Site Logo E-PROJECTTOPICS

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF THE PROPOSED KIRI HYDRO-ELECTRIC POWER PROJECT


📝


Presented To


Engineering Department

📄 Pages: 97       🧠 Words: 12537       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 221      

⬇️ Download (Complete Report) Now!

ABSTRACT
This thesis assesses the potential environmental as well as the social impacts that are associated with the conversion of Kiri dam to a hydro-electric power dam. As case studies, five villages namely; Mabonde, Gelode, WuroJauro, Kiri and New Talum in the Guyuk District of the Adamawa State region respectively, were selected for questionnaire survey and scheduled focus group discussion. A total of 150 questionnaires were administered in the villages and 8 persons from each village were involved in the scheduled focus group discussions. Consultations were made to the institutional stakeholders of the project planning including GOBADEC, UBRBDA, State Ministry of Environment Yola, and State Ministry of Works Yola to ascertain their understanding of the project impacts on the environment. Site visit was also undertaken to ascertain the formation and modification of the of the proposed project environment since the inception of the dam. Geographic Information Systems and remote sensing was applied to study the changes in land-use and vegetation cover since the impoundment of the river in 1982 and it was found that 27.77 km2 of land was lost to the lake reservoir, 20.96 km2 of land was lost to flood plains and 6.82 km2 of land lost to agriculture/settlement, totalling 55.55 km2 of land lost in the last two decades. The result of the study has revealed that the potential adverse impacts of the proposed project such as flooding, pollution and threat to public health to mention a few, are mostly limited to the construction stage of the project. However, numerous benefits such as boost to economic growth, skill transfer to locals and increase in local economic activities are to be enjoyed during both the construction and operational stages of the hydropower project. To avert the potential adverse environmental and social problems in the area, the study recommends equal partnership between the project owners, responsible authority (UBRBDA) with the local people to combat environmental degradation. Furthermore, the use of computer based technologies like Remote Sensing and Geographical Information System (GIS) should be implemented to play a major role in assisting and combating the problems within the lake and dam catchment areas.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 97       🧠 Words: 12537       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 221      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

ASSESSMENT OF THE IMPACT OF POWER OUTAGES ON COMMERCIAL CONSUMERS COLDROOMS CONSUMERS AT TRANS-AMADI AREA HYDRAULIC AND CONTAMINANT TRANSPORT PERFORMANCE OF COMPACTED LATERITIC SOIL– BENTONITE MIXTURES PROPOSED AS WASTE CONTAINMENT BARRIER DEVELOPMENT OF ENVIRONMENTALLY FRIENDLY BIODEGRADABLE CUTTING FLUID FROM SOYA BEANS (GLYCINE MAX) ASSESSMENT OF HEAVY METALS IN SOME SELECTED VEGETABLE FIELDS IRRIGATED WITH WASTE WATER ALONG KUBANNI WATER COURSE RELIABILITY ANALYSIS OF HIGH VOLTAGE POWER EQUIPMENT IN AJAOKUTA STEEL COMPANY LIMITED (ASCL) DEVELOPMENT OF A SENSITIVITY INDEX BASED TECHNIQUE FOR UNIFIED POWER FLOW CONTROLLER PLACEMENT WITH CONTINGENCY ANALYSIS ON NIGERIA 330kV TRANSMISSION NETWORK SIMULATION, DEVELOPMENT AND PERFORMANCE EVALUATION OF A SOLAR/GAS HYBRID POWERED ABSORPTION AIR – CONDITIONING SYSTEM MODELING AND SIMULATION OF COMPACT FLUORESCENT LAMP FOR THE ANALYSIS AND MITIGATION OF HARMONICS INJECTION INTO POWER DISTRIBUTION NETWORK RELIABILITY ASSESSMENT OF THE STRENGTH CAPACITY OF SOLID TIMBER COLUMNS IN FRP LAMINATES AND SPRAYS ASSESSMENT OF THE HYDROPOWER POTENTIAL OF GORONYO DAM IN SOKOTO STATE, NIGERIA Development of an Optimal Reconfiguration Algorithm for Radial Distribution Electrical Power Networks ASSESSMENT OF TRANSIENT STABILITY ENHANCEMENT CAPABILITY OF UNIFIED POWER FLOW CONTROLLER IN A MULTI-MACHINE POWER SYSTEM ASSESSMENT OF WATER AVAILABILITY UNDER THE INFLUENCE OF CLIMATE VARIABILITY ASSESSMENT OF OIL SPILLAGE AND ITS CONTROL IN THE OIL AND GAS INDUSTRY IN NIGERIA INVESTIGATION OF ENVIRONMENTAL NOISE POLLUTION IN SELECTED LOCATIONS CHARACTERISATION OF SOME NIGERIAN COALS FOR POWER GENERATION MODELING AND SIMULATION OF A GRID CONNECTED SOLAR-HYDRO HYBRID SYSTEM TO SUPPLEMENT POWER SUPPLY IN KADUNA NORTH A STUDY OF THE UNIFIED POWER QUALITY CONDITIONER (UPQC) FOR IMPROVED RADIAL DISTRIBUTION NETWORK HARMONICS MITIGATION ON VARIABLE FREQUENCY DRIVE USING SINGLE PHASE SHUNT ACTIVE POWER FILTER CONTROLLED BY ARTIFICIAL NEURAL NETWORK A CASE STUDY OF KILN UNIT OF DANGOTE CEMENT PLANT OBAJANA EXPERIMENTAL AND PROBABILISTIC ASSESSMENT OF CONCRETE INCORPORATING EXPANDED POLYSTYRENE (EPS) WASTE AT ELEVATED TEMPERATURES

click on whatsapp