EVALUATION OF LEVELISED COST OF ELECTRICITY GENERATED FROM HOT SPRING GEOTHERMAL RESOURCES IN NIGERIA

(A CASE STUDY OF RAFIN REEWA HOT SPRING, LERE LOCAL GOVERNMENT OF KADUNA STATE)


📝


Presented To


Engineering Department

📄 Pages: 91       🧠 Words: 11564       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 70      

⬇️ Download (Complete Report) Now!

ABSTRACT
This study work, Evaluation of Levelised Cost of Electricity Generated From Hot Spring Geothermal Resources in Nigeria aims to investigate the economical and technical prerequisites for electricity generation from Rafin Reewa hot spring located at Lere local government of Kaduna state; a potential development sites. Geothermal energy is thought to have great potential in Nigeria due to the high abundance of sedimentary rocks and numerous hot springs. However, it is still a relatively new technology that has not yet been proved to be economically viable at commercial scale in Nigeria. The study investigated both the technical and economical aspects of geothermal energy as a resource for electricity production. The technical investigation is based mainly on identifying the resource temperature at Rafin Reewa hot spring and subsequently which technology is suitable for use in the study area. In the economical section of the study, the impact of resource flow rate and resource depth (variables) on factors that determine the geothermal power plant construction costs are analyzed. Within each variable, geothermal power plant cost factors are calculated, and subsequently the levelised cost of electricity (LCOE) at power sales of 50MW was evaluated. The result of the study shows that the temperature of the geofluid at the study sites (Rafin Reewa) is 122.14oC, and hence this shows that Rafin Reewa hot spring is a hydrothermal geothermal resource suitable for air-cooled binary power plant. Consequently, the results of the study show electricity generation from geofluid of Rafin Reewa hot spring is viable. On the economic aspect of the study, the result shows that the total plant cost, exclusive of wells, for an air-cooled binary is $663,609,961 (N132, 721,992,200) for 50MW plant capacity at study site. The Levelised Cost of Electricity (LCOE) in cent/kWh is calculated using Geothermal Electricity Technology Model (GETEM). To evaluate the LCOE of the geothermal power plant, the impact of production flow rate and resource depth on the cost factors that influence LCOE were evaluated. The result of the study shows that the LCOE at a flow rate of 100kg/s and a resource depth of 1000m is 43.010cent/kWh (N86.02/kWh). Although both variable parameters influence the LCOE, the study shows that the LCOE is more sensitive to the production flow rate than the depth of the resources.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 91       🧠 Words: 11564       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 70      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

EVALUATION OF THREE NIGERIAN FIBRE SOURCES FOR PULP AND PAPER PRODUCTION EVALUATION OF NOISE LEVELS FROM VARIOUS SOURCES WITHIN ZARIA METROPOLIS DEVELOPMENT OF EUCALPYTUS TERETICORNIS COMPOSITE (BARKS AND LEAVES) ADSORBENT FOR ADSORPTION OF CHROMIUM (VI) AND LEAD (II) IONS FROM SIMULATED WASTEWATER MODIFICATION AND PERFORMANCE EVALUATION OF IAR GROUNDNUT SHELLER FOR SOME SELECTED VARIETIES OF PULSES FURFURAL PRODUCTION FROM MICROALGAE PERFORMANCE EVALUATION OF MINI SPRINKLER IRRIGATION SYSTEM: COMPARISON OF THE PLASTIC AND IRON MADE SPRINKLER SYSTEM EVALUATION OF THESTRUCTURAL PERFORMANCE OF ASPHALTIC CONCRETE HIGHWAY PAVEMENT EVALUATION OF RHEOLOGY OF HIGH DENSITY POLYPROPYLENE ASPHALT THE EVALUATION OF CERAMIC WASTE AS PARTIAL REPLACEMENT OF COARSE AGGREGATE IN HOT MIX ASPHALT DESIGN, DEVELOPMENT AND PERFORMANCE EVALUATION OF A FRUIT JUICE EXTRACTION MACHINE PRODUCTION AND PERFORMANCE EVALUATION OF BIODEGRADABLE GREASE (BIOGREASE) FROM Balanites aegyptiaca (DESERT DATE) SEED OIL UTILISATION OF SELECTED VARIETIES OF COTTON PLANTS GROWN IN NIGERIA FOR PAPERMAKING OPTIMISING PATIENTS FLOW AND RESOURCES UTILISATION IN THE OUT-PATIENT DEPARTMENT OF A PUBLIC HOSPITAL A CASE STUDY OF YUSUF DANTSOHO MEMORIAL HOPITAL KADUNA PERFORMANCE EVALUATION OF WUPA SEWAGE TREATMENT PLANT EFFECTS OF BENEFICIATION AND SALTING AGENTS ON YIELD AND QUALITY OF ALUM FROM KANKARA KAOLIN DEVELOPMENT AND PERFORMANCE EVALUATION OF HYDRAULIC PISTON PRESS BIOMASS HOLLOW BRIQUETTE MAKING MACHINE EFFECT OF CALCINATION TEMPERATURE ON THE COMPOSITION AND PHOTOCATALYTIC ACTIVITY OF NIGERIAN NATURAL ILMENITE, SPHALERITE AND WOLFRAMITE CHROMIUM REMOVAL FROM CHELTECH (ZARIA) TANNERY EFFLUENT AS A FORM OF EFFLUENT TREATMENT DEVELOPMENT OF CATALYST SUPPORT MATERIAL FROM PINDIGA BENTONITIC CLAY SCILCRETE AS A CONSTRUCTION MATERIAL FOR LOW COST HOUSING

click on whatsapp