Site Logo E-PROJECTTOPICS

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF THE PROPOSED KIRI HYDRO-ELECTRIC POWER PROJECT


📝


Presented To


Engineering Department

📄 Pages: 97       🧠 Words: 12537       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 336      

⬇️ Download (Complete Report) Now!

ABSTRACT
This thesis assesses the potential environmental as well as the social impacts that are associated with the conversion of Kiri dam to a hydro-electric power dam. As case studies, five villages namely; Mabonde, Gelode, WuroJauro, Kiri and New Talum in the Guyuk District of the Adamawa State region respectively, were selected for questionnaire survey and scheduled focus group discussion. A total of 150 questionnaires were administered in the villages and 8 persons from each village were involved in the scheduled focus group discussions. Consultations were made to the institutional stakeholders of the project planning including GOBADEC, UBRBDA, State Ministry of Environment Yola, and State Ministry of Works Yola to ascertain their understanding of the project impacts on the environment. Site visit was also undertaken to ascertain the formation and modification of the of the proposed project environment since the inception of the dam. Geographic Information Systems and remote sensing was applied to study the changes in land-use and vegetation cover since the impoundment of the river in 1982 and it was found that 27.77 km2 of land was lost to the lake reservoir, 20.96 km2 of land was lost to flood plains and 6.82 km2 of land lost to agriculture/settlement, totalling 55.55 km2 of land lost in the last two decades. The result of the study has revealed that the potential adverse impacts of the proposed project such as flooding, pollution and threat to public health to mention a few, are mostly limited to the construction stage of the project. However, numerous benefits such as boost to economic growth, skill transfer to locals and increase in local economic activities are to be enjoyed during both the construction and operational stages of the hydropower project. To avert the potential adverse environmental and social problems in the area, the study recommends equal partnership between the project owners, responsible authority (UBRBDA) with the local people to combat environmental degradation. Furthermore, the use of computer based technologies like Remote Sensing and Geographical Information System (GIS) should be implemented to play a major role in assisting and combating the problems within the lake and dam catchment areas.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 97       🧠 Words: 12537       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 336      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

ASSESSMENT OF THE HYDROPOWER POTENTIAL OF GORONYO DAM IN SOKOTO STATE, NIGERIA DEVELOPMENT OF A SENSITIVITY INDEX BASED TECHNIQUE FOR UNIFIED POWER FLOW CONTROLLER PLACEMENT WITH CONTINGENCY ANALYSIS ON NIGERIA 330kV TRANSMISSION NETWORK ECONOMIC VIABILITY OF A SMALL HYDROPOWER PLANT AT ONUAKU RIVER, ABIA STATE NIGERIA INVESTIGATION OF HARDNESS AND IMPACT CHARACTERISTICS OF QUENCHED AND COLD TREATED DUCTILE CAST IRON ASSESSMENT OF TRANSIENT STABILITY ENHANCEMENT CAPABILITY OF UNIFIED POWER FLOW CONTROLLER IN A MULTI-MACHINE POWER SYSTEM INVESTIGATION OF ENVIRONMENTAL NOISE POLLUTION IN SELECTED LOCATIONS ASSESSMENT OF GROUNDWATER POTENTIAL ZONES IN OKEERO LGA OF KWARA STATE NIGERIA USING GIS-BASED INTEGRATED APPROACH HARMONICS MITIGATION ON VARIABLE FREQUENCY DRIVE USING SINGLE PHASE SHUNT ACTIVE POWER FILTER CONTROLLED BY ARTIFICIAL NEURAL NETWORK A CASE STUDY OF KILN UNIT OF DANGOTE CEMENT PLANT OBAJANA DEVELOPMENT OF MAINTENANCE SCHEDULES FOR NATIONAL ELECTRIC POWER AUTHORITY GENERATING FACILITIES BIOCLIMATIC RESPONSE IN DESIGN OF FACULTY OF ENVIRONMENTAL SCIENCES IN THE HOT DRY CLIMATE OF YOBE STATE UNIVERSITY (YSU), DAMATURU ASSESSMENT OF THE PERFORMANCE OF WATER SUPPLY SERVICE IN KADUNA NORTH WATER WORKS CONSTRUCTION OF A ZIRCON- CEMENT PAD AND CALIBRATION OF PORTABLE SURVEY METERS FOR ENVIRONMENTAL RADIATION MEASUREMENTS ASSESSMENT OF THE IMPACT OF POWER OUTAGES ON COMMERCIAL CONSUMERS COLDROOMS CONSUMERS AT TRANS-AMADI AREA CLIMATE VARIABILITY AND ITS IMPACT ON WATER RESOURCES OF LOWER KADUNA RIVER CATCHMENT NIGERIA COMPARATIVE ASSESSMENT OF THE STRENGTHS OF SOLID AND GLUED LAMINATED TIMBER ASSESSMENT OF WATER AVAILABILITY UNDER THE INFLUENCE OF CLIMATE VARIABILITY CHARACTERISATION OF SOME NIGERIAN COALS FOR POWER GENERATION STOCHASTIC ASSESSMENT OF NIGERIAN TIMBERS FOR BRIDGE DECKS IN ACCORDANCE TO AASHTO LFRD FAILURE EVALUATION OF ENGINEERING PROJECTS IN NIGERIA RELIABILITY ASSESSMENT OF GSM POWER SYSTEM NETWORK

click on whatsapp