Site Logo E-PROJECTTOPICS

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF THE PROPOSED KIRI HYDRO-ELECTRIC POWER PROJECT


📝


Presented To


Engineering Department

📄 Pages: 97       🧠 Words: 12537       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 506      

⬇️ Download (Complete Report) Now!

ABSTRACT
This thesis assesses the potential environmental as well as the social impacts that are associated with the conversion of Kiri dam to a hydro-electric power dam. As case studies, five villages namely; Mabonde, Gelode, WuroJauro, Kiri and New Talum in the Guyuk District of the Adamawa State region respectively, were selected for questionnaire survey and scheduled focus group discussion. A total of 150 questionnaires were administered in the villages and 8 persons from each village were involved in the scheduled focus group discussions. Consultations were made to the institutional stakeholders of the project planning including GOBADEC, UBRBDA, State Ministry of Environment Yola, and State Ministry of Works Yola to ascertain their understanding of the project impacts on the environment. Site visit was also undertaken to ascertain the formation and modification of the of the proposed project environment since the inception of the dam. Geographic Information Systems and remote sensing was applied to study the changes in land-use and vegetation cover since the impoundment of the river in 1982 and it was found that 27.77 km2 of land was lost to the lake reservoir, 20.96 km2 of land was lost to flood plains and 6.82 km2 of land lost to agriculture/settlement, totalling 55.55 km2 of land lost in the last two decades. The result of the study has revealed that the potential adverse impacts of the proposed project such as flooding, pollution and threat to public health to mention a few, are mostly limited to the construction stage of the project. However, numerous benefits such as boost to economic growth, skill transfer to locals and increase in local economic activities are to be enjoyed during both the construction and operational stages of the hydropower project. To avert the potential adverse environmental and social problems in the area, the study recommends equal partnership between the project owners, responsible authority (UBRBDA) with the local people to combat environmental degradation. Furthermore, the use of computer based technologies like Remote Sensing and Geographical Information System (GIS) should be implemented to play a major role in assisting and combating the problems within the lake and dam catchment areas.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 97       🧠 Words: 12537       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 506      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

BACTERIAL FORAGING ALGORITHM BASED TUNING OF ON-LOAD TAP CHANGING TRANSFORMER FOR VOLTAGE REGULATION IN POWER TRANSMISSION NETWORK ECONOMIC VIABILITY OF A SMALL HYDROPOWER PLANT AT ONUAKU RIVER, ABIA STATE NIGERIA ASSESSMENT OF MUNICIPAL SOLID WASTE IMPACT ON GROUNDWATER QUALITY OF SOME SELECTED AREAS ASSESSMENT OF THE IMPACT IMPACT OF CLIMATE CHANGE ON WATER RESOURCES AVAILABILITY IN THE SOKOTO-RIMA RIVER BASIN MODELING AND SIMULATION OF A SOLAR POWERED ADSORPTION REFRIGERATION SYSTEM AN ASSESSMENT OF THE QUALITY OF SANDCRETE HOLLOW BLOCKS WITH PARTICULAR REFERENCE TO BAUCHI AND GOMBE STATES DESIGN AND ENVIRONMENTAL - BEHAVIOUR MODELLING OF A BLUETOOTH CONTROLLED PLANTER ROBOT INVESTIGATION OF ENVIRONMENTAL NOISE POLLUTION IN SELECTED LOCATIONS DEVELOPMENT OF ENVIRONMENTALLY FRIENDLY BIODEGRADABLE CUTTING FLUID FROM SOYA BEANS (GLYCINE MAX) ASSESSMENT OF GROUNDWATER POTENTIAL FOR RURAL WATER SUPPLY SCHEME USING GEOGRAPHIC INFORMATION SYSTEM (GIS) IN EDE NORTH LGA OF OSUN STATE NIGERIA FLOOD RISK ASSESSMENT OF OFU RIVER CATCHMENT IN NIGERIA ELECTROMAGNETIC COMPATIBILITY ASSESSMENT IN A DUAL RADIO FREQUENCY ENVIRONMENT ASSESSMENT OF THE PERFORMANCE OF WATER SUPPLY SERVICE IN KADUNA NORTH WATER WORKS SILTING CHARACTERISTICS OF DISTRIBUTARIES IN KANO RIVER PROJECT ASSESSMENT OF THE IMPACT OF POWER OUTAGES ON COMMERCIAL CONSUMERS COLDROOMS CONSUMERS AT TRANS-AMADI AREA EXPERIMENTAL AND PROBABILISTIC ASSESSMENT OF CONCRETE INCORPORATING EXPANDED POLYSTYRENE (EPS) WASTE AT ELEVATED TEMPERATURES FAILURE EVALUATION OF ENGINEERING PROJECTS IN NIGERIA EXPERIMENTAL STUDY OF VARIABLE FREQUENCY INDUCTION GENERATOR FOR SMALL SCALE WIND POWER DEVELOPMENT CHARACTERISATION OF SOME NIGERIAN COALS FOR POWER GENERATION RELIABILITY ASSESSMENT OF RC CONTINUOUS BEAM DESIGNED TO BS 8110 (1985) CRITERIA

click on whatsapp