Site Logo E-PROJECTTOPICS

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF THE PROPOSED KIRI HYDRO-ELECTRIC POWER PROJECT


📝


Presented To


Engineering Department

📄 Pages: 97       🧠 Words: 12537       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 144      

⬇️ Download (Complete Report) Now!

ABSTRACT
This thesis assesses the potential environmental as well as the social impacts that are associated with the conversion of Kiri dam to a hydro-electric power dam. As case studies, five villages namely; Mabonde, Gelode, WuroJauro, Kiri and New Talum in the Guyuk District of the Adamawa State region respectively, were selected for questionnaire survey and scheduled focus group discussion. A total of 150 questionnaires were administered in the villages and 8 persons from each village were involved in the scheduled focus group discussions. Consultations were made to the institutional stakeholders of the project planning including GOBADEC, UBRBDA, State Ministry of Environment Yola, and State Ministry of Works Yola to ascertain their understanding of the project impacts on the environment. Site visit was also undertaken to ascertain the formation and modification of the of the proposed project environment since the inception of the dam. Geographic Information Systems and remote sensing was applied to study the changes in land-use and vegetation cover since the impoundment of the river in 1982 and it was found that 27.77 km2 of land was lost to the lake reservoir, 20.96 km2 of land was lost to flood plains and 6.82 km2 of land lost to agriculture/settlement, totalling 55.55 km2 of land lost in the last two decades. The result of the study has revealed that the potential adverse impacts of the proposed project such as flooding, pollution and threat to public health to mention a few, are mostly limited to the construction stage of the project. However, numerous benefits such as boost to economic growth, skill transfer to locals and increase in local economic activities are to be enjoyed during both the construction and operational stages of the hydropower project. To avert the potential adverse environmental and social problems in the area, the study recommends equal partnership between the project owners, responsible authority (UBRBDA) with the local people to combat environmental degradation. Furthermore, the use of computer based technologies like Remote Sensing and Geographical Information System (GIS) should be implemented to play a major role in assisting and combating the problems within the lake and dam catchment areas.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 97       🧠 Words: 12537       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 144      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

FAILURE EVALUATION OF ENGINEERING PROJECTS IN NIGERIA ECONOMIC VIABILITY OF A SMALL HYDROPOWER PLANT AT ONUAKU RIVER, ABIA STATE NIGERIA PERFORMANCE EVATUATTON OF IRRIGATION WATER DISTRIBUTION SYSTEMS OF THE KANO RIVER PROJECT AN ASSESSMENT OF THE QUALITY OF SANDCRETE HOLLOW BLOCKS WITH PARTICULAR REFERENCE TO BAUCHI AND GOMBE STATES ASSESSMENT OF THE HYDROPOWER POTENTIAL OF GORONYO DAM IN SOKOTO STATE, NIGERIA ASSESSMENT OF MUNICIPAL SOLID WASTE IMPACT ON GROUNDWATER QUALITY OF SOME SELECTED AREAS SIMULATION, DEVELOPMENT AND PERFORMANCE EVALUATION OF A SOLAR/GAS HYBRID POWERED ABSORPTION AIR – CONDITIONING SYSTEM RELIABILITY ASSESSMENT OF RC CONTINUOUS BEAM DESIGNED TO BS 8110 (1985) CRITERIA IMPACT OF VEHICULAR TRAFFIC EMISSIONS ON AMBIENT AIR QUALITY IN KADUNA METROPOLIS DESIGN AND ENVIRONMENTAL - BEHAVIOUR MODELLING OF A BLUETOOTH CONTROLLED PLANTER ROBOT ASSESSMENT OF THE IMPACT OF POWER OUTAGES ON COMMERCIAL CONSUMERS COLDROOMS CONSUMERS AT TRANS-AMADI AREA DEVELOPMENT OF ENVIRONMENTALLY FRIENDLY BIODEGRADABLE CUTTING FLUID FROM SOYA BEANS (GLYCINE MAX) ASSESSMENT OF OIL EXTRACTS FROM TIGER NUT(Cyperus esculentus), WATER MELON (Citrullus vulgaris) and NEEM SEEDS (Azadirachta indica) AS CUTTING FLUIDS IN DRILLING OPERATION OF MILD STEEL RELIABILITY ASSESSMENT OF GSM POWER SYSTEM NETWORK COMPARATIVE ASSESSMENT OF THE STRENGTHS OF SOLID AND GLUED LAMINATED TIMBER ASSESSMENT OF SAWDUST ACTIVATED CARBON (SAC) IN THE TREATMENT OF AQUACULTURE EFFLUENT MODELING AND SIMULATION OF A SOLAR POWERED ADSORPTION REFRIGERATION SYSTEM SYNTHESIS AND CHARACTERISATION OF REACTIVE DYES FROM QUINAZOLINONE DERIVATIVES AND THEIR COLOUR ASSESSMENT ON COTTON FABRIC APPLICATION OF AN OPTIMAL TUNING TECHNIQUE OF ON-LOAD TAPCHANGING TRANSFORMER FOR POWER QUALITY IMPROVEMENT IN TRANSMISSION LINE NETWORK FLOOD RISK ASSESSMENT OF OFU RIVER CATCHMENT IN NIGERIA

click on whatsapp