the interest was more on power generation than watering, therefore four arms were used to discharge more water so as to deliver surplus of useful power. Consequently, the design angular speed of the turbine, the rotor arm diameter, the work done on each arm by the fluid, the tangential force and tolerances were determined. Mild steel, cast aluminium alloy and stainless steel were used to fabricate this turbine because they were readily available, cheap and machinable. A range of power output of 0.42W to 2.66W was obtained for a range of mains pressure of 2 5 10 5.1 mN ? to 2 5 10 8.2 mN ? . The results obtained from readings taken were tabulated and graphs plotted accordingly. The optimum performance occurred at 2 5 10 2 mN ? , a speed of 600rpm and a mass flow rate of 0.685 kg/s. The maximum power obtained at maximum mains pressure of 2 5 10 8.2 mN ? was 2.66W. The cost of the water turbine stood at thirty five thousand, three hundred and eighty naira only (N35, 380.00) and this would reduce greatly when the water turbine is mass produced. Power was generated to lit the place that the water turbine was used from the residual power head.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 83       🧠 Words: 7877       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 480      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

DESIGN AND CONSTRUCTION OF RADIATION ALARM DEVICE EVALUATION OF WATER ADVANCE MODELS FOR FURROW IRRIGATION SYSTEM DESIGN, CONSTRUCTION AND PERFORMANCE EVALUATION OF A LIQUIFIED PETROLEUM GAS INCUBATOR YIELD AND WATER USE RESPONSE OF WATERMELON UNDER DEFICIT IRRIGATION AND MULCH MODELLING AND SIMULATION OF AMMONIA-WATER SEPARATION FOR APPLICATION IN ABSORPTION HEAT PUMP OPTIMIZATION OF ACTIVATED CARBON PREPARATION FROM CORNCOB WASTEWATER TREATMENT DEVELOPMENT OF CHITOSAN-RICE HUSK ASH COMPOSITE ADSORBENT FOR REMOVAL OF CRUDE OIL FROM CONTAMINATED WATER EFFECT OF FAULTY DESIGN AND CONSTRUCTION ON BUILDING MAINTENANCE Design Construction, Simulation and Testing of a 300W Wind Powered Battery Charger ASSESSMENT OF THE IMPACT IMPACT OF CLIMATE CHANGE ON WATER RESOURCES AVAILABILITY IN THE SOKOTO-RIMA RIVER BASIN DESIGN, CONSTRUCTION AND TEST OF A PASSIVE SOLAR TRACKING DEVICE DESIGN, CONSTRUCTION AND SIMULATION OF MAIZE COBS FLUIDIZED BED COMBUSTOR INFLUENCE OF FINES CONTENT ON WATER AND CHEMICAL FLOWS THROUGH COMPACTED LATERITIC SOIL LINERS PERFORMANCE EVATUATTON OF IRRIGATION WATER DISTRIBUTION SYSTEMS OF THE KANO RIVER PROJECT ASSESSMENT OF GROUNDWATER POTENTIAL ZONES IN OKEERO LGA OF KWARA STATE NIGERIA USING GIS-BASED INTEGRATED APPROACH THE EFFECT OF COMMUNITY SANITATION PRACTICE ON WATER QUALITY IN SELECTED COMMUNITIES ASSESSMENT OF THE PERFORMANCE OF WATER SUPPLY SERVICE IN KADUNA NORTH WATER WORKS A STUDY OF THE RAPID METHOD OF EARTHWORK CONSTRUCTION CONTROL DESIGN, CONSTRUCTION AND TESTING OF A CHARCOAL FIRED CRUCIBLE FURNACE FOR MELTING OF 10KG OF ALUMINIUM MODELLING OPTIMAL WATER RESOURCES ALLOCATION IN TIGA DAM

click on whatsapp