Site Logo E-PROJECTTOPICS

DEVELOPMENT OF PUBLIC PROCUREMENT STRATEGY FOR THE PROVISION OF POTABLE WATER INFRASTRUCTURE TO LOW INCOME URBAN AREAS (LIUAs)

(A CASE STUDY OF NIGERIA)


📝


Presented To


Environmental Design Department

📄 Pages: 100       🧠 Words: 7016       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 236      

⬇️ Download (Complete Report) Now!

ABSTRACT
The successful public procurement of infrastructure is an essential element in the achievement of sustainable development. This success is dependent on the procurement strategy adopted. The ability of a procurement strategy to achieve the project objectives is based on the strategy being specifically tailor made to the infrastructure type and the context of the procurement. Research has shown that water is a key element in achieving the Sustainable Development Goals because it plays a part in achieving fourteen of the seventeen goals. With the majority of the world's poor living in urban areas with limited access to clean drinking water. Its infrastructure is clearly the most essential. Nigeria has the fourth largest low income urban population. These limited resources that Nigeria has to effectively utilise them to provide this essential service and provide sustainable development for its citizenry. The study was aimed at developing a public procurement strategy for the provision of potable water infrastructure to low income urban areas in Nigeria. The Research carried out was the case studies of water infrastructure procured for the Millennium Development Goals Nigeria for MDG Goal 7 in Kaduna, Anambra and Ogun states. The research population was made up of three key components; the contractors, the clients and the communities. The client and contractors were interviewed to ascertain the effectiveness of the existing strategy in terms of achieving their project goals, critically analyse the strategy and propose improvements. The communities participated in the focus group to ascertain their assessment of the existing strategy, their role in the process and propose improvement. The research found that only one public strategy was identified to be used by the Client Organisation which was based on competitive tendering and the traditional procurement process. Although it had some advantages such as competition, it did not achieve both the primary and secondary goals of the procurement process and hence was deemed ineffective. Some of the limitations identified of the current strategy included; political interference, lack of community involvement, inadequate design, transparency, no feedback mechanism, sustainability and maintenance issues .Consequently, a strategy framework was developed after a critical analysis of the problems and the context in which they emerge, and the various possible solutions to the problems were identified and evaluated. The developed strategy framework which consisted of the five stages (need definition, design, tendering, construction and operation) and three resource assessment gateways. The framework inculcated the importance of defined primary and secondary project objectives, a clear and distinct role for the community and other stakeholders, effective risk distribution, and provided a more holistic flexible sustainable strategy that could be implemented for immediate use under current laws or the planned reform. The study recommends that when developing an effective procurement strategy, achieving all specific goals of key stakeholders and an effective community and stakeholder management system should be given priority.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 100       🧠 Words: 7016       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 236      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

PERCEPTION OF CONSTRUCTION PROFESSIONALS ON ATTRIBUTES OF PROJECT SPONSORS AND CONCESSIONAIRES OF PUBLIC PRIVATE PARTNERSHIP PROJECTS APPRAISAL OF THE URBAN MANAGEMENT CHALLENGE OF INFORMAL LAND DELIVERY THE IMPLEMENTATION OF AN URBAN MASTERPLAN DEVELOPMENT OF AN INDIGENOUS CERAMICS BEAD MODEL CLAY FOR PLAY TO ENHANCE LEARNING OF CHILDREN WITH LEARNING DISABILITIES A STUDY OF CONTEMPORARY PUBLIC OUTDOOR SCULPTURES IN FOUR SELECTED STATES IN WESTERN NIGERIA GEOSPATIAL MAPPING OF WATER DISTRIBUTION SYSTEM IN-HOUSE PROFESSIONALS IN PROJECT DEVELOPMENT AND IMPLEMENTATION EVALUATING THE EFFECTS OF BUILDING FORMS ON THERMAL COMFORT IN OFFICE BUILDINGS IN HOT HUMID AREAS AVAILABILITY OF BOREHOLE SYSTEMS FOR POTABLE WATER SUPPLY ANALYSIS OF POVERTY IN ZARIA URBAN AREA AND THE URBAN MANAGEMENT IMPLICATIONS THE IMPLEMENTATION OF THE MASTER PLAN FOR THE FEDERAL CAPITAL CITY, ABUJA: A Review of the problems of Development Control TABLE LOOM FABRICATION AND PRODUCT DEVELOPMENT ANALYTICAL AND APPROXIMATE VARIANCE OF PUBLIC BUILDING TOTAL PROJECT COST, ESTIMATION BY MEAN COMPONENT COSTS METHOD PLANNING FOR THE PROVISION OF PARKING FACILITIES IN THE CENTRAL BUSINESS DISTRICT OF KANO DEVELOPMENT OF LOW-TEMPERATURE GLAZES FROM SELECTED RAW MATERIALS PLANNING, DECISION MAKING AND PUBLIC PARTICIPATION IN HOUSING PROGRAMMES IN NIGERIA USER SATISFACTION STUDY OF SELECTED PUBLIC–PRIVATE PARTNERSHIP PROJECTS AN EVALUATION OF THE ENVIRONMENTAL FACTORS THAT LEAD TO ABANDONMENT OF PUBLIC BUILDING PROJECTS LOCAL GOVERNMENT SECRETARIAT, SAMINAKA (EXPRESSION OF CULTURE ON THE ARCHITECTURE OF PUBLIC BUILDINGS IN KADUNA STATE) PLANNING FOR COMMERCIAL DEVELOPMENT IN OSOGBO

click on whatsapp