AN ECONOMIC CONSIDERATION OF PAVEMENT OVERLAY DESIGN STRATEGIES

(A CASE STUDY OF BAUCHI �“ JOS ROAD)

By

Author

Presented To

Department of Engineering

ABSTRACT
Pavement deterioration is revealed through many indications, among which is roughness of its surface which is a collective consequence of the various deterioration factors of the pavement. The economic impact of road deterioration is considerable, and usually outweighs the consideration of riding comfort, and thus providing the strongest objective for evaluating roads improvement policies and corresponding cost implications. This work attempts to address the effect of applying different strategies of overlay as remedies to arrest the escalation of costs incurred by both road agencies and users, and finally, determines the economic optimum strategy that minimize the total system cost. In order to effectively achieve this, six different strategies (the do nothing, 200mm,150mm 100mm,75mm, and 50mm) were investigated to reflect both service performance and economic evaluation. Relevant data for evaluating performance were collected from the pavement evaluation unit (PEU) of the Federal Ministry of Works, Kaduna and data concerning unit costs of road works were determined from the World Bank’s “ROCKS” (Road cost knowledge system). The Highway Design and Maintenance Model (HDM III) was used in the analysis of the strategies. The model predicts the pavement deterioration and maintenance effects, and calculates annual costs of road construction, vehicle and operation, needed to perform the economic evaluation of the alteration. Results obtained show that, for all the strategies considered, road user cost exceeded all other costs and the strategy with the thickest overlay (i.e. 200mm) has the lowest road user cost of N33.4b. Also, the rate of deterioration was lowest for the 200mm strategy, and is also associated with the highest user 9 benefit N10.4b. On the other hand, the 75mm thick overlay strategy had the lowest Total Systems Cost (TSC) of N35.5b and the highest net present value (NPV) of N7.3b. The 75mm design strategy is therefore selected as the optimum strategy.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

About e-Project Material Centre


e-Project Material Centre is a web service aimed at successfully assisting final year students with quality, well-researched, reliable, and ready-made project work. Our materials are recent, complete (chapter 1 to Minimum of Chapter 5, with references), and well-written. INSTANT ACCESS! INSTANT DOWNLOAD. Simply select your department, choose from our list of topics available, and explore your data.

Why Students Love to Use e-Project Material?


Guaranteed Delivery: Getting your project delivered on time is essential. You cannot afford to turn in your project past the deadline. That is why you must get your project online from a company that guarantees to meet your deadline. e-Project Topics Material Centre is happy to offer instant delivery of projects listed on our website. We can handle just about any deadline you send our way. Satisfaction Guaranteed: We always do whatever is necessary to ensure every customer's satisfaction.

Disclaimer


e-Project Topics Material Centre will only provide projects as a reference for your research. The projects ordered and produced should be used as a guide or framework for your own project. The contents of the projects should help you generate new ideas and thoughts for your own project. It is the aim of e-Project Topics Centre to only provide guidance by which the projects should be pursued. We are neither encouraging any form of plagiarism nor are we advocating the use of the projects produced herein for cheating.

Terms and Conditions


Using our service is LEGAL and IS NOT prohibited by any university/college policies. You are allowed to use the original model papers you will receive in the following ways:
  • As a source for additional understanding of the subject
  • As a source for ideas for your own research (if properly referenced)
  • For PROPER paraphrasing (see your university definition of plagiarism and acceptable paraphrase) Direct citing (if referenced properly)
Thank you so much for your respect to the author's copyright.

Refund and Privacy Policy


  • Refunds: All sales are final. However, if you encounter any issues with accessing your purchased material, kindly contact our support team for immediate resolution.
  • Privacy Policy: Your personal information is protected and will not be shared with third parties. We ensure secure payment processing and data confidentiality.

Contact Information


X

Need Help Finding or Downloading Your Project Material?

If you don't see the topic you're looking for or You need urgent/express attention, click the WhatsApp Icon/link below to contact ADMIN and get the material you need instantly. We are always available online to attend to your needs. Thanks