Site Logo E-PROJECTTOPICS

EVALUATION OF LEVELISED COST OF ELECTRICITY GENERATED FROM HOT SPRING GEOTHERMAL RESOURCES IN NIGERIA

(A CASE STUDY OF RAFIN REEWA HOT SPRING, LERE LOCAL GOVERNMENT OF KADUNA STATE)


📝


Presented To


Engineering Department

📄 Pages: 91       🧠 Words: 11564       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 199      

⬇️ Download (Complete Report) Now!

ABSTRACT
This study work, Evaluation of Levelised Cost of Electricity Generated From Hot Spring Geothermal Resources in Nigeria aims to investigate the economical and technical prerequisites for electricity generation from Rafin Reewa hot spring located at Lere local government of Kaduna state; a potential development sites. Geothermal energy is thought to have great potential in Nigeria due to the high abundance of sedimentary rocks and numerous hot springs. However, it is still a relatively new technology that has not yet been proved to be economically viable at commercial scale in Nigeria. The study investigated both the technical and economical aspects of geothermal energy as a resource for electricity production. The technical investigation is based mainly on identifying the resource temperature at Rafin Reewa hot spring and subsequently which technology is suitable for use in the study area. In the economical section of the study, the impact of resource flow rate and resource depth (variables) on factors that determine the geothermal power plant construction costs are analyzed. Within each variable, geothermal power plant cost factors are calculated, and subsequently the levelised cost of electricity (LCOE) at power sales of 50MW was evaluated. The result of the study shows that the temperature of the geofluid at the study sites (Rafin Reewa) is 122.14oC, and hence this shows that Rafin Reewa hot spring is a hydrothermal geothermal resource suitable for air-cooled binary power plant. Consequently, the results of the study show electricity generation from geofluid of Rafin Reewa hot spring is viable. On the economic aspect of the study, the result shows that the total plant cost, exclusive of wells, for an air-cooled binary is $663,609,961 (N132, 721,992,200) for 50MW plant capacity at study site. The Levelised Cost of Electricity (LCOE) in cent/kWh is calculated using Geothermal Electricity Technology Model (GETEM). To evaluate the LCOE of the geothermal power plant, the impact of production flow rate and resource depth on the cost factors that influence LCOE were evaluated. The result of the study shows that the LCOE at a flow rate of 100kg/s and a resource depth of 1000m is 43.010cent/kWh (N86.02/kWh). Although both variable parameters influence the LCOE, the study shows that the LCOE is more sensitive to the production flow rate than the depth of the resources.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 91       🧠 Words: 11564       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 199      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

EVALUATION OF MECHANICAL AND CORROSION PROPERTIES OF MILD STEEL IN SOME ENVIRONMENTS INHIBITED BY AFRICAN LOCUST BEANS TREE MEASUREMENT AND EVALUATION OF THE PERFORMANCE PROPERTIES OF SELECTED LOCALLY PRODUCED LUBRICANTS (ENGINE OIL) SCILCRETE AS A CONSTRUCTION MATERIAL FOR LOW COST HOUSING SAMPLING OF LAND USE FROM LARGE SCALE AERIAL PHOTOGRAPHS EFFECTS OF ADDITIVES ON BIOGAS PRODUCTION FROM COW DUNG AND CHICKEN DROPPING MIXED WITH DIGITARIA SMUTS II CHROMIUM REMOVAL FROM CHELTECH (ZARIA) TANNERY EFFLUENT AS A FORM OF EFFLUENT TREATMENT A COMPARATIVE EVALUATION OF THE FIXED ROUTE AND ROUTEDEVIATION STRATEGIES OF OPERATING INTRA-URBAU TRANSIT ESTIMATION OF WATER EROSION OF A NIGERIAN GUINEA SAVANNA SOIL ASSESSMENT OF GROUNDWATER POTENTIAL FOR RURAL WATER SUPPLY SCHEME USING GEOGRAPHIC INFORMATION SYSTEM (GIS) IN EDE NORTH LGA OF OSUN STATE NIGERIA EFFECT OF ORANGE PEEL, WATERMELON PEEL, AND THEIR SYNERGISTIC EFFECT ON THE REMOVAL OF HEAVY METALS FROM DYE WASTEWATER DEVELOPMENT AND PERFORMANCE EVALUATION OF HYDRAULIC PISTON PRESS BIOMASS HOLLOW BRIQUETTE MAKING MACHINE EVALUATION OF THREE NIGERIAN FIBRE SOURCES FOR PULP AND PAPER PRODUCTION EVALUATION OF PULVERIZED COCONUT SHELL CHARCOAL AND PERIWINKLE SHELL FOR CARBURIZING MILD STEEL STUDYING THE OPTIMAL CONDITIONS FOR GLUCOSE AND BIO-ETHANOL PRODUCTION FROM SPIROGYRA AFRICANA FURFURAL PRODUCTION FROM MICROALGAE TIME AND COST PERFORMANCE LIABILITY ALLOCATION IN THE BUILDING PROCESS SORPTION OF METAL IONS FROM AQUEOUS SOLUTION BY POLYMER RESINS:DEVELOPMENT OF A GENERALIZED KINETIC MODEL COMPARATIVE STUDY OF BIOGAS PRODUCTION FROM COW DUNG, CHICKEN DROPPINGS AND CYMBOPOGON CITRATUS AS ALTERNATIVE ENERGY SOURCES DEVELOPMENT AND PERFORMANCE EVALUATION OF AN AGITATED QUENCHING TANK/BATH MANUFACTURING SYSTEM OPTIMIZATION: A STUDY OF UNITY AND EFFICIENCY IN PRODUCTION (UEP) IN PEUGEOT AUTOMOBILE NIGERIA (PAN)

click on whatsapp