ABSTRACT
The beneficiation of the Agbado Okudu iron ore deposit located in Kogi State, Nigeria was investigated. The investigation involved determining the chemical composition and mineralogical characteristics of the run-of-mine. Followed by determination of the work index of the ore and then separation tests using shaking table, magnetic technique and a combination of the two techniques. The results of the tests carried out revealed that the Agbadu okudu iron ore contained on the average a total iron content (38.82% FeT), 49.10% (Si02) and other element. Thin sections of the ore sample examined under polarized light revealed that the iron bearing minerals are predominantly magnetite and hematite with a combined average percentage distribution of 69% and the mineral in abundant after the iron bearing minerals is quartz. The grindability test reveals that the Agbado Okudu iron ore has and average work index of about 4.32 kwh/tonne. The results of gravity separation shows that a concentrate with a maximum grade of 55.81% (FeT), and a recovery of 66.40% at particle size fraction -56 + 45?m could be produced. While magnetic separation alone produced a concentrate with an optimum grade of 57.43% (FeT), and a recovery of 82.12% at particle size fraction of - 80+63?m. However, combination of gravity separation technique (shaking table) followed by magnetic separation technique could only produce a concentrate with an optimum grade of 57.17% (FeT), and a recovery of 80.85% at a particle size fraction of -63+53?m. Hence, based on the results obtained from the concentration tests, the Agbado Okudu iron ore deposit can be best beneficiated using magnetic technique to produce a concentrate that can serve as feed for pig iron production by conventional blast furnace route.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 87       🧠 Words: 11469       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 506      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

DEVELOPMENT OF AN ACCEPTABLE USE POLICY FRAMEWORK FOR IBBUL COMMUNICATION NETWORK PREDICTION OF MOMENT CAPACITY OF CONCRETE SLABS SINGLY REINFORCED WITH CARBON FIBER REINFORCED PLASTICS (CFRP) USING SIMULATED ANNEALING DEVELOPMENT OF AN IMPROVED INTEGRATED ROUTING PROTOCOL FOR OPPORTUNISTIC NETWORK WITH CONGESTION CONTROL USING PRE-EMPTIVE DATA EVICTION SEPARATION OF TANTALUM AND NIOBIUM FROM NIGERIAN TANTALITE USING AQUEOUS BIPHASE SYSTEM MODELLING AND OPTIMIZATION OF PID CONTROLLER’s PARAMETERS FOR DEEP SPACE ANTENNA POSITIONING SYSTEM USING GENETIC ALGORITHM DEVELOPMENT AND CHARACTERIZATION OF SELF-HEALING CAR PAINT USING CHITOSAN ELECTROMAGNETIC COMPATIBILITY ASSESSMENT IN A DUAL RADIO FREQUENCY ENVIRONMENT DETERMINATION OF AN IMPROVED SPECTRUM SENSING THRESHOLD FOR COGNITIVE RADIO USING SMOOTHED PSEUDO WIGNER-VILLE DISTRIBUTION RELIABILITY-BASED ANALYSIS OF COMPOSITE SOLID SLENDER TIMBER COLUMNS WITH ALUMINIUM LAMINATES USING SELECTED NIGERIAN TIMBER SPECIES EFFECTS OF COPPER ADDITION AND SECTION THICKNESS ON SOME MECHANICAL PROPERTIES AND THE MORPHOLOGY OF GRAPHITE FLAKES IN GREY CAST IRON A STUDY OF THE DEPHOSPHORIZATION OF KOTON KARFE IRON ORE BY ACIDIC LEACHING NON-CIRCULAR BORING ON THE LATHE USING CHAIN DRIVE FOR POWER TRANSMISSION MODELING, SIMULATION AND STABILIZATION OF A DOUBLE QUAD INVERTED PENDULUM SYSTEM (DQIP) USING A LINEAR QUADRATIC REGULATOR (LQR) CONTROLLER POTENTIAL OF SESAME OIL (Sesanum indicum) BATH AS AN AUSTEMPERING MEDIUM FOR DUCTILE CAST IRON OPTIMUM DESIGN OF REINFORCED CONCRETE RAFT FOUNDATIONS USING FINITE ELEMENT ANALYSIS CONSTRUCTION OF A ZIRCON- CEMENT PAD AND CALIBRATION OF PORTABLE SURVEY METERS FOR ENVIRONMENTAL RADIATION MEASUREMENTS DEVELOPMENT OF FIREFLY ALGORITHM BASED METHOD FOR DISTRIBUTED GENERATION PLANNING IN AN UNBALANCED THREE-PHASE DISTRIBUTION NETWORK USING VOLTAGE STABILITY INDEX THE USE OF RICE HUSK ASH AS A STABILIZING AGENT FOR LATERITIC SOILS IN THE MANUFACTURE OF BLOCKS FOR LOW COST HOUSING CEMENT STABILIZATION OF LATERITIC SOIL USING IRON ORE TAILING AS ADMIXTURE SOCIO-ECONOMIC BENEFITS OF IRRIGATION USING BORROW PIT WATER

click on whatsapp