STUDIES OF INDUSTRIAL WASTEWATER EFFLUENT TREATMENT IN WASTE STABILIZATION POND

By

Author

Presented To

Department of Engineering

ABSTRACT
Large volumes of wastewater are generated in Nigeria from industrial activities which often cause water pollution when they are not properly treated before being discharged into receiving water bodies. The conventional wastewater treatment plants are expensive and associated with high running and maintenance cost. These plants are also associated with generation of large volumes of chemical sludge. In view of the global economic recession cheaper options are being considered for treatment of industrial waste water such as brewery wastewater effluents. In this work the suitability of waste stabilization pond (WSP)as a cheaper alternative in the treatment of industrial wastewater was investigated so as to obtain design data, empirical and kinetic parameters for the wastewater treatment in WSP.A pilot WSP was designed and constructed for the treatment of raw brewery wastewater effluent. The Brewery wastewater effluents were collected from Nigerian Breweries PLC, Kudendan light industrial layout, Kaduna.The parameters considered for the design include: temperature, influent flow rate, influent BOD, Net Evaporation which are 28 oC, 0.2 m2/day, 1135.5 mg/L and 0.612 m3, respectively. The pond capacity is 4.7m3 (4700 L) and it was designed to reduce the BOD loading by 90% for a retention period of 21 days at an influent flow rate of 0.2m3/day.The pilot WSP was operated on a continuous steady state flow at an average ambient temperature of 29 OC over the retention period.The parameters that were analyzed on the raw and treated wastewater include: pH, Temperature, Total suspended solids (TSS), Turbidity, Chlorides, Biological Oxygen Demand (BOD5), Chemical Oxygen Demand (COD), Electrical conductivity (EC), Total dissolved solids (TDS) and Total Coliform. The mean values of these physicochemical parameters for the raw brewery wastewater for a period of 27 days were 3.76, 29.7 oC, 1048.9 mg/L, 6.09 NTU, 573.5 mg/L, 1128.8 mg/L, 2122.1 mg/L, 1011.8 μS/cm, 826.9 mg/L and 1 E-coli/100 mL respectively. At the retention period of 25 days, the values are 6.7, 27 OC, 199 mg/L, 2.0 NTU, 268 mg/L, 350 mg/L, 660 mg/L,287 μS/cm, 296 mg/L and 9 E-coli/100 ml respectively, after which negligible changes were recorded for the listed parameters at higher detention time. The BOD removal rate constant was 0.088 per day and the BOD-COD correlation was BOD = 0.531COD – 1.960.The BOD removal regression model was BOD = 0.0001t5- 0.0034t4- 0.1419t3+ 6.6096t2–102.09t 1114.5 and the pond performance efficiencies for the reduction/removal of TSS, Turbidity, Chlorides, BOD, COD, Conductivity and TDS are 81%, 67.2%, 53.2%, 69%, 68.9%, 71.6% and 64.2% respectively. The retention time was found to be 25 days as against 21 days calculated and this could be attributed to weather variation which influences the factors that enhance wastewater stabilization such as wind, temperature, and sunlight. The WSP was also found to be cost effective because of its low energy requirement for its operation and low maintenance. The pond performance was also found to be satisfactory and the kinetic parameter obtained can be utilized in the scale up design for industrial scale WSP.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

About e-Project Material Centre


e-Project Material Centre is a web service aimed at successfully assisting final year students with quality, well-researched, reliable, and ready-made project work. Our materials are recent, complete (chapter 1 to Minimum of Chapter 5, with references), and well-written. INSTANT ACCESS! INSTANT DOWNLOAD. Simply select your department, choose from our list of topics available, and explore your data.

Why Students Love to Use e-Project Material?


Guaranteed Delivery: Getting your project delivered on time is essential. You cannot afford to turn in your project past the deadline. That is why you must get your project online from a company that guarantees to meet your deadline. e-Project Topics Material Centre is happy to offer instant delivery of projects listed on our website. We can handle just about any deadline you send our way. Satisfaction Guaranteed: We always do whatever is necessary to ensure every customer's satisfaction.

Disclaimer


e-Project Topics Material Centre will only provide projects as a reference for your research. The projects ordered and produced should be used as a guide or framework for your own project. The contents of the projects should help you generate new ideas and thoughts for your own project. It is the aim of e-Project Topics Centre to only provide guidance by which the projects should be pursued. We are neither encouraging any form of plagiarism nor are we advocating the use of the projects produced herein for cheating.

Terms and Conditions


Using our service is LEGAL and IS NOT prohibited by any university/college policies. You are allowed to use the original model papers you will receive in the following ways:
  • As a source for additional understanding of the subject
  • As a source for ideas for your own research (if properly referenced)
  • For PROPER paraphrasing (see your university definition of plagiarism and acceptable paraphrase) Direct citing (if referenced properly)
Thank you so much for your respect to the author's copyright.

Refund and Privacy Policy


  • Refunds: All sales are final. However, if you encounter any issues with accessing your purchased material, kindly contact our support team for immediate resolution.
  • Privacy Policy: Your personal information is protected and will not be shared with third parties. We ensure secure payment processing and data confidentiality.

Contact Information


X

Need Help Finding or Downloading Your Project Material?

If you don't see the topic you're looking for or You need urgent/express attention, click the WhatsApp Icon/link below to contact ADMIN and get the material you need instantly. We are always available online to attend to your needs. Thanks