SIMULATION, DEVELOPMENT AND PERFORMANCE EVALUATION OF A SOLAR/GAS HYBRID POWERED ABSORPTION AIR " CONDITIONING SYSTEM

By

Author

Presented To

Department of Engineering

ABSTRACT
In this study, a gas assisted solar powered absorption air – conditioning system was designed, constructed and tested under Zaria weather conditions in Nigeria. A technical and economic viability study of the system was first carried out by developing and simulating a TRNSYS model of the system to cool an office block with an average space cooling demand of 151.8kWh/m2 per annum, under Zaria weather conditions. System components were sized and optimized to give maximum coefficient of performance (COP), solar coefficient of performance (SCOP) and solar fraction (SF). Design of the optimised system components was done through a programming based design, optimisation and performance evaluation method using MATLAB. A reduced size version of the system, which includes a 4 kW absorption chiller prototype was constructed. Experimental tests were conducted on the constructed system. The experiments were carried out on a test room in the months of April and June 2017. The experimental days were classified as: hot clear sky days, fairly clear sky days, cloudy days and rainy days. Results indicated that the system is capable of operating in any of the days as classified. However, the cloudy days recorded the highest gas consumption of 0.95kg, as the system relied more on the gas boiler heating mode. The hot clear sky days recorded the least gas consumption of 0.48 kg as the system operated more on the solar power heating mode. Room temperatures were cooled to between 24oC and 27oC, from initial temperatures ranging from 29oC to 33oC. Maximum cooling power of 2.7 kW was achieved by the absorption chiller. Maximum daily average COP of 0.438 was attained. Solar fraction of 0.55 was achieved in the experimental day of April, while 0.27 was attained for June. Results from life cycle cost savings simulation showed energy savings of N2, 172,558 with 35m2 collector area for a period of 20 years. Life cycle cost savings analysis of the constructed system showed the system is economically viable in the Nigerian climate studied, with a savings of ?39,991.93 achievedwith a collector area of 1.7 m2over a 20 year period. Environmental impact assessment showed CO2 emission reduction in the range of 2.7% to 58.4%. It was concluded that the system operates satisfactorily in the Nigerian climate studied and it is economically viable. Recommendations for further improvements were made.

PLEASE NOTE

This material is a comprehensive and well-researched project, structured into
(1 - 5) chapters for clarity and depth.


To access the full content:

Click the Download Button Below

Or contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

About E-Project Material Centre


E-Project Material Centre is a web service aimed at successfully assisting final year students with quality, well researched, reliable and ready made project work. Our materials are recent, complete (chapter 1 to Minimum of Chapter 5, with references) and well written.INSTANT ACCESS! INSTANT DOWNLOAD. Simply select your department, choose from our list of topics available and explore your data

Why Students Love to Use E-Project Material ?


Guaranteed Delivery Getting your project delivered on time is essential. You cannot afford to turn in your project past the deadline. That is why you must get your project online from a company that guarantees to meet your deadline. e-Project Topics Material Centre is happy to offer instant delivery of projects listed on our website. We can handle just about any deadline you send our way. Satisfaction Guaranteed We always do whatever is necessary to ensure every customer's satisfaction

Disclaimer


E-Project Topics Material Centre will only provide projects as a reference for your research. The projects ordered and produced should be used as a guide or framework for your own project. The contents of the projects should be able to help you in generating new ideas and thoughts for your own project. It is the aim of e-Project Topics Centre to only provide guidance by which the projects should be pursued. We are neither encouraging any form of plagiarism nor are we advocating the use of the projects produced herein for cheating.

Terms and Condition


Using our service is LEGAL and IS NOT prohibited by any university/college policies You are allowed to use the original model papers you will receive in the following ways:
  • As a source for additional understanding of the subject
  • As a source for ideas for you own research (if properly referenced)
  • For PROPER paraphrasing ( see your university definition of plagiarism and acceptable paraphrase) Direct citing ( if referenced properly)
Thank you so much for your respect to the authors copyright
X

Need Help Finding or Downloading Your Project Material?

If you don't see the topic you're looking for or You need urgent/express attention, click the WhatsApp Icon/link below to contact ADMIN and get the material you need instantly. We are always available online to attend to your needs. Thanks