ABSTRACT
This project is written to help sports scheduling and reporting especially Nnamdi Azikiwe stadium Enugu in the areas they encounter problems in keeping their duty scheduling and reporting and the solution given to tackle those problem.
The research was carried out of many difficulties such as time factors, money and inability to get much information that could have been of help. But still with all those the researcher came up with something readable and valuable to any body that goes through it.
The project dwell more on computerized activity scheduling and reporting system for sport events. This is to ensure that every sport event comply with her duty schedule. This is implemented with visual basic programming language and Microsoft Access for effective duty roster information keeping.
TABLE OF CONTENT
Title page i
Certification ii
Dedication iii
Acknowledgement iv
Abstract v
Table of contents vii
CHAPTER ONE
INTRODUCTION 1
1.1 Background of the study 1
1.2 State of the problem 2
1.3 Purpose of the study 3
1.4 Aims and objectives 3
1.5 Scope of study 5
1.6 Limitations of study 5
1.7 Assumptions 6
1.8 Definition of terms 7
CHAPTER TWO
LITERATURE REVIEW 8
CHAPTER THREE
3.1 Description and analysis of existing system 15
3.2 Fact finding method used 17
3.3 Organization structure 19
3.4 Objectives of Existing system 21
3.5 Input, Process and Output Analysis 22
3.6 Information Flow Diagrams 26
3.7 Problems of the Existing System 27
3.8 Justification of the New System 28
CHAPTER FOUR
4.1 Design of the New System 30
4.2 Input Specification and design 30
4.3 Output specification and design 32
4.4 File Design 34
4.5 Procedure chart 36
4.6 System flow chart 38
4.7 System requirements 40
CHAPTER FIVE
5.1 Implementation 42
5.2 Program Design 45
5.3 Program Flowchart 48
5.4 Pseudo code 54
5.5 Source Program: Test Run 59
CHAPTER SIX
Documentation 60
CHAPTER SEVEN
7.1 Recommendation 62
7.2 Conclusion 64
Bibliography